logo

Facilities Project Assignment Report

   

Added on  2022-08-19

16 Pages2723 Words13 Views
Student’s Name
Institutional Affiliation
Professor
Date
Facilities Project Assignment Report_1
Facilities Project 2
Executive summary
In all large firms, facilities layout is critical in determining operations efficiency and the costs
incurred in running the facilities. Whenever a firm experience a complex flow of material and
human resource, alternative approaches become a necessity in determining and evaluating other
arrangement alternatives. This paper analyses facilities and processes design and points out
various factors that are used by Walmart in managing and running its facilities and developing
relevant layouts taking into account space availability, inventory movement, and shelves
arrangement process. This paper provides an example of a floor scale of one of the facilities,
various methods available at the facility, different service process designs and the advantages
and disadvantages of using the models. The conclusion deduced from the paper indicates the
importance of facilities and processes design in running successful large retail firms.
Facilities Project Assignment Report_2
Facilities Project 3
Contents
Introduction......................................................................................................................................4
Scale floor plan................................................................................................................................5
Processes types................................................................................................................................6
Purchasing....................................................................................................................................6
Inventory handling.......................................................................................................................7
Customer service.........................................................................................................................7
Accounting processes..................................................................................................................8
Service process design.....................................................................................................................8
Facility operations.........................................................................................................................10
Service blueprint........................................................................................................................10
Swim lane map..........................................................................................................................11
Merits.........................................................................................................................................12
Cost optimization...................................................................................................................12
Demerits.....................................................................................................................................13
Loss of managerial control....................................................................................................13
Hidden operating cost............................................................................................................13
Recommendations......................................................................................................................13
Conclusion.....................................................................................................................................14
References......................................................................................................................................15
Facilities Project Assignment Report_3
Facilities Project 4
Facilities Project Assignment Report_4

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Reasons for Failure of Walmart in Japan
|20
|4741
|51

4Ps Marketing Mix of Walmart
|8
|1147
|126

Facilities And Processes Design Assignment
|6
|246
|14

Operation Management Case Study 2022
|11
|2502
|15

Operations Management at Walmart: Quality Characteristics, Statistical Techniques, Facility Location, Work System Design, and Project Management
|22
|1305
|458

Operations Management- Assignment
|18
|5662
|82