Detailed Project Progress Report

   

Added on  2023-01-23

20 Pages5226 Words57 Views
 | 
 | 
 | 
Detailed Project Progress Report <Insert Project Name>
<Name of Sponsoring Organisation>
<PROJECT TITLE>
DETAILED PROJECT PROGRESS REPORT
DETAILS
Project Title
Project ID
Document ID
Date Produced
Project Manager
Sponsor
REPORTING PERIOD
From
To
DISTRIBUTION
This document has been distributed to:
Name Title
page 1 of 20
Detailed Project Progress Report_1

Project Progress Report <Insert Project Name>
1.0 Project Manager’s Report
1.1. Summary of Performance - Overall
Schedule – The project will be delayed by 6 days due to implementation of fingerprint
scanner in the system before system design a data migration. However, the 6 days delay
cannot be mitigated by starting any other activity early or re-scheduling other activities.
Budget – The project has shifted to $24,240 from approved baseline project of $20,000.
The increase can be covered under the contingency plan approved by the project sponsor.
Quality – All work has been managed as per the standards and metrics of quality
management plan.
1.2. Summary of Performance – This Reporting Period
The planning activities have been done as per the schedule.
No delay was reported in planning activities.
No team conflict was reported during the period.
Project plan was completed 100% with the approval of project sponsor.
1.3. Corrective Actions Undertaken This Reporting Period
Security cover was identified during this period which is required to be implemented to avoid
any illegal access to the patient’s data. In order to do this, fingerprint scanner needs to be
implemented which results in delay in project’s completion.
Data migration – Hospital management decided to handover the data migration to the
development team.
2.0. Benefits Status since last report
All benefits remain unchanged as per the table given below:
Status Comments
Unchanged
Reduced
Enhance
No delay in the initiation phase where in all planning related to the proposed system had
been done.
-
A positive attitude towards the new IS has been observed among the staff of the hospital.
Increase in number of registrations as the patients are early waiting for the new IS to store
their data and they want to know how can they access data from any location.
page 2 of 20
Detailed Project Progress Report_2

Project Progress Report <Insert Project Name>
page 3 of 20
Detailed Project Progress Report_3

Project Progress Report <Insert Project Name>
3.0.Scope Status
3.1.Work packages progress to date – Completed & Approved in this Reporting Period
Work Packages completed in the reporting period (14/03/2019 to 29/04/2019)
WBS Task Name
1 Project initiation phase
1.1 Assemble the project team
1.2 Create a business case
1.3 Feasibility study
1.4 Prepare a project charter
1.5 Assign the resources to project tasks
1.6 Schedule the plan
1.7 Estimate the project cost
1.8 Kick off the project meetings
1.9 Development and approval of project
plan
2 Software designing phase
2.1 Analyze the performance of software
2.2 Making notes on additional system
requirements
2.3 Building architecture of the project plan
2.4 Identify design and workflows for
information system
3.2.Scope Changes since last report
3.2.1. Data migration of existing system into new system
Initially it was not deicide to include the migration of current data into new system. The hospital
management was reluctant in providing access to the old and manual system. They decided to
transfer it manually to the new system. But the estimated cost of manually doing it turned out to
be very high and time-consuming. So they have proposed to get it done along with the new
system development at the fixed cost of $20,000. This increase in the project budget was
approved in change request mentioned in section 1.
3.2.2. Fingerprint installation
During the development of the project and data migration, this data may get be assessed by
illegal or unauthorized staff. This risk was analysed by the project management team and it was
then decided that a fingerprint security is required to be installed whenever an access to the data
is required. Also, it has been decided that the data cannot be modified by any staff unless
approved by the hospital management. The scope of the work includes installation of additional
page 4 of 20
Detailed Project Progress Report_4

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
VUIS CONSULTING PTY LTD STATUS REPORT PROJECT: Implementing SAP
|6
|490
|81

VUIS Consulting Project Status Report
|5
|1191
|330

Roles And Responsibilities of Project
|7
|1006
|20

Development of Information System in Healthcare Industry - Project Completion Review Report
|5
|1462
|368

TASK 2.3. STATUS REPORT. Project Status Summary. Percen
|3
|448
|92