Designing Automated Systems at Grocery stores in Walmart
Verified
Added on 2022/08/18
|6
|1212
|11
AI Summary
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Running head:DESIGNING AUTOMATED SYSTEMS AT GROCERY STORES IN WALMART Designing Automated Systems at Grocery stores in Walmart Name of the Student Name of the University Author note
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
1DESIGNING AUTOMATED SYSTEMS AT GROCERY STORES IN WALMART Table of Contents 1. Background Details of Project.....................................................................................................2 2. Relevance of Project with Theoretical Definition of Project.......................................................2 3. Explanation of Organisational Structure.....................................................................................3 4. Challenges or Issues associated with Management of the Project’.............................................3 5. Description of Project Lifecycle under“Conception – Definition – Execution” framework......4 References........................................................................................................................................5
2DESIGNING AUTOMATED SYSTEMS AT GROCERY STORES IN WALMART 1. Background Details of Project Automation is the most rising technological aspect, which has affected most industries and business from all over the world. In the current context of the project, the discussion would be focused on the development of automation technologies within the grocery stores at Walmart. In the context of the project, Walmart has chosen Alphabot, which is an Alert Innovation’s Goods-to-Person (GTP) concept (Nguyen, 2017). The automated system would be respponsible for automating the operations performed within the online grocery stores with the use of autonomous mobile robots. These robots would be capable of performing operations in all kind of three dimensions within a certain multilevel storage structure. This project has been chosen because it would help the business and customers in delivering orders at a rapid pace while also lowering the costs incurred by the company. On a further note, the project would also be able to bring in feasibility within the operations performed by the business and better handle orders and customers. 2. Relevance of Project with Theoretical Definition of Project The theoretical definition of project states the performing of activities or tasks that would be scheduled under the scope management. These activities could also be defined in the form of a Work Breakdown Structure, thus dividing the tasks in sub-sections (Cagliano, Grimaldi & Rafele, 2015). A project could also be defined as the transformation of given inputs and gained outputs. In the given context of the project, it can be discussed that the implementation of automation systems would fit according to the theoretical defintion of the project. The project
3DESIGNING AUTOMATED SYSTEMS AT GROCERY STORES IN WALMART would be installed at the grocery stores on a phased wise manner. Different stages such as initiation and planning, procurement of human and material resources, installation, testing and future maintenance stages would be perfomed in the context of the project (Antunes & Gonzalez, 2015). A project manager would be responsible for managing each of the aspects of the project in a scheduled manner. 3. Explanation of Organisational Structure In the context of the parent organisation, the functional organisational structure would be followed. Different stakeholders who would be involved within the project would be grouped together based on their level of knowledge, skills and expertise. The working of functional organisational structure would comprise of specialized units that would be primarily report to a single authority, known as top management. Employees comprising of similar experiences and skills would need to be grouped together in order to make the production of the project in an efficient manner. The simplicity in the hierarchical process makes it easier for the stakeholders at the lower level to understand the person to whom they would be reporting for their works (Joslin & Müller, 2015). The functional- based organizational structure helps in supporting a perfect environment for different employees to work in a real-world environment based on theoretical information. 4. Challenges or Issues associated with Management of the Project’ The challenges or issues that would be considered to be associated with managing the development and implementation of the automated systems at the grocery stores at Walmart based on the organisational structure are:
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
4DESIGNING AUTOMATED SYSTEMS AT GROCERY STORES IN WALMART a. Lack of proper coordination within team members working in the development phase of the project might lead to inefficiencies in progressing over the project works. It might also happen that managers might not provide timely reports, which might affect the project work. b. Many employees performing a single work might lead to inefficiences in the concerned area of work. Different employees would have a different midset during performing work. c. Lack of communication between the various teams would lead to issues in meeting and sharing of various perspectives(Hazır, 2015). This could be harmful for the progress of the project work. 5. Description of Project Lifecycle under“Conception – Definition – Execution” framework The lifecycle of the concerned project based in the development of the automates systems at Walmart based on the “Conception – Definition – Execution” framework can be discussed as: Conception– In this stage, the business managers would be performing a marketing analysis and analysing the different alternatives of the product. These would be proposed and compared based on considering the cost factors, quality factors and many others. Definition– In the definition phase of the project, the scope of the project, the workfloew management and list of available resources would be defined (Killi & Morrison, 2015). The final outputs that would be gained from the definition phase are a scheduled work plan for the execution phase, requirements of resources and a commitment made for the project delivery date. Execution– The execution phase would detail the work activities that have been defined in the definition phase. Based on the defined work activities, the project would proceed accordingly.
5DESIGNING AUTOMATED SYSTEMS AT GROCERY STORES IN WALMART References Antunes, R., & Gonzalez, V. (2015). A production model for construction: A theoretical framework.Buildings,5(1), 209-228. Cagliano,A.C.,Grimaldi,S.,&Rafele,C.(2015).Choosingprojectriskmanagement techniques. A theoretical framework.Journal of risk research,18(2), 232-248. Hazır, Ö. (2015). A review of analytical models, approaches and decision support tools in project monitoring and control.International Journal of Project Management,33(4), 808-815. Joslin, R., & Müller, R. (2015). Relationships between a project management methodology and project success in different project governance contexts.International journal of project management,33(6), 1377-1392. Killi, S., & Morrison, A. (2015). Just-in-Time Teaching, Just-in-Need Learning: Designing towardsOptimizedPedagogicalOutcomes.UniversalJournalofEducational Research,3(10), 742-750. Nguyen, T. T. H. (2017). Wal-Mart’s successfully integrated supply chain and the necessity of establishing the Triple-A supply chain in the 21st century.Journal of Economics & Management,29, 102-117.