Introduction Development life cycle is a process in which various sub-processes running behind the main process, such as planning, creation, testing, and implementation. The main role of development life cycle is analyse actual problem of the systems (Sage,and Rouse, 2014).
Problem definition It is a basic step of development life cycle in which problem is identified and project manager provide solution of that particular problem using whole development life cycle (Highsmith, 2013).
Feasibility study DLC has required feasibility study about the system, which is necessary for the whole system. There are various types of feasibility of a systems development cycle (Kumar, Zadgaonkar, and Shukla, 2013).
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
System analysis System analysis is necessary for all the processes, such as designing, coding, implementation, and others. All the requirements should clear in front of project manager and whole team (Valacich, George, and Hoffer, 2014).
Program design Designing is an important part of whole cycle, which is depend on the analysis and requirements of the system. Program design part should cover all the things in a proper way to analyse all the things.
Coding Coding part is core part of a system, as code provides all the solutions of the systems problems. Coding must be strong to make a system secure and powerful.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Debugging Debugging process is compulsory process to manage various things properly. A program can be affected from the viruses or any thing else, such as cyber- attacks (Kerzner, 2017).
Documentation Documentation is necessary at every stage of the whole life cycle. It provides proper management and communication in whole development cycle (Stark, 2015).
Maintenance Maintenance is necessary because many faults can be occur in the system due to many other reasons (Bhuvaneswari, and Prabaharan, 2013).
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Technologies are changing in every decades. Therefore, extension and redesign process should be compulsory in the development life cycle. Future changes will be possible in the present models Extension and redesign
Models of DLC Agile modelWaterfall model
System implementation Implementation process is necessary step, which depends on the other steps. Because of different architecture of the systems, it takes time more than expectation.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Project manager should monitor all the processes in a proper manner to avoid mistakes. Avoid lack of change management Requirements should be clear for the team members analysis part must be completed properly Choose proper development model as per the requirement of the task. Recommendations
In conclusion, development life cycle has various parts, which are analysis, coding, design, maintenance, and implementation. In addition, a project manager must control and monitor all the processes properly to avoid project failure chances. Conclusion
Sage, A.P. and Rouse, W.B., 2014.Handbook of systems engineering and management. John Wiley & Sons. Highsmith, J., 2013.Adaptive software development: a collaborative approach to managing complex systems. Addison-Wesley. Kumar, N., Zadgaonkar, A.S. and Shukla, A., 2013. Evolving a new software development life cycle model SDLC-2013 with client satisfaction. International Journal of Soft Computing and Engineering (IJSCE),3(1), pp.2231-2307. Valacich, J., George, J. and Hoffer, J., 2014.Essentials of systems analysis and design. Prentice Hall Press. Bhuvaneswari, T. and Prabaharan, S., 2013. A survey on software development life cycle models.International Journal of Computer Science and Mobile Computing,2(5), pp.262-267. Stark, J., 2015. Product lifecycle management. InProduct lifecycle management (Volume 1)(pp. 1-29). Springer, Cham. Kerzner, H., 2017.Project management: a systems approach to planning, scheduling, and controlling. John Wiley & Sons. References
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser