CE 2.1 Project Information Name of the project:Designing and Fabrication of 360 Degree Flexible Drilling Machine Location of the project:Please fill Project Duration:Please fill Organization:Please fill Role and Designation during the time:Team Member of the Project CE 2.2 Project Background CE 2.2.1 Characteristics of the project The 3600malleable drilling machine can be referred to as responsible to provide major benefits to the users such as rotational flexibility, minimization of time, lowering costs, reducing the total expenses of manufacturing as well as easy usages. This particular drilling machine creates a specific circular hole in the job or element by effective volume removal within the metal by drill bit cutting tool. This kind of tool is being used to drill holes of several sizes and of any other associated and significant operations with the drill bit. During execution of the project, I have successfully designed and contrived a 3600drilling machine after considering distinct specifications of motors. I have even considered a current range between 0.2 AMP until 1.2 AMP. Total speed that was to be considered was maximum of 4000 rpm. The respective power range undertaken within the specific project was within 2.4watt until 15watt and hence voltage was 12 V. I even wanted to create the project with extra effectiveness for putting the holes with
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
high and better precision over the cylindrical shells, block as well as engine head and also for the purpose of furniture making. Hence, in the project, I had successfully proposed the most compact design for my 3600drilling machine after considering each and every technical specification. CE 2.2.2 Objectives developed for the project I have maintained few of the most significant and major standards during the execution of this particular project and for the reason that this type of designing or working parameters were being followed efficiently. Hence, for the purpose of completing this project and then providing a perfect design for the 3600drilling machines and then making it extremely effective and efficient, I have eventually developed these objectives given below: ï‚·To suggest a detailed as well as compacted design for my3600drilling machines project. ï‚·To execute various operations such as spot facing, boring, grinding, lapping, tapping and various others. ï‚·To properly understand the complete working process of drilling machine after using DC motor over the full-wave rectifiers. ï‚·To identify and select several vital tools so that I can dismantle, assemble and then hold the project item. ï‚·To be sure that high accuracy as well as efficiency is enhanced during drilling of metal or other product. ï‚·To properly help the smaller as well as medium enterprise to reduce their operational costs by providing them certain cost effective3600drilling machines.
Project Supervisor Team Member (Me)Team MemberTeam Member CE 2.2.3 My area of work Since this was second professional project, I was much experienced than my previous project and hence I being recruited as the team member in this specific project. Moreover, I did not face much complexities while completing the tasks. After providing a completed design for the 3600drilling machines project, I also have to help my respective fellow team members to understand the subsequent requirements of project as well as the process or working principles of drilling machines with significant details. As, I comprised of skills like logical reasoning, the project supervisor kept confidence upon me to complete the works of project. CE 2.2.4 Project Group Figure 1: Team Members Associated with the project CE 2.2.5 My responsibilities throughout the project In this particular project of the 3600drilling machines, I was subsequently assigned to propose a detailed as well as compact project designing. I even wanted to create the drilling
machines more efficiently in comparison to traditional drilling machine. This perfect and well- aligned drilling machine needs stronger as well as fixed drill and thus I have utilized respective fixed drill for low space in drill beds and drill bits. My next subsequent duties involved providing the cylindrical hole for the needed depth or diameter over metal work piece. Since I was a team member here, I had the core responsibility for considering and understanding project constraints. Furthermore, I have also considered every specification of drill chucks such as 15mm length and 7mm diameter. CE 2.3 Distinctive Activity CE 2.3.1 Comprehending the Theory of the Project The major theories of mechanical engineering, which I had considered within the project were the working process of the drilling machines. This was initiated from the DC motors through distinctive full-wave rectifiers. In this scenario, I undertook a power source, which was acknowledged from the rectifier. This flexible arm rotated at the specified 3600and eventually moved at any place as soon as that drilling is required to the highest arm length. I had to perform this drilling for various drilling positions such as up and down as well as rotating mechanisms. These components of the drilling machine were motors, connecting rods, pulley, bearings, and screws and even drill bits.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Figure 2: Experimental Set up Diagram of the project This above provided figure depicts the complete set up for my 3600drilling machine. Major equipment of this project included horizontal arm, vertical arm, switch board, roller bearing, copper wire, base plate, motor, and drill bit, guider and suspension spring. CE 2.3.2 Engineering knowledge and skills applied in the project The major short coming, which I had during the project work was lack of problem solving skill. During project execution, I did not have the ability to effectively solve every situational problem that has occurred. However, I became eventually successful to use my core skillsorknowledgeofmechanicalengineeringandhencesolvedalloftheseproblems. Furthermore, my capability of thinking out of the box was one of the core advantage in this project. CE 2.3.3 Accomplishment and Task Performed I under undertook motor specification such as maximum speed for 4000rpm, range of current between 0.2 until 1.2AMP, 50Hz frequencies, 12volt voltage, range of power between
2.4 until 15watt and the selected supplying current was DC. Weights of my significant project machine were nearly 150gm, 3.17mm shaft diameter and of metal net material. For the designing and other machining parameters, I had undertaken these following readings from the project: CE 2.3.4 Identified issues and their solutions 2.3.4.1 Issues The most important technical difficulty that I have confronted in this work occurred while project drilling bit designing. I knew it very well that if the drill bits will break, this entire machine will not be working and thus the respective users will not have the capability of utilizing that specific machine. Another significant issue, which I had faced was the incorrect equipment selection. My fellow team member, to whom I have previously provided the core responsibility
of selecting correct equipment, eventually made a completely wrong list of equipment and thus my project was under stake. The next subsequent problem, which I had confronted in this case was during designing a respective point angle of my drill bit. However, I had done this mistake within the portion of designing and hence these pointing angles were not properly designed. The fourth difficulty, which I have confronted here occurred during vertical arm designing of 3600 drilling machine project. 2.3.4.2 Solutions Regarding drill bit issue I took the ideology to use twisted drill. It subsequently minimized the main complications for drill bit designing and thus it ensured that my drill bit will not get broken in an easy manner. Regarding the second issue I ensured that these entire lists were being made once again and thus it never creates any issue. Regarding the third distinctive issue, I had to use my knowledge of mechanical engineering. Moreover, I have also used my core skills for completely redesigning the drill bit part and thus my issue with point-angle was being resolved. For the final problem of the vertical arm I took extra time. However with the help of my supervisor I was able to solve it completely. CE 2.3.5 Plan to produce creative and innovative work I had made the significant strategy for producing an ingenious work after application of mechanical knowledge as well as skills. The horizontal, vertical or the radial movement of arms of these drilling heads eventually enabled the locating of subsequent drill spindle within any particular point.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
CE 2.4 Project Review CE 2.4.1 Project Overview The 3600drilling machine project was being utilized based on drilling of holes within various location and movement as well as the operation was completed with ease and extreme accuracy and efficiency. The specific project of drilling machine was also improvised the total productivity since it comprised of lowering the entire manufacturing cycle time and total machining time. CE 2.4.2 My contribution to work I had to propose a compact design of 3600drilling machine for this project. I had also collected with the entire group of project administration for clearing up of doubts in respect to project works. Finally, with the definite end goal and setting up of previous project reports, I organized project meetings and provided introductions on project to my project supervisor.