MAIN BODY...................................................................................................................................1
Work Breakdown Structure.............................................................................................................1
Time Management...........................................................................................................................1
Defined Activities and Time Estimates..................................................................................2
Work Sequence (Work Flow Diagram)..................................................................................3
Project Schedule.....................................................................................................................3
Cost Management............................................................................................................................4
Cost Estimate Methodology...................................................................................................4
WBS Work Packages.............................................................................................................4
Indirect and overhead Costs...................................................................................................5
Contingency and Profits.........................................................................................................6
Total Project Cost Estimates..................................................................................................6
Cost Control and Tracking.....................................................................................................6
REFERENCES................................................................................................................................7

MAIN BODY
In context to Heathrow Airport, the milestones provide deeper and better understanding of
the overall project with the help of various tools, techniques and methods of the project life
cycle. The scope statement shows the project’s objectives and its boundaries in terms of its
milestones, budget and deliverables.
Work Breakdown Structure
The work breakdown structure is considered to be a management tool that comprises of a
step by step approach in order to complete the project with the use of several moving pieces
(Lee, J.Y. and Lee, S.W.H., 2018).
Time Management
Gantt chart is the most useful and powerful technique for showing the activities that is
performed against the time. This chart is basically representing a set of activities in which at the
left side it reflects the chart of a list of the activities and at the top it shows the time scale. In the
chart, there are bars that represent the activities that is done and the length of the bar shows the
duration of the whole activity.
1

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Importance of WBS and Network Diagrams in a Project
|5
|696
|101

Upgrade of Network in the University
|15
|2380
|290

SIM335 - Managing Projects Assignment
|23
|5272
|110

Weekend Music Festival Project Plan
|5
|700
|38

Project Analysis Assignment
|3
|597
|83

Project Scope and Time Management Plan
|17
|1348
|317