Table of Contents Chapter 4: Results and Discussion...................................................................................................1 4.1 Introduction...........................................................................................................................1 4.2 Result.....................................................................................................................................1 4.3 Discussion.............................................................................................................................9 4.4 Summary.............................................................................................................................10 REFERENCES..............................................................................................................................12
Chapter 4: Results and Discussion 4.1 Introduction Under this section, researcher will discuss over findings and results which has been collectedwiththehelpofgatheredinformation.Completionofthischapterwillshow interconnections of both analysis and theories that has been used in this investigation. Main target of developing this section is to analyse how effective the BIM (Building information modelling) when it comes to ensure workers safety in high rise building construction in Australia. By analysis on set aim, investigator might easily carry out number of results that will help in gaining appropriate knowledge related to using BIM at a construction site through which health and safety of workers can be ensured(Benjaoran and Bhokha 2010). Ontheotherhand,discussionsectionofthisresearchwillhelpinvestigatorin demonstrating analysis related to results that has been carried out bythe researcher. Also, this subsection of chapter will help in gaining knowledge related to the areas of the BIM that were untouched and aid in drawing much more favourable outcomes related to set topic. 4.2 Result 4.2.1. Building information modelling helps in arranging a systematic sequence for workers while performing tasks at high rise buildings in order to reduce the risk of falling and empowering safety on construction site. Buildinginformationmodellingreferstoprocessofincludingmanagementand generation of digital representation's of the functional and physical places characteristics. It is intelligent 3D model-based process that provides an engineering, construction and architecture professionals tools and insight to make the better plan, construct, design, infrastructure and manage buildings. Construction industry is at digital tipping points as Building Information Modelling is transforming way of infrastructure, designed, operated and delivered. In addition to this, creation of 3D models and embedded with the information or data shared through whole construction teams (Bobick, McKenzie Jr & Kau, 2010). BIM is helpful in improving the technical, functional and economic characteristics of several buildings.Building Information Modelling is versatile computer tool that is used through engineers, architects and contractors. The main focus of BIM is on potential effectiveness as well as financial advantages which may entail for the construction sector. In context to this, BIM significantly contribute towards 1
prevention of accidents on site. Construction is more hazardous sector to work and advent of the new technologies which managed to make life safe. The Building Information Modelling can provide solution to agonizing safety issue in construction. BIM is empowering the safety on site from different ways which are given below: Hazard declaration- If BIM technology is executed on early stage of project then construction industry gain the significant benefits in context of safety. In order to explain simply, it is a beneficial idea to invest on concept of “safety by design”. With the help of this, several safety related bottlenecks will be neglected from starting. It will help in protecting the workers from dangerous fall on site (Cheung & Chan, 2012). Consciousness while performing tasks-Under this, Building Information Modelling can give the effective awareness of potential hazards around project of construction. In addition to this, more data combine with unhindered flow of information among various involved parties which permits for better monitoring of progress of project. It will be helpful in determining different dangers on site. Better project planning as well as coordination is lesser safety related threats which will appear. 4.2.2.Benefitsofbuildinginformationmodellingforconstructionworkersthathelps constructions company in performing tasks with ease and reducing number of chances of facing problems. Building Information Modelling mainly focus on the efficiency of a construction industry along with providing financial benefits. Moreover, BIM has played a crucial role in preventing employees from severe accidents on sites. Thus, safety is a big concern for most of the constructing companies and has to be considered because of increasing number of deaths on sites. Therefore, it has been recorded that around 60,000 people are killed on construction sites nearby 1 death in every 10 minutes. According to Koutsogiannis (2017), after implementing BIM company can gain benefits like providing better communication amongst various project sides this will help them in proper flow of information even the big data as well. Smarter Risk Predictions:After implementation of BIM technology in the early stage ofproject,significantbenefitscanbeattainedbycompanyinrelationwithsafetyand precautions. Under this, “safety by design” concept are taken into consideration and through this many bottlenecks safety are avoided which can create problem in further process. For example: 2
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
while constructing, a building's face remains inside rather than opposite. As a result, it will protect workers from a dangerous fall. Deeper safety awareness during the projects:Building Information Modelling, gives a better awareness of possible hazards which can occur on construction sites. In this, information are provided in a flow by involving various parties who are important for project's progress. Therefore, it will help company in knowing different kinds of hazards that can arise on these construction sites. Thus, it is important that a proper coordination is maintained departments so that appropriate project plan can be made (Hardin & McCool, 2015). Hazard Stimulation:By determining every process of construction company can add great value as it will help them in making construction sites even better. “Virtual Safety Tours” is one of the powerful feature that is used by most of the construction company as this enable them in virtual navigation around the sites so that hazardous situations can be identified and appropriate steps can be taken. In addition to this, it is used for making most efficient safety strategies for providing safety to workers. 4.2.3. Safety policy related to health and safety to workers belonging to fall hazards at high rise building construction considering BIM animations that may aid workers to perform effectively in near future. In Australia, construction industry comprises more share of national markets of the developed countries. Improving the construction sector may ease process of construction and enhance profit level. In this, high rise buildings are current trends in the construction because of its benefits, luxury, convenience, architectural design and grade. The safety policy related to health and safety of workers mention below: Work Health and Safety Act (2011)-It states that at worker should cooperate with reasonable procedure or policy of person that conduct business concerned to safety or health at workplace that notified to the workers (Ku & Mahabaleshwarkar, 2011). It is necessary that employer should take care the health and safety of workers so that they can work in better way. Occupational safety and health (OSH)-It is a multidisciplinary area related with health, welfare and safety of people welfare at workplace. The main goal ofOccupational safety and health (OSH) consists foster healthy and safe working environment. 3
Most frequent accidents or issues concerned to safety in the high-rise construction consist falling Debris, skips, ladders, hoist operation, falling from heights and many others. In order to overcoming from all these issue, some objectives are given below: To study about the safety risk in the construction of high- rise building in Australia. To measure weaknesses, strengths and recommendations for the purpose of safety improvement in high- rise building (Leonid & Feodor, 2016). Establish Safety Management Systems at high- rise construction project. All these objectives are mention in detailed manner: Summary of Safety Management System (SMS)- For any construction related project or high- rise construction, SMS is necessary because it is including of several latent risks and hazard. Without this, investors, managers, developers and shareholders can not reach at expected target. On the other hand, suppliers, workers, contractors can not also finish their goals in proper time period. In context to this, high rise construction should have powerful and strong project management team that will control, handle and monitor safety related matters. It is a duty of project management team to execute safety plans that consists scaffolding, site status, fire prevention, pollution control etc. Summary of Hazard/Risk Identification- It is most necessary part of high- rise project. It is based on particular situation and for this there are some necessary actions project engagement can take: Fore- seeing and far- seeing for possible causes can lead to the hazard. They should focus in high- rise construction for an instance fire, hoist, scaffolding, elevator etc. Evaluate audit or site- safety check for improvements (Namian, Zuluaga & Albert 2016). Strength, Weakness of the actual SMS- Strengths The project management should control and monitor their subordinates to implement safety rules.Safety items and rules are based on advanced norms of site- safety and also executed through long- history consultant of project management. Weaknesses 4
Not provide safety related training. Take more time, prepare paper for inspection and meeting.Involve the actions only in the construction phrase. 4.2.4. Different loads that impacts upon constructing building which delays the overall process of project and the tools that help civil engineers in reducing loads at construction sites The load in the view of construction field refers to the different type of forces and pressure appear in the construction which some time can result in the deformation and displacement in the structure of the building which makes the construction weak so there should be proper distribution of the load so that load distribution can be done effectively and there are less chances or stressin the overall structure and risk could be minimised (National Building Information Model Standard Project Committee, 2014). If the load distribution is uniform then the constructed building would be rigid and would be capable of handling the immense pressure. There are different load management techniques in the civil engineering whichuses the formulas and different theories of scientist. Load management require high level of technical skill to solve the problem of load distribution a minor error during the calculation can make the load distribution ineffective so it should be calculated approximately. There are various kinds of load which appear as the hindrance while constructing the building like snow load, dead load, hydrostatic load (load due to water), earthquake(seismic) load, special load etc. In which while the construction of high building the major role of wind load comes in play as the height of building increases the different pressure of wind at various joints increases. There are three types of wind load are as follows trade, seasonal and local winds. Trade winds are which flows from the lower level of the atmosphere of the earth this of pressure is often recognizable which and have less impact in delay of construction while seasonal and local wind are the one whose pressure is high then the trade winds. The best way reduce the load at the construction site is to distribute the load by making pillars which helps in uniformly distribution of load another way by joining the “gurder”(thick pipe of huge width to distribute the load in lengthy areas). It helps in distributing load of lengthy area to make division of blocks as per choice of the house honour . The another way is through putting counter weight but this can only help at the time during construction. After completing the construction the counter weight is removed but it helps in saving the cost of permanent load like pillars. These are reusable. 5
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
4.2.5. Importance of Building Information Modelling and its impact over workers considering number of issues that faced while performing tasks at high rise construction sites. Building Information Modelling is important in construction industry as it helps in completing whole project in less period of time by following all safety measures. This models assures that cost for the project will be used in right place and will be utilised effectively by site inspector. Some of the main importance of BIM are described as below: Improves productivity and decreases cost:Usage of BIM is essential factor for the organisation as it helps in increasing productivity of workers. As it all work isperformed in a systematic manner that is helpful in using minimising cost. This model is successful in guiding workers about whole work by using effective communication at construction site. As it directly minimises the time and cost consumed while constructing project. Decreases reworks:BIM operates whole project at centric level which is helpful in updating and informing all the manpower who are related to the work. This ensures that no one at construction site will repeat same work effectively. As a result whole work of construction will be completed in less time. Enhances coordination:This model operates whole work incentralised manner which conveys essential information to all workers at the same time. It enhances coordination among them and builds positive working environment for workers. Increasescustomersatisfaction:Buildinginformationmodelisimportantasit accomplishes whole construction project in less time. Along with this, it can be said that overall whole work is done with high quality, consistency and transparency that will be helpful in producingeffectiveconstructivebuilding.Asaresult,itwilldirectlyincreasecustomer satisfaction level. According to the above mentioned importance of building information modelling it can be said that it impacts positively on employees as it increases safety level for workers. The stated model is successful in improving working environment at construction site which ensures that workers will are safe at location. It also helps in decreasing different issues which are faced by workers while working. It can be said earlier workers were not getting appropriate and safe working environment which demotivate them to perform their assigned task effectively. The BIM technique uses different model according to the requirement of the current task . It helps in solving the difficult or complex task of the worker in effective time and in 6
efficient manner. Using BIM the understanding of process management becomes easy which helps the upper level employee to understand the task and then to convey the information to their worker or labour effectively through the digital medium or through the sign language to make labour understand quickly. The BIM model or files can be easily stored and extracted easily and can share the common information to the different region with the help of high speed network and its helps in the decision making process while remaining in the field itself. 4.2.6.Influence of Site Environmental Factors on Accidents of high rise building construction in Australia which affects safety measures of workers According to the study ofAbdelhamid and Everret, (2014), it is stated that the influence of architects, clients, contractors and project manager in putting the life of the workers in danger is explored to a great extent. On the other hand, the workers who are involved in the site construction are spelt out clearly. The factors which are responsible for the unsafe environmental conditions are left totally incomplete in nonattendance of the site environment where the accident is taking place (Ku & Mills, 2010). The Occupational Health and Safety Administration indicates that it is the responsibility of all the employers in order to develop a safe working environment where all the workers will be happily working without facing any type of difficulty. The place where different activities related to construction are carried had to be safe in order to achieve the best results. There are different accidents on sites which affects the safety of customers such as housekeeping hazards, inadequate guarded sites etc. 7
(Source:Accidents at construction sites, 2018) Numerous types of accident occur on site comprising ofcontact with objects, and such objects are inclusive of working tools, electricity, and welding arc flash, with the causes being as a result of the workers’ exposures to cables or machines carrying electric current, contact with energised power line, working without personal protective equipment, improperly installed or damaged equipment, and safe voltage or earth failure. One more problem which is wind because high rise buildings where number of floors stays really very high, after reaching to a specific level of height, wind flows with a huge speed which may create problems for workers at construction site, site environment and proper analysis of project manager may help in making right decisions as per the requirements (Sattineni & Azhar, 2010). 4.2.7. Importance ofConstruction Safety Planand its functions to achieve specific goal i.e. reducing falling risks 8 Illustration1: Accidents at construction sites
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
In today's world, every single country is building multi storied complexes which raised number of risks for workers at the time of performing tasks at constructing site. It is required for project manager of a whole construction site to keep his/her focus over elements that can impact performance level of workers. In order to do so, CSP (Construction Safety Plan) is majorly made that helps in reducing hazardous situations at workstation. Construction Safety Plan and its importance is thata checklist for construction workers which generally includes safety procedures and emergency procedures, and in some cases include first aid procedures, that helps in using personal protective equipment and many other places (Tarar & Dang, 2012). Some of essential things which a construction safety plan mostly consider and these are : The safety representative Medical treatment Safety inspections Safety indoctrination Continuous safety training Housekeeping Protective equipment Accident reports Work zone warning devices and so on. It is required for project manager develop a plan as per the requirements through which number of chances related to hazardous situation can be reduced to zero. On the other hand, while applying BIM at construction site, it is required to have a CSP that ensures safety and security concerns of workers at the time they perform tasks at construction sites. On the other hand, main function that helps in reducing risks for individuals at workplace is that the harm which has caused the construction process and formulate appropriate safety measures for each stage. Here, it is being found that contractor from time to time needs to ensure a safe constructionprocess(Zhangandet.al.,2013).Consideringthismayhelpcontractorin developing much more effective plan for the people who are delivering number of tasks at high rise buildings. This may easily aid in developing a healthy and safe environment then also when there is high risk involved for the workers. 9
Whenever a non-routine project or task is necessary, a job hazard analysis shall be performed to evaluate the potential risk of injury to personnel. The analysis will assess each aspect of a task and address the items which could result in an injury to an individual. This involves an evaluation of the mechanics of the operation, identifying what can go wrong, and how to do it safely. (Source:Construction Workers Fatalities,2018) 4.3 Discussion This is being considered as the section related to study which needs to be discussed and analysed in much important ways as it stays vital for whole investigation to get completed in specific time frame. Worker's safety at construction site remains one of the main subject for every single construction company. BIM which shows digital representation related to physical and graphical site may aid a firm in making effective decisions related to workers while they are 10 Illustration2: Construction Workers Fatalities
performing there tasks. It is being found that there are number of benefits that will help company in focusing over number of areas. As given by The National Building Information Model Standard Project Committee, application of Building Information Modelling (BIM) in a project of construction site helps in delivering right information to correct person that helps in making effective decisions as per the requirements (Zhu and et. al., 2016). On the other hand, BIM also aid in delivering information related to how individual teams work and how many teams work together to conceive, design, and build projects. Here,it has been critically analysed that information which is collected by the researcher is somewhat correct as, BIM majorly helps in delivering right digitalised information to the individuals who are connected in a construction project. But, it has also been analysed that somewhere author is wrong as well because sometimes the data which has been provided by BIM stays irrelevant which may create problems for the engineers like losses, issues related to work safety at high rise building and many more. On the other hand, view point ofPatrick Villella, (2009), divided building information modelling technology in different dimensions like 2D, 3D, 4D and 5D technology. Author stated that in initial years of construction industry, 2D technology was widely used then engineers used 3D, 4D and then 5D BIM program due to changein technology and course. This has helped in improving safety standards for the workers while performing tasks at high rise buildings and so on. Here, it has been critically analysed that what author have mentioned helped construction companies of Australia have successfully maintained security level of workers. It aids in delivering right information in short period of time which reduced number of chances of wrong happenings. Thus, it is examined that changes are necessary in every single technology at construction industry as they may aid in making right decisions as per the requirements of delivering proper safety to workers. Also, 4D CAD models can be helpful in bringing safety at construction site while designing the specific phases. Viewpoint of Benjaoran and Bhokha, (2010), clearly showed that with the help of this type of model, every single factor comes in front which is related to the project like risks involvement, benefit, time schedule an many more. Through this, workers can keep there concentration over risky areas and through this, staff members at high building constructing sites can work safely. 11
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
In modern Australia, building's heights are rapidly increasing which is ultimately raising number of security concerns for workers at construction site. In order to deliver right security for both workers which developing the building and people that are going to live or work in buildings needs to have really very strong base and needs to be be placed right on solid rock surface. Hing, (2006), mentioned that every single building which is having ample number of stores needs to handle a number of loads like special, seismic, impact and blast loads. Here, if it is discussed over what author have mentioned than it is being analysed that there is another load which author did not considered as the major one but plays a crucial role while constructing the building and i.e. wind load. Away with this, while performing tasks at building with great heights, carries good number of risks. It is required for seniors to deliver number of training to workers while performing tasks so that to reduce chances of fall accidents (Safe Work Australia, 2015). Lastly, it can also be discussed that construction safety plan is being considered as a checklist that helps workers at construction site in different ways. This is majorly used by constructing workers while performing tasks to become ensured over safety measures. First aid procedures, protective equipment, temporary and permanent fences are some of major tools that are used to improve security at workstation while performing tasks. 4.4 Summary As per the above mentioned secondary method based discussion and analysis, about particular topic i.e. how to use BIM to ensure workers safety in high rise building construction in Australiawhich are discussed in literature review. All the findings were structured appropriately. It can be said that it is important for project manager to take safety measure for the workers who are working at construction site. BIM tools are helpful in arranging construction schedule and also guides in selecting proper work place for workers which is secured enough for them. These models if used then help workers in different ways as, they can have an idea about danger through animated models in advance only (Safeopedia, 2017). As per evaluation, it can be said that BIM can be considered as one of the best method which avail protection at construction site because it helps in delivering right information to users as per the requirements. Data which BIM technology gives can easily develop construction safety plan. 12
REFERENCES Books and Journals Benjaoran,V&Bhokha,S2010,‘Anintegratedsafetymanagementwithconstruction management using 4D CAD model', Safety Science, vol. 48, no. 3, pp. 395-403. Bobick, T. G, McKenzie Jr, E. A & Kau, T. Y 2010,‘Evaluation of guardrail systems for preventing falls through roof and floor holes’,Journal of safety research, vol. 41, no. 3, pp.203-211. Cheung, E & Chan, A.P 2012,‘Rapid demountable platform (RDP)—A device for preventing fall from height accidents’,Accident Analysis & Prevention, vol. 48, pp.235-245. Hardin, B 2011, BIM and Construction Management: Proven Tools, Methods, andWorkflows. John Wiley & Sons, Indiana, USA Hardin, B & McCool, D 2015,BIM and construction management: proven tools, methods, and workflows. John Wiley & Sons. Ku, K& Mahabaleshwarkar, P.S 2011,‘Building interactive modeling for construction education in virtual worlds’,Journal of Information Technology in Construction (ITcon), vol. 16, no. 13, pp.189-208. Leonid, L& Feodor, P 2016,‘The phenomenon of the Saint Petersburg variant of the regular city’,Architecture and Engineering, vol. 1, no. 1. Namian M, Zuluaga C M & Albert A 2016, ‘Critical Factors That Impact Construction Workers’ Hazard Recognition Performance’, In Proceedings of Construction Research Congress 2016, pp. 2762-2772, viewed 19 May 2018, <https://ascelibrary.org/doi/abs/10.1061/9780784479827.275>. National Building Information Model Standard Project Committee, 2014, Frequently Asked QuestionsAbouttheNationalBIMStandard-UnitedStates™, <https://web.archive.org/web/20141016190503/http://www.nationalbimstandard.org/ faq.php#faq17> Ku, K&Mills, T 2010,‘Research needs for Building Information Modeling for construction safety’,Proceedingsofthe47thASCAnnualInternationalConference,Omaha, Nebraska. Sattineni, A& Azhar, S 2010,‘Techniques for tracking RFID tags in a BIM model’,Proceedings of the 27th ISARC, The International Association for Automation and Robotics in Construction (IAARC), Bratislava. Tarar, M & Dang, D. T. P 2012,‘Impact of 4D Modeling on Construction Planning Process’ Zhang, S.J. and et. al., 2013, 'Building Information Modeling (BIM) and Safety: Automatic Safety Checking of Construction Models and Schedules', Automation in Construction, vol. 29, pp. 183-195. Zhu, Z. and et. al., 2016,‘Predicting movements of onsite workers and mobile equipment for enhancing construction site safety’,Automation in Construction, vol. 68, pp.95-101. Online SafeWorkAustralia.2015.[Online].Availablethrough: <https://www.safeworkaustralia.gov.au/construction>. Safeopedia.2017.[Online].Availablethrough: <https://www.safeopedia.com/definition/703/construction-safety-plan>. 13