Running head: Project Management
Project Management: E-Learning Technologies and Its Application in ABC school
Name of the student:
Name of the university:
Project Management: E-Learning Technologies and Its Application in ABC school
Name of the student:
Name of the university:
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
1PROJECT MANAGEMENT
Letter to project sponsor
To
The Project sponsors
I am writing this letter to let you know that our research and development department of
school “ABC School” is willing to develop an E-Learning app for making the bonding stronger
enough between the students and teachers. After estimating the details of the project
specifications we have found that, around $19,000 will be needed for the successful
implementation of this project.
We have signed contract to Mind inventory Company for developing this E-Learning
app. I am looking forward to you with the required capita to successfully implement our project
for ABC school.
-Thanks and regards
-ABC school
-Dept. head
-(Research and development team)
Letter to project sponsor
To
The Project sponsors
I am writing this letter to let you know that our research and development department of
school “ABC School” is willing to develop an E-Learning app for making the bonding stronger
enough between the students and teachers. After estimating the details of the project
specifications we have found that, around $19,000 will be needed for the successful
implementation of this project.
We have signed contract to Mind inventory Company for developing this E-Learning
app. I am looking forward to you with the required capita to successfully implement our project
for ABC school.
-Thanks and regards
-ABC school
-Dept. head
-(Research and development team)
2PROJECT MANAGEMENT
Table of Contents
Introduction......................................................................................................................................3
Project structure based on activities and roles.................................................................................3
Resource and time management in project......................................................................................5
Project initiation...............................................................................................................................6
Planning and scheduling..................................................................................................................6
Execution.........................................................................................................................................6
Monitoring and control....................................................................................................................7
Closure and documentation.............................................................................................................7
Communication tools.......................................................................................................................7
Planning and scheduling tools.........................................................................................................8
Monitoring tools..............................................................................................................................8
Documentation tools........................................................................................................................9
References......................................................................................................................................10
Table of Contents
Introduction......................................................................................................................................3
Project structure based on activities and roles.................................................................................3
Resource and time management in project......................................................................................5
Project initiation...............................................................................................................................6
Planning and scheduling..................................................................................................................6
Execution.........................................................................................................................................6
Monitoring and control....................................................................................................................7
Closure and documentation.............................................................................................................7
Communication tools.......................................................................................................................7
Planning and scheduling tools.........................................................................................................8
Monitoring tools..............................................................................................................................8
Documentation tools........................................................................................................................9
References......................................................................................................................................10
3PROJECT MANAGEMENT
Introduction
In this new era of technology, E-learning application is defined as a future and a billion
dollar idea for the business. There are many private businesses which are using the concept of
electronic learning for converting the teaching-learning mechanism more effective and efficient
from the traditional approach. For this specific case the nominated project is “E-Learning
Technologies and Its Application in ABC school”. The school committee is willing to sign a
contract with mind Inventory Company for developing their learning app. The rationale and goal
of the project is to promote the education system, ABC school has planned to contract with Mind
Inventory E-learning app development Company for developing an app for their school.
Project scope
The scope of the project is to invest proper capital to Mind Inventory Company for
developing an electronic learning app for ABC school. With the successful development of the
E-learning app the school authority will be able to increase their education efficiency. In addition
to this the relationship between the teachers and the learners will also become stronger. The
learning app will be accessible by only the teachers, students and members of school committee.
The students from 5th standard to 12th standard can ask for their queries regardless of time and
location.
Project structure based on activities and roles
WBS Task Name Duration Start Finish Predecessors Resource
Names
0
E-Learning App
development for
ABC school
106 days Fri 7/27/18 Fri 12/21/18
Introduction
In this new era of technology, E-learning application is defined as a future and a billion
dollar idea for the business. There are many private businesses which are using the concept of
electronic learning for converting the teaching-learning mechanism more effective and efficient
from the traditional approach. For this specific case the nominated project is “E-Learning
Technologies and Its Application in ABC school”. The school committee is willing to sign a
contract with mind Inventory Company for developing their learning app. The rationale and goal
of the project is to promote the education system, ABC school has planned to contract with Mind
Inventory E-learning app development Company for developing an app for their school.
Project scope
The scope of the project is to invest proper capital to Mind Inventory Company for
developing an electronic learning app for ABC school. With the successful development of the
E-learning app the school authority will be able to increase their education efficiency. In addition
to this the relationship between the teachers and the learners will also become stronger. The
learning app will be accessible by only the teachers, students and members of school committee.
The students from 5th standard to 12th standard can ask for their queries regardless of time and
location.
Project structure based on activities and roles
WBS Task Name Duration Start Finish Predecessors Resource
Names
0
E-Learning App
development for
ABC school
106 days Fri 7/27/18 Fri 12/21/18
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
4PROJECT MANAGEMENT
1 Project initiation 26 days Fri 7/27/18 Fri 8/31/18
1.1 Development of E-
Learning module 5 days Fri 7/27/18 Thu 8/2/18 Project manager
1.2 Analyzing project
requirements 6 days Fri 8/3/18 Fri 8/10/18 2 finance manager
1.3 Learners analysis
project 6 days Mon 8/13/18 Mon 8/20/18 3 Application
programmer
1.4 Project
specification 4 days Tue 8/21/18 Fri 8/24/18 4 sponsors
1.5 Development of
course competencies 5 days Mon 8/27/18 Fri 8/31/18 5 operation
manager
2 Project planning 18 days Mon 9/3/18 Wed
9/26/18
2.1 Development of
Module content 6 days Mon 9/3/18 Mon 9/10/18 6 Application
programmer
2.2 Design learning
materials 5 days Mon 9/3/18 Fri 9/7/18 6 system designer
2.3 Designing project
prototype 6 days Tue 9/11/18 Tue 9/18/18 8 operation
manager
2.4 Design navigation
path 5 days Mon 9/10/18 Fri 9/14/18 9 finance manager
2.5 User interface
design 6 days Wed 9/19/18 Wed 9/26/18 10,11 system designer
3 Project execution
phase 23 days Thu 9/27/18 Mon
10/29/18
3.1 unit testing 8 days Thu 9/27/18 Mon 10/8/18 12 Project manager
3.2 integrated testing 9 days Tue 10/9/18 Fri 10/19/18 14 Application
programmer
3.3 Acceptance testing 6 days Mon
10/22/18
Mon
10/29/18 15 tester
4 Project monitoring
and control 29 days Tue
10/30/18 Fri 12/7/18
4.1 Change
management program 5 days Tue
10/30/18 Mon 11/5/18 16 tester
4.2 DB connectivity 6 days Tue 11/6/18 Tue
11/13/18 18 tester
4.3 system deployment 8 days Wed
11/14/18 Fri 11/23/18 19,18 tester
4.4 Mobile app
development 10 days Mon
11/26/18 Fri 12/7/18 20 System designer
5 Project closure 10 days Mon
12/10/18 Fri 12/21/18
5.1 Stakeholder 6 days Mon Mon 21 Project manager
1 Project initiation 26 days Fri 7/27/18 Fri 8/31/18
1.1 Development of E-
Learning module 5 days Fri 7/27/18 Thu 8/2/18 Project manager
1.2 Analyzing project
requirements 6 days Fri 8/3/18 Fri 8/10/18 2 finance manager
1.3 Learners analysis
project 6 days Mon 8/13/18 Mon 8/20/18 3 Application
programmer
1.4 Project
specification 4 days Tue 8/21/18 Fri 8/24/18 4 sponsors
1.5 Development of
course competencies 5 days Mon 8/27/18 Fri 8/31/18 5 operation
manager
2 Project planning 18 days Mon 9/3/18 Wed
9/26/18
2.1 Development of
Module content 6 days Mon 9/3/18 Mon 9/10/18 6 Application
programmer
2.2 Design learning
materials 5 days Mon 9/3/18 Fri 9/7/18 6 system designer
2.3 Designing project
prototype 6 days Tue 9/11/18 Tue 9/18/18 8 operation
manager
2.4 Design navigation
path 5 days Mon 9/10/18 Fri 9/14/18 9 finance manager
2.5 User interface
design 6 days Wed 9/19/18 Wed 9/26/18 10,11 system designer
3 Project execution
phase 23 days Thu 9/27/18 Mon
10/29/18
3.1 unit testing 8 days Thu 9/27/18 Mon 10/8/18 12 Project manager
3.2 integrated testing 9 days Tue 10/9/18 Fri 10/19/18 14 Application
programmer
3.3 Acceptance testing 6 days Mon
10/22/18
Mon
10/29/18 15 tester
4 Project monitoring
and control 29 days Tue
10/30/18 Fri 12/7/18
4.1 Change
management program 5 days Tue
10/30/18 Mon 11/5/18 16 tester
4.2 DB connectivity 6 days Tue 11/6/18 Tue
11/13/18 18 tester
4.3 system deployment 8 days Wed
11/14/18 Fri 11/23/18 19,18 tester
4.4 Mobile app
development 10 days Mon
11/26/18 Fri 12/7/18 20 System designer
5 Project closure 10 days Mon
12/10/18 Fri 12/21/18
5.1 Stakeholder 6 days Mon Mon 21 Project manager
5PROJECT MANAGEMENT
signoff 12/10/18 12/17/18
5.2 Post project
maintenance plan 2 days Tue
12/18/18
Wed
12/19/18 23 sponsors
5.3 Final project
document submission 2 days Thu
12/20/18 Fri 12/21/18 24 operation
manager
Figure 1: Project Schedule
Source: Created by Author)
Resource and time management in project
Resource Name Std. Rate
signoff 12/10/18 12/17/18
5.2 Post project
maintenance plan 2 days Tue
12/18/18
Wed
12/19/18 23 sponsors
5.3 Final project
document submission 2 days Thu
12/20/18 Fri 12/21/18 24 operation
manager
Figure 1: Project Schedule
Source: Created by Author)
Resource and time management in project
Resource Name Std. Rate
6PROJECT MANAGEMENT
Project manager $27.00/hr
Finance manager $21.00/hr
Sponsors $35.00/hr
Application programmer $22.00/hr
Tester $18.00/hr
System analyst $20.00/hr
System designer $20.00/hr
Operation manager $22.00/hr
Project initiation
This is the initiating phase of E-learning app development project. In this phase the E-
Learning module will be developed by analyzing the details project specification and analysis.
The curse competencies defined for the student of the ABC school are also schedules in this
phase by the project manager.
Planning and scheduling
After defining the project details it is defined that the project will take around 70 days
and a total cost of $19,000 for its successful accomplishment.
Execution
At the project execution phase, the completely designed Online E-Learning app prototype
will be executed. After unit testing, integrated testing and acceptance testing the final project for
ABC school will be implemented.
Project manager $27.00/hr
Finance manager $21.00/hr
Sponsors $35.00/hr
Application programmer $22.00/hr
Tester $18.00/hr
System analyst $20.00/hr
System designer $20.00/hr
Operation manager $22.00/hr
Project initiation
This is the initiating phase of E-learning app development project. In this phase the E-
Learning module will be developed by analyzing the details project specification and analysis.
The curse competencies defined for the student of the ABC school are also schedules in this
phase by the project manager.
Planning and scheduling
After defining the project details it is defined that the project will take around 70 days
and a total cost of $19,000 for its successful accomplishment.
Execution
At the project execution phase, the completely designed Online E-Learning app prototype
will be executed. After unit testing, integrated testing and acceptance testing the final project for
ABC school will be implemented.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
7PROJECT MANAGEMENT
Monitoring and control
After gathering feedback from the internal users a change management plan will be
designed. The interface of the E-Learning app and the other specifications are also analyzed in
this monitoring phase from the project progress report.
Closure and documentation
At the closure and documentation phase with the project approval requirements a final
project document will be developed after getting approval from the sponsors and project
managers. In this phase the project stakeholders will also signed off.
Communication tools
Different communication tools are there such as:
Discussion forum
Social intranet software
Private, group messaging and chatting tools
Case, issue tracking software
Internal blogs and videos
For this specific E-learning app development project, ABC school will signing a contract
with Mind Inventory the communication tool that they will be using is private, group messaging
and chatting tools. While developing the project for ABC school Mind Inventory will use open
communication approach.
Monitoring and control
After gathering feedback from the internal users a change management plan will be
designed. The interface of the E-Learning app and the other specifications are also analyzed in
this monitoring phase from the project progress report.
Closure and documentation
At the closure and documentation phase with the project approval requirements a final
project document will be developed after getting approval from the sponsors and project
managers. In this phase the project stakeholders will also signed off.
Communication tools
Different communication tools are there such as:
Discussion forum
Social intranet software
Private, group messaging and chatting tools
Case, issue tracking software
Internal blogs and videos
For this specific E-learning app development project, ABC school will signing a contract
with Mind Inventory the communication tool that they will be using is private, group messaging
and chatting tools. While developing the project for ABC school Mind Inventory will use open
communication approach.
8PROJECT MANAGEMENT
However, after the final implementation of the E-learning app the tool that is going to be
incorporated is discussion forum. With the help of this communication tool the students from 5th
to 12th standard can ask for their queries anytime to their student. The Learning app will act as a
virtual classroom and through the discussion forum communication tool online discussion will
done among the students and teachers.
Planning and scheduling tools
For planning and scheduling the E-Learning app development project by Mind Inventory,
the tools that will be applied are Gantt chart, PERT chart and Work Breakdown Structure
(WBS). With the help of the WBS tool the entire project can be divided in small parts. The work
burden will be reduced and based on the skills and knowledge of the project team members for
each activity the resources will be allotted. It is the responsibility of the project team members to
complete the tasks within the estimated time and budget.
Monitoring tools
In order to check the progress of the projects the monitoring tools that will be used are
perception or satisfaction survey, sequential visual analysis, scenario testing etc. With the help of
monitoring tools the project progress details can be easily tracked by the project head. Wide
range of procedures and tools can be applied for monitoring any project. However, in most of the
cases the tools are prescribed by professional regulations. For this specific project the focus in
placed on the qualitative measurement. Though there are many other ways used by the project
team members for monitoring any project.
However, after the final implementation of the E-learning app the tool that is going to be
incorporated is discussion forum. With the help of this communication tool the students from 5th
to 12th standard can ask for their queries anytime to their student. The Learning app will act as a
virtual classroom and through the discussion forum communication tool online discussion will
done among the students and teachers.
Planning and scheduling tools
For planning and scheduling the E-Learning app development project by Mind Inventory,
the tools that will be applied are Gantt chart, PERT chart and Work Breakdown Structure
(WBS). With the help of the WBS tool the entire project can be divided in small parts. The work
burden will be reduced and based on the skills and knowledge of the project team members for
each activity the resources will be allotted. It is the responsibility of the project team members to
complete the tasks within the estimated time and budget.
Monitoring tools
In order to check the progress of the projects the monitoring tools that will be used are
perception or satisfaction survey, sequential visual analysis, scenario testing etc. With the help of
monitoring tools the project progress details can be easily tracked by the project head. Wide
range of procedures and tools can be applied for monitoring any project. However, in most of the
cases the tools are prescribed by professional regulations. For this specific project the focus in
placed on the qualitative measurement. Though there are many other ways used by the project
team members for monitoring any project.
9PROJECT MANAGEMENT
Documentation tools
After detailing the E-Learning app development project for ABC school by Mind
inventory, a project document will be prepared by the project manager and from the project
sponsors approval will be taken before the final project execution. Once the project prototype
will be prepared it will be approved by the project sponsors and project manager. The different
documentation tools used for the project are as follows:
Project statement of work
Project charter
Project status report
Lesson learned review
Documentation tools
After detailing the E-Learning app development project for ABC school by Mind
inventory, a project document will be prepared by the project manager and from the project
sponsors approval will be taken before the final project execution. Once the project prototype
will be prepared it will be approved by the project sponsors and project manager. The different
documentation tools used for the project are as follows:
Project statement of work
Project charter
Project status report
Lesson learned review
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
10PROJECT MANAGEMENT
References
Fleming, Q. W., & Koppelman, J. M. (2016, December). Earned value project management.
Project Management Institute.
Larson, E. W., & Gray, C. F. (2014). Project Management: The Managerial Process with MS
Project.
Laudon, K. C., & Laudon, J. P. (2016). Management information system. Pearson Education
India.
Mir, F. A., & Pinnington, A. H. (2014). Exploring the value of project management: linking
project management performance and project success. International journal of project
management, 32(2), 202-217.
Nicholas, J. M., & Steyn, H. (2017). Project management for engineering, business and
technology. Taylor & Francis.
Peppard, J., & Ward, J. (2016). The strategic management of information systems: Building a
digital strategy. John Wiley & Sons.
Pinto, J. K., Dawood, S., & Pinto, M. B. (2014). Project management and burnout: Implications
of the Demand–Control–Support model on project-based work. International Journal of
Project Management, 32(4), 578-589.
Ramazani, J., & Jergeas, G. (2015). Project managers and the journey from good to great: The
benefits of investment in project management training and education. International
Journal of Project Management, 33(1), 41-52.
References
Fleming, Q. W., & Koppelman, J. M. (2016, December). Earned value project management.
Project Management Institute.
Larson, E. W., & Gray, C. F. (2014). Project Management: The Managerial Process with MS
Project.
Laudon, K. C., & Laudon, J. P. (2016). Management information system. Pearson Education
India.
Mir, F. A., & Pinnington, A. H. (2014). Exploring the value of project management: linking
project management performance and project success. International journal of project
management, 32(2), 202-217.
Nicholas, J. M., & Steyn, H. (2017). Project management for engineering, business and
technology. Taylor & Francis.
Peppard, J., & Ward, J. (2016). The strategic management of information systems: Building a
digital strategy. John Wiley & Sons.
Pinto, J. K., Dawood, S., & Pinto, M. B. (2014). Project management and burnout: Implications
of the Demand–Control–Support model on project-based work. International Journal of
Project Management, 32(4), 578-589.
Ramazani, J., & Jergeas, G. (2015). Project managers and the journey from good to great: The
benefits of investment in project management training and education. International
Journal of Project Management, 33(1), 41-52.
1 out of 11
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.