CE 3.1 Project InformationName of the project: Development of Hydraulic Rod Bending MachineLocation of the project: [Please fill]Project Duration: [Please fill]Organization: [Please fill] Role and Designation during the time: Project Team LeaderCE 3.2 Project BackgroundCE 3.2.1 Characteristics of the projectThe Development of Hydraulic Rod Bending Machine project has applied the principle ofhydraulic system for bending rods at specified dimensions. Power of hydraulic load iscomparatively more than the electric as well as the pneumatic loads. The process of manualstirrups has several disadvantages and this project was undertaken to overcome these drawbacks.This project proposed a system of bending circular and square Stirrups. In this project, the rodwas bent by using hydraulic force. The equipments and components that were used in this projectfor developing a rod bending machine based on hydraulic system are hoses, pump, rack, pinion,cylinder, control valve, fixture and free wheel. The rod was being bent by the piston of thehydraulic cylinder. The overall benefit of this project was that there was no need forrepositioning of rod while bending the square Stirrups.
Development of Hydraulic Rod Bending_1
CE 3.2.2 Objectives developed for the projectThis project was undertaken to apply the principle of hydraulic systems in developingand fabricating a rod bending machine in order to utilize the benefits of hydraulics and fluidmechanics. The main objectives of this project were:To incorporate the principle of hydraulics in the design and construction of therod bending machineTo implement hydraulic based rod bending system in construction sites at a lowcost To increase the productivity of stirrups To improve the accuracy To prevent the labours from injuries and musculoskeletal disorder by automatingthe processCE 3.2.3 My area of workI was the team leader of this project. I had to report to the project manager. My area ofwork was to supervise and monitor the activities of the project team members. Being the teamleader, I had a significant role in all the various phases of the project. My main area of work wasto carry out a proper plan and schedule for the completion of the project. I had to interpret thespecification of the tasks. My leadership qualities had helped me to manage and lead the projectteam in a systematic manner.
Development of Hydraulic Rod Bending_2
Project ManagerProject Team Leader (Myself)Team MemberTeam MemberTeam MemberCE 3.2.4 Project GroupFigure 1: People involved in the projectCE 3.2.5 My responsibilities throughout the projectI had numerous responsibilities throughout the project. My main responsibility was togive a clear direction to the team members for the successful completion of the project. I hadpromoted the idea of creative thinking and encouraged my team members to solve complexproblems and issues. I was responsible for monitoring the performance of the team members andthe progress of the project work. I was responsible for distributing the tasks among the entireteam members. I had to identify the loopholes in the design and rectify them. I had to review thequality of the selected components and equipments, and replace the components if there wereany faults and defects. I was responsible for preparing the weekly plans and reports for carrying
Development of Hydraulic Rod Bending_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Design and Development of Hydraulic Jack Project
|7
|1653
|109

Project on Building a Hydraulic Floor Crane
|7
|1664
|875

Application of Hydraulic Hybrid System
|8
|1736
|178

Project Report on Professional Engineering
|6
|933
|23

Competency Demonstration Report, (CDR)
|9
|1642
|110

Project on Development of Flexible and Three Directional Drilling Machine
|7
|1617
|95