Produce Labour and Material Schedules for Ordering

   

Added on  2023-04-17

6 Pages610 Words438 Views
 | 
 | 
 | 
CPCCBC4005A Produce labour and material schedules for ordering
Modification History:
If Applicable
Unit Descriptor:
Terms and details of the project:
The address and details of the parties to the contract in the project
The total project Price
A description of the project to be undertaken
Building Regulation
Application of the Unit
Site Manager:
Foreman:
Estimator:
Project Manager:
Construction Builder:
Licensing/Regulatory Information:
Specification and project plan for the building project.
Starting date and finishing dates of the building project based on
the contract singed by both parties.
Insurance against building which should comply with the building
laws against risk.
Pre-requisities
Produce Labour and Material Schedules for Ordering_1

Pre-requisities: Nil
Employability Skill Information:
Site Manager: Degree in Civil Engineering with 10-12 years of
experience
Foreman: Diploma in Civil Engineering with 8-10 years of experience
Estimator: Degree in Civil Engineering with 10-12 years of experience
Project Manager: Degree in Civil Engineering with 15-20 years of
experience
Construction Builder: Should have experience in building
construction for 15-20 years.
Elements and Performance Criteria:
Contractual Requirement:
Local Government and regulatory Bodies for the approval of the
schedule:
Schedule include color selection
Variations to contracts, raised by the client or the builder, are
included in the schedules.
Produce material and labour schedules, overlays and orders.
Sl. No. Item Unit Price Quantity Rate
1 Face Bricks
2 Common
3 Mortar
4 Flashing
5 Venner Tiles
Produce Labour and Material Schedules for Ordering_2

6 Lintels
7 Painting
Job cost Analysis Sheet:
Sl. No. Item Estimated
Price
Actual Price Variance
1 Face Bricks
2 Common
3 Mortar
4 Flashing
5 Venner Tiles
6 Lintels
7 Painting
8 False Ceiling
9 Plumbing
(pipes and
Pipe Fitting)
10 Electrical
Equipments
11 AC
Painting Scheme:
Room Type Paint
Manufactur
er
Area Paint Type Finishes
Room 1
Room 2
Room 3
Room 4
Produce Labour and Material Schedules for Ordering_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Commercial Building Interior Cost in Sydney, Australia - Desklib
|9
|1713
|338

Bill of Quantities and General Conditions for Rehabilitation Work
|4
|887
|95