ENGINEERING MECHANICS: PROJECT REPORT ON BRIDGE
DESIGN
Bridges play an important role in connectivity; it helps the people to commute between two
places in a fast and efficient way. Earlier when there were no bridges and tunnels people
needed several days to cover the distance which takes only hours now that too with ease and
access, also used to transport the goods. [1] There are several types of bridges such as stone
bridge, wooden bridge, arch bridge, suspension bridge, cantilever bridge, cable stayed bridge,
movable bridge, etc. The bridges are also categorised according to the material like stone,
wood, iron, steel, and other materials. Recently a technology was developed to use waste
plastic in the formation of road and bridges. [2]
Factors to consider before building a bridge
Building bridges are one of the most expensive projects in the field of construction. There are
set of parameters to be taken into action while designing or building a bridge. Some of them
are: geology of the area of project and its surrounding, type of traffic to be handled by the
bridge, to check for earthquake and flood probability, types of loads to be carried, etc. There
are different times of forces that act on the bridge like the compression and tension forces,
resonance, unbalanced loads and dynamic movements exerting force on the bridge. The high
wind pressures, vibrational disturbances due to construction nearby and the fact should also
be considered for the effect of accident or impact of vehicles to the bridge. It is very essential
to understand and encounter the topography of the environment as well as the situations that
generally occurs and that might occur. [3] Bridges were specially created to overcome natural
hurdles like rivers, valleys, huge natural trenches, distance between two cliffs, etc. They were
started building from 3rd century, the first major bridge made with iron was built in England
on river Severn, shows the evaluation of designing of bridges.
The Technical Procedure
At first, before starting the technical work the adequate knowledge of the project is very
necessary to be undertaken. All the constraints must be kept in mind before designing of
bridge like material, man power, electricity, equipment, proper design, money, evaluation
report of the site and requisite time expectation for the completion of project. Initial design
should be made after knowing all the required attributes to solve the requirement, all the
unique and new ideas should be entertained and rough sketches should be prepared. After the
Bridge Design: Project Report on Engineering Mechanics_1

all the sketches are considered and shortlisted one or two designs should be selected and
analysed. In the process of evaluation of design, these designs with appropriate measurements
are drawn in a software, simulated and analysed, the results are studied and then the design is
set to move in the action plan if not again new designs are to be prepared. Before the plan can
be executed it is important to make understand the action plan to all the engineers and
construction teams and responsibility should be given to different teams for different parts for
easy and effective construction of the bridge. Any changes if required for smooth
construction should be considered. Finally, the procedure should begin for the manufacturing
of parts and all the parts to be assembled in proper alignment. [4]
Technical justification of proposed design
According to the design proposed by the professor as shown in figure 1, our team will build a
suitable model of the bridge.
Figure 1: Proposed design model of bridge
As per the parameters set by the professor, the team needs to develop several suitable design
and experiment on them in order to succeed and stand on the expectation of the professor.
The task of this team is to build a bridge of 1500mm long pathway considering the aspects of
safety. The bridge must at least uphold the load of 15kg, for that the need to design the bridge
for minimum 20kg load bearing capacity, so it could not fall at the time of inspection. As the
guidelines provided the weights or loads will be placed at three points below the plank or
pathway i.e. first at the distance of 250mm, second at 500mm and 750mm from the left end,
let us consider the three points as 1, 2 and 3. The team members have decided to contribute
Bridge Design: Project Report on Engineering Mechanics_2

equal effort and work has been divided. All the team members finalised the design to be
taken into consideration.
Final Bridge design for submission
The final design as tested to be prepared by the team after a series of experimentation will be
concluded as shown in figure 2.
This will be how the bridge will look like after completion. Materials to be used are wooden
plank, wooden bars, steel wire, nut-bolts, wood glue, angles and hooks. First of all the,
required materials should be brought together. After that the team needs to measure and cut
wood blocks into required dimensions as shown in figure 3 and 4.
Bridge Design: Project Report on Engineering Mechanics_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Civil Engineering Technology
|15
|3301
|273

Proposed Project of Building 2022
|3
|1598
|17

Case Study on Risk Management in Engineering
|8
|1856
|59

Engineering Materials 2 - Wilson Hall, University of Melbourne
|10
|1139
|370

Pont Du Gard Bridge Analysis
|6
|646
|308

Assessing the Role of International Entities in Mega Infrastructure Projects
|10
|3176
|163