This article discusses the process of Environmental Impact Assessment (EIA) and its best practices. It includes a case study on Yanchep Rail Extension in Western Australia and highlights the importance of public participation in EIA. The article also reviews the literature on public participation in EIA and its benefits.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Running head: ENVIRONMENTAL IMPACT ASSESSMENT Environmental Impact Assessment Name of the Student: Name of the University: Author Note:
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Abstract Environmental impact assessment (EIA) can be described as a management tool which helps in ensuring the optimal and sustainable use of the natural resources. The process involves a mix of several procedures that emphasize the environmental effects arising from a proposed project. The environmental impact assessment goes through several stages like screening, scoping, baseline study, prediction of impact, assessment of the impact, mitigation, and the monitoring measures. This study explicitly focuses on the best practices of EIA and also its comparisons with the theories and practices. An Environmental Impact Assessment was conducted for the purpose of the Yanchep Rail Extension. This extension was done from the Butler Station to the Eglinton Station. This EIA report was prepared by the Public Transport Authority. The public transport authority proposed the implementation of the Metronet vision so as to transform the Perth’s transport network. The initial stage of the Metronet project included the extension of the existing railway line from the Butler to Yanchep. The best practice identified here is public consultation and the Public transport authority kept that in mind while going with the railway extension project. Consultations with the representatives of the council and groups were organized for human consultation.
Table of Contents 1. Introduction..................................................................................................................................4 2. Methodology................................................................................................................................4 3. Literature Review........................................................................................................................5 4. EIA in Western Australia and its conformance with the public participation.............................9 5. Conclusion.................................................................................................................................12 6. References..................................................................................................................................13
1. Introduction Environmental Impact Assessment (EIA) can be described as the process that evaluates the environmental impact due to a proposed project or a developmental project. EIA takes into account the human-health impacts, interrelated socio-economic which is both adverse and beneficial. Prior to the decision making, EIA is a tool which is used to identify the economic, social and the environmental impact. In the early stage of the project planning, EIA plans to predict the environmental impact at the initial stage of the project planning (Deng et al., 2014). The main aim of the EIA is to find the ways to reduce the adverse impacts that may arise from a project. Although it is important to note that the legislation around the world may vary but the general procedure of EIA includes: screening, scoping, assessment and evaluation of the impact related to the development activities, reporting of the environmental impact statement, decision making, environmental auditing/enforcement/compliance/monitoring (Cbd.int, 2018). In the year 1971, Western Australia Environmental Protection Authority (EPA) was established (EPA Western Australia, 2018). The study emphases on developing an understanding of best practice EIA with respect to theory and practice. Aim- the main aim of the study is to draw a range of the EIA literature and establish best practice criterion to apply to the Western Australia EIA case study, and highlighting the extent to which there is a conformance. 2. Methodology The methodology section is one of the section that provides the information regarding a study and its validity. Thus, the methodology section demands a precise and a clear description of an experiment needs to be done and along with it the rationale of conducting the procedures of
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
the experiment are also chosen. The method section includes the what was done to answer the research question or the aim. Thus, the methodology section also includes the materials that are required for the study and also explains how the materials are used in the study (Mackey & Gass, 2015). The various steps that are undertaken are as follows: ï‚·Review of the international Environmental Impact Assessment literature that focuses on the topic of the public participation. ï‚·From the literature review, the criterion of the public participation is taken into account. ï‚·The criterion of public participation is taken into account with respect to a Western Australia case study and it also highlights the extent to there is a conformance (Mackey & Gass, 2015). 3. Literature Review The participation of the public in the environmental impact assessment can be described as the as involving the local groups and the individuals that will be negatively and positively affected or the people that are interested in the policy, plan, programme and in the decision making process. According to Glucker et al. (2013), there is a great deal of disagreement regarding the meaning of the public participation and the usage of the term consultation in the EIA literature. Different authors have perceived public participation as a catchphrase that involves the different types of the techniques of involvement. It has been seen that the term participation is perfect only when the participants have a major amount of control over the process of decision making and the participants are also able to influence the programme. Similarly, different authors also suggest that the participants also ranges from shared decision making, consultation and information provision. It has been argued by Salomons & Hoberg
(2014), the objectives of public participation are varied. Firstly, the public participation in the EIA involves and includes those people that are affected by the decision. The participation of public in the EIA enables the participant so that they can develop the citizenship skills (cooperation, communication, interest articulation) and thus the participants in the EIA avail the opportunity of exercising the citizenship. The participation of public in EIA should be enabling the deliberation among the participants so that it can lead to social learning. The participation of the public in EIA shall be able to alter the power distribution in a society and this will empower the formally marginalised groups and individuals. The participation of the public in the EIA enhances the quality of the decision output by facilitating the decision makers with the socially and environmentally relevant knowledge and information. The participation of the public in the EIA increases the quality of the decision by providing the decision makers with a relevant value based and experimental knowledge. The participation of the public in the EIA increases the decision output by testing the increasing the robust nature of the information that is collected from the other sources. The participation of the public in the EIA legitimises the process of decision making by facilitating the implementation of the project and legitimising the EIA authority. The participation of the public in the EIA contributes to the identification and the conflict resolution before the final decision and this facilitates the implementation of the project. It has been highlighted by Glasson & Therivel (2013), that several authors did not specifically mention the who should be participating in the in the conduct of the EIA. Several authors have mentioned the citizens, stakeholders and public as the ones who should be involved in the process of EIA. However, the terms are not clear as it is neither clear who are the public and who should be participating to accrue the benefits. It has been found that several authors have mentioned the participation of the public that will affect by the decision. The term public
involves the organization, groups and people and that may either experience harm or benefit and will also be affected by the decision. It has also been mentioned that the authors that have the potential to contribute are also permitted to participate. It has also been argued that it is inefficient at the same time can lead to the potential loss of the resources when the full scope of the environmental actors that are involved in the environmental controversies. A major practice is that everyone that are interested in a given EIA project are invited to participate. It is important to mention that the initiation of a project has a far-reaching effect on the world's ecosystem and all these occurring are interlinked. This means that a project is potential enough to impact the local environment and also have the far-reaching effects. Thus, if it is democratically considered, then it is an inclusive approach to include the public during the conduct of the EIA. However, the public participation may be a failure if the everybody is allowed to participate in the process of EIA.It has been argued by Morgan (2012), that public can be considered as a homogeneous entity and in a broad sense, the public participation does not exist. Different people will have different interests and the different interests will lead to different expectations. Thus, it is important to mention that more amount of the public participation will allow the flow of various kind of expectations and this will cause frustration, eventually decreasing the willingness of the people to participate in the EIA. When the scenario of a developing country is concerned, the EIA conducted by the EIA agencies have the insufficient number of the human financial resources. In several countries like the Nicaragua, Costa Rica the EIA agencies do not take public participation into account and also refrain the people from participating in the same. However, the general public takes part in the informal form of participation like the boycotts, protest marches.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
It has been mentioned by Cuppen, Broekhans & Enserink (2012), that the public participation is entirely based on the idea that people who will be affected by a project will be involved in the decision-making process and it is their moral right to get involved in the decision-making process. The main aim of the EIA is to improve the quality of the project and the plans, improves the plan of implementation by the prevention of litigation delays in the project and even aims to meet the legal demands. It has been said that the public participation in theEIAiscapableofimprovingtheactivecitizenship,creatingacceptanceamongthe individuals regarding the project outcome, protection of the individual rights, complementing the democracy. It has been highlighted that the public participation has led to the gaining acceptance of the project. In certain cases, it has been seen that the public participation has led to the acceptance of the project, but the in certain cases the participation has led to the negatively influence the acceptance of the project. Such instances are noted in places where the people are not allowed to participate in the project initially. Majority of the public participation has led to the failure of the project when the participation of public is usually considered as a procedural requirement. The participation of public is normally reduced to just an exercise and the concerns of the general public are not taken into the environmental decision making. It has been mentioned by Chi, Xu & Xue (2014), that participation of the public is one of the major mechanism in the EIA and also with respect to the development projects. World Bank is involved with a lot of infrastructure projects in the last 20 years and thus the public World Bank has concluded that the participation of the public is a critical part in the success and sustainability of a project. Thus, in order to implement the participation of the public, it is not always sufficient to endow the rights to the public so that they can participate in the EIA. A deep transformation is required with regards to the cultural norms when the public participation is to be recognised by
both the general public and government. This is especially important for the developing the nations that were the society is not developed and the general public is not traditionally excluded from the project decision making and in such countries, the public participation is considered as revolutionary and novel. There were cases in China where the public opposition in the public projects has led to the increase in the environmental awareness (Li, Liu & Li, 2012). 4. EIA in Western Australia and its conformance with the public participation Public consultation and participation is considered as vital part of the EIA and the Environmental protection policies in Western Australia provide a sound opportunity for the same. An interesting trend has been seen over the period of 25 years. Since the year 1990, it has been seen that the number of referrals to the public has seen a downward trend. The downward trendhasbeennoticedduetotheseveralfactorsliketheeconomicboomconditions (conferences.iaia.org, 2018). While the decision of the Western Australia government regarding the creation of the specialised environmental department that will work for a decentralized environmental management. The main focus of the of EPA is to emphasise the on the proposals that are likely to have a major impact on the environment. According to the IAIA (1919), the EIA process includes three main elements like the 1) outlining the key environmental factors and any difficulties or limitations, easy and clear to follow documentation, 3) public accessibility. The stages of the EIA that are prevalent in Western Australia and the transparency are: 1) Referral, 2) setting level of assessment, 3) scoping, 4) environmental review document, 5) EPA assessment report and recommendations, 6) Environment minister proposal and decision of approval, 7) proposal implementation (conferences.iaia.org 2018). The process of EIA emphasises on the best practice of EIA and this provides the general public with an opportunity to be informed and be involved. This also facilitates their concerns to
be addressed by both the decision making and EIA documentation. In the year 2012, the EPA commenced the implementation of the public participation in EIA via the online comment (conferences.iaia.org, 2018). An Environmental Impact Assessment was conducted for the purpose of the Yanchep Rail Extension. This extension was done from the Butler Station to the Eglinton Station. This EIA report was prepared by the Public Transport Authority. The public transport authority proposed the implementation of the Metronet vision so as to transform the Perth’s transport network. The initial stage of the Metronet project included the extension of the existing railway line from the Butler to Yanchep. It is important to note that the Yanchep Rail Extension project is a 14.5 Km extension of the railway line. This is a Koondalup railway line includes the three stations; Yanchep, Eglinton, Alkimos. The YRE project is considered to be a vital and integral part of the Perth's long-term public transport system and this provides essential transport services to the northern coastal suburbs which is rapidly expanding. The YRE project foster a continued development and growth of the activity centres in the North-West sub-region that will stimulate thegrowthofthebettersustainabilityoutcomes,high-densitylanduse,vibrancy,new employment opportunities in the North West Sub-region. This was envisioned by the State Government of Perth and Peel. The YRE project exists within the city of Wanneroo and is approximately situated 28 km of the North of the Central Business District of Perth. The project has an overall area of 143.11 hectares and it encompasses the part 1 and part 2 of the development footprints. This includes the stations and railway extensions, suburbs of the Eglinton and Alkimos, suburbs of the Yanchep and Butler, access and the construction areas (epa.wa.gov, 2018).
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Consultation with the key stakeholders- in order to inform the preliminary planning of the YRE project and confirm about the development footprint, the public transport authority consulted the major stakeholders and this included the following: ï‚·The federal government- Department of the Environment and Energy: this was consulted for the purpose of the environmental approvals that existed under the EPBC Act. ï‚·StateGovernment-DepartmentofwaterandEnvironmentalRegulation: Environmental assessment under the environment protection act; implementation of the water sensitive urban design principles; noise and the vibration assessment as well as the mitigation options. The Environmental Protection Authority for the environmentaladvice.TheDepartmentofBiodiversityConservationand Attractions for the environmental advice. Water Corporation, Western Australian Planning Commission, Department of Planning, Lands and Heritage. ï‚·Local Government- City of Wanneroo: for the advocacy and the community relations, development application approval and rezoning. ï‚·Local Community- the South West Aboriginal Land and Sea Council (Whadjuk people are involved): this was consulted for the purpose of the compliance with the state government Noognar standard heritage agreement (NSHA); the Whadjuk working group; property developers; urban Bushland Council; Quinns Rocks Environmental Group (epa.wa.gov, 2018). A channel of communication was developed with the community but this was done only at the level of the local groups, councils. The people were not consulted directly but via the community based environmental based groups. Although these Urban Bushland council and the
Quinns Rocks Environmental Groups are the major stakeholders the people are generally not called for the discussion. A meeting was held with the representatives of the Quinns Rocks Environmental Group and they were consulted for the purpose of reviewing the environmental context of the YRE project. There were concerns of the Quinns Rocks Environmental Group regarding the fragmentation of the site Eglinton/Yanchep, Ningana Bushland as these were the part 2 of the YRE project. There were also concerns regarding the fragmentation of the Lot 200 Alkimos Drive that had the recreation and parks reservation and this was included in part 1. The Public transportation authority also undertook additional consultation with the Quinns Rocks Environmental Group regarding the detailed design of the YRE project (epa.wa.gov, 2018). Also, a consultation was held with the representatives of the Urban Bushland Council so that they can review the environmental context of the project. The major concern was related to the clearing of the native vegetation in the Bush Forever site that was a part of the part of the YRE project. 5. Conclusion Thus, from the above study, it can be concluded that the environment is an important part of an integralpartofthehumanlifeandtheinfrastructuraldevelopment.Anydevelopmental programme can be harmful if the environmental aspects are not taken into account. The environmental aspects can be the destruction of the natural vegetation, any park or forest area that can be detrimental for the locality detrimental for the people that are residing within the vicinityofadevelopmentalprojectoraprogramme.Thecasestudyalsopresenteda demonstration that consultation of the local people and the groups are a vital part when the EIA is conducted with the best practice in mind.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
6. References Cbd.int.(2018).WhatisImpactAssessment?.Retrievedfrom https://www.cbd.int/impact/whatis.shtml Chi, C. S., Xu, J., & Xue, L. (2014). Public participation in environmental impact assessment for public projects: a case of non-participation.Journal of Environmental Planning and Management,57(9), 1422-1440. conferences.iaia.org. (2018). EIA in Western Australia past, present and future. Retrieved from http://conferences.iaia.org/2016/draft-papers/EIA%20in%20Western%20Australia %20.doc Cuppen, M., Broekhans, B., & Enserink, B. (2012). Public participation in EIA and attitude formation.Impact Assessment and Project Appraisal,30(2), 63-74. Deng, X., Hu, Y., Deng, Y., & Mahadevan, S. (2014). Environmental impact assessment based on D numbers.Expert Systems with Applications,41(2), 635-643. EPAWesternAustralia.(2018).EPAWA|EPAWesternAustralia.Retrievedfrom http://www.epa.wa.gov.au/ epa.wa.gov. (2018).ENVIRONMENTAL IMPACT ASSESSMENT Yanchep Rail Extension: Part 1 – Butler Station to Eglinton Station[Ebook]. PUBLIC TRANSPORT AUTHORITY WesternAustralia.Retrievedfrom http://www.epa.wa.gov.au/sites/default/files/Referral_Documentation/Environmental %20Impact%20Assessment.pdf Glasson, J., & Therivel, R. (2013).Introduction to environmental impact assessment. Routledge.
Glucker, A. N., Driessen, P. P., Kolhoff, A., & Runhaar, H. A. (2013). Public participation in environmentalimpactassessment:why,whoandhow?.EnvironmentalImpact Assessment Review,43, 104-111. Li, W., Liu, J., & Li, D. (2012). Getting their voices heard: Three cases of public participation in environmental protection in China.Journal of Environmental Management,98, 65-72. Mackey, A., & Gass, S. M. (2015).Second language research: Methodology and design. Routledge. Morgan, R. K. (2012). Environmental impact assessment: the state of the art.Impact Assessment and Project Appraisal,30(1), 5-14. Salomons, G. H., & Hoberg, G. (2014). Setting boundaries of participation in environmental impact assessment.Environmental Impact Assessment Review,45, 69-75.