This assignment focuses on evaluating project proposals for corporate training using the Net Present Value (NPV) method. It presents two alternative training methods and requires students to calculate the NPV under optimistic, pessimistic, and most likely scenarios. The analysis compares the profitability of each alternative, ultimately recommending a preferred option based on the calculated NPV values.