This paper discusses the Design-Build-Operate (DBO) model for project delivery system, which involves a third party responsible for completing the project on time and carrying out its maintenance operation throughout the project life. The paper covers the responsibilities, advantages, project life cycle cost, procurement methods, concern areas, and structure of the DBO model. The language barrier is identified as a major concern area in the DBO model. The DBO model is a cost-effective development scheme and is widely accepted by the private sector of the corporate area.