Hotel Website Design, Implementation, and Evaluation: A Comprehensive Project Report
VerifiedAdded on 2024/05/17
|52
|7389
|220
AI Summary
This report details the design, implementation, and evaluation of a hotel website project. It covers the project formulation, including outlining project specifications, identifying contributing factors for project selection, and producing a detailed project plan. The report then delves into the implementation phase, outlining resource allocation, project execution, and systematic recording of outcomes. Finally, the report evaluates the project's success through PERT analysis, SDLC cycles, and GAP analysis, providing recommendations for future improvements. The report concludes with a presentation of the project's outcomes, including website functionality ratings, special features, and project evaluation.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.

Project Design Implementation and
Evaluation
1
Evaluation
1
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

Table of Contents
Introduction:.......................................................................................................................4
LO1 Be able to formulate a project..............................................................................5
1.1 Formulated and recorded possible outline project specifications........................5
1.2 Identified the factors that contributed to the process of project selection............8
1.3 Produced a specification for the agreed project.................................................12
1.4 Produced an appropriate project plan for the agreed project............................14
LO2 Be able to implement the project within agreed procedures and to specification
19
2.1 Matched resources efficiently to the project.......................................................19
2.2 Undertook the proposed project in accordance with the agreed specification. .22
2.3 Organised, analysed and interpreted relevant outcomes..................................24
LO3 Be able to evaluate the project outcomes...............................................................29
3.1 Use of appropriate project evaluation techniques.................................................29
PERT Analysis.............................................................................................................29
3.2 How you interpreted and analysed the results in terms of the original project
specification.................................................................................................................32
Resource:.....................................................................................................................32
3.3 How you made recommendations and justified areas for further consideration. . .35
LO4 Be able to present project outcomes.......................................................................39
4.1 Produce a record of all project procedures used...............................................39
4.2 Used an agreed format and appropriate media to present the outcomes of the
project to an audience..................................................................................................44
Conclusion:......................................................................................................................48
References.......................................................................................................................49
2
Introduction:.......................................................................................................................4
LO1 Be able to formulate a project..............................................................................5
1.1 Formulated and recorded possible outline project specifications........................5
1.2 Identified the factors that contributed to the process of project selection............8
1.3 Produced a specification for the agreed project.................................................12
1.4 Produced an appropriate project plan for the agreed project............................14
LO2 Be able to implement the project within agreed procedures and to specification
19
2.1 Matched resources efficiently to the project.......................................................19
2.2 Undertook the proposed project in accordance with the agreed specification. .22
2.3 Organised, analysed and interpreted relevant outcomes..................................24
LO3 Be able to evaluate the project outcomes...............................................................29
3.1 Use of appropriate project evaluation techniques.................................................29
PERT Analysis.............................................................................................................29
3.2 How you interpreted and analysed the results in terms of the original project
specification.................................................................................................................32
Resource:.....................................................................................................................32
3.3 How you made recommendations and justified areas for further consideration. . .35
LO4 Be able to present project outcomes.......................................................................39
4.1 Produce a record of all project procedures used...............................................39
4.2 Used an agreed format and appropriate media to present the outcomes of the
project to an audience..................................................................................................44
Conclusion:......................................................................................................................48
References.......................................................................................................................49
2

List of Figures
Figure 1: WBS for the Hotel website for Phase 1............................................................15
Figure 2: Grant chat for the Hotel website Phase 1........................................................15
Figure 3: WBS for the Hotel website for Phase 2............................................................17
Figure 4: Grant chat for the Hotel website Phase 2........................................................18
Figure 5: Project Management Cycle..............................................................................19
Figure 6: Systematic Recording of web design project...................................................23
Figure 7: PERT Analysis..................................................................................................29
Figure 8: Software Development Lifecycle......................................................................30
Figure 9: Project specification Phase..............................................................................32
Figure 10: Ghant Chart for Project specification Phase..................................................33
Figure 11: cost status......................................................................................................34
Figure 12: Cost Details....................................................................................................34
Figure 13: Project Phase.................................................................................................39
Figure 14: Resource allocation for the project.................................................................41
Figure 15: Ghant chat for the resource allocation...........................................................42
Figure 16: Cost flow the project.......................................................................................43
Figure 17: Website functionality rating............................................................................44
Figure 18: Pert Analysis...................................................................................................47
3
Figure 1: WBS for the Hotel website for Phase 1............................................................15
Figure 2: Grant chat for the Hotel website Phase 1........................................................15
Figure 3: WBS for the Hotel website for Phase 2............................................................17
Figure 4: Grant chat for the Hotel website Phase 2........................................................18
Figure 5: Project Management Cycle..............................................................................19
Figure 6: Systematic Recording of web design project...................................................23
Figure 7: PERT Analysis..................................................................................................29
Figure 8: Software Development Lifecycle......................................................................30
Figure 9: Project specification Phase..............................................................................32
Figure 10: Ghant Chart for Project specification Phase..................................................33
Figure 11: cost status......................................................................................................34
Figure 12: Cost Details....................................................................................................34
Figure 13: Project Phase.................................................................................................39
Figure 14: Resource allocation for the project.................................................................41
Figure 15: Ghant chat for the resource allocation...........................................................42
Figure 16: Cost flow the project.......................................................................................43
Figure 17: Website functionality rating............................................................................44
Figure 18: Pert Analysis...................................................................................................47
3

Introduction:
Aim: To develop decision making, communication integrated, knowledge of the realistic
project and problem-solving skills.
Project Design Implementation and Evaluation is a team approach that developed an
online project with Instructional design, media production, content development, website
service development and Project Leader learning technology. Here, we have designed
a report on hotel website PDIE.
In the first section, we will propose two proposals for the current website. We will also
create an estimated idea resource allocation and grant chart.
In the Second section, we will explain project management cycle for the implantation
plan. Website design outcome will be analysed by the logbook and user feedback.
In the third section, we will project evaluation techniques such as pert analysis, and
SDLC cycles. Resource allocation and grant chart will be representing the out of the
website that will be analysis systematic recording and GAP analysis.
In the fourth section, we will project phase for the website design outcomes and website
specification. Further, we will explain project evaluation and presented the graph on the
website design.
4
Aim: To develop decision making, communication integrated, knowledge of the realistic
project and problem-solving skills.
Project Design Implementation and Evaluation is a team approach that developed an
online project with Instructional design, media production, content development, website
service development and Project Leader learning technology. Here, we have designed
a report on hotel website PDIE.
In the first section, we will propose two proposals for the current website. We will also
create an estimated idea resource allocation and grant chart.
In the Second section, we will explain project management cycle for the implantation
plan. Website design outcome will be analysed by the logbook and user feedback.
In the third section, we will project evaluation techniques such as pert analysis, and
SDLC cycles. Resource allocation and grant chart will be representing the out of the
website that will be analysis systematic recording and GAP analysis.
In the fourth section, we will project phase for the website design outcomes and website
specification. Further, we will explain project evaluation and presented the graph on the
website design.
4
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

LO1 Be able to formulate a project
1.1 Formulated and recorded possible outline project specifications
Here, we have explained the two project definition for the current website.
Project Definition 1:
Project Name:
Implementation of the payment system, Login process, chatbot and enhanced the
Website GUI for the Exmouth view hotel website.
The objective of the project:
Exmouth view hotel primary objective is providing the excellent service and best product
quality which satisfied the customer. Then increase the volume of the customer which
helps the enhance the hotel business. Hotel staff Satisfaction is necessary for the
website. The hotel wants to maximise profit with customer satisfaction.
Risks:
Here, we have defined the Risk that may be faced during web designed.
The website may be providing lack of enterprise search product with content
faceting which makes designer loosed of time and money.
The website may be loosed the traffic on the server which impacted the SEO of
the website.
Payment gateway hacked by the third party which may affect the customer
sensitive data (McInnis, 2015).
Constraints of the project:
5
1.1 Formulated and recorded possible outline project specifications
Here, we have explained the two project definition for the current website.
Project Definition 1:
Project Name:
Implementation of the payment system, Login process, chatbot and enhanced the
Website GUI for the Exmouth view hotel website.
The objective of the project:
Exmouth view hotel primary objective is providing the excellent service and best product
quality which satisfied the customer. Then increase the volume of the customer which
helps the enhance the hotel business. Hotel staff Satisfaction is necessary for the
website. The hotel wants to maximise profit with customer satisfaction.
Risks:
Here, we have defined the Risk that may be faced during web designed.
The website may be providing lack of enterprise search product with content
faceting which makes designer loosed of time and money.
The website may be loosed the traffic on the server which impacted the SEO of
the website.
Payment gateway hacked by the third party which may affect the customer
sensitive data (McInnis, 2015).
Constraints of the project:
5

Here, we have explained the Constraints of Exmouth view hotel website.
Website GUI: Website GUI is not good. There are no proper linking between the
webpage, used the less image for the information and Image are blur and
provide the less information.
Payment Gateway: Website has no payment gateway for the online payment.
The user cannot pay through PayPal, visa, and master card etc.
Communication system: User cannot communicate with the hotel directly so
they are not able to solve their problem.
Login System: Website has no login system for the user. The user feels
difficulty to access the website. They cannot access the service and product of
the website (Gardner, 2009).
Successfully Completion:
After the completion of the project, hotel website provides the online payment system
(pay the online), Login process (easy access the project), chatbot (for the customer)
and enhanced the Website GUI.
Project Definition 2:
Project Name:
Enhanced the website GUI and Implementation Login process for the Exmouth view
hotel website.
Objective of the project:
Project main objective is designed the Login process and enhanced the Website GUI.
Login process makes easy access to the hotel staff and customer. Website GUI offers
more information to the user and easy to understand the scope, service, and product.
Risks:
6
Website GUI: Website GUI is not good. There are no proper linking between the
webpage, used the less image for the information and Image are blur and
provide the less information.
Payment Gateway: Website has no payment gateway for the online payment.
The user cannot pay through PayPal, visa, and master card etc.
Communication system: User cannot communicate with the hotel directly so
they are not able to solve their problem.
Login System: Website has no login system for the user. The user feels
difficulty to access the website. They cannot access the service and product of
the website (Gardner, 2009).
Successfully Completion:
After the completion of the project, hotel website provides the online payment system
(pay the online), Login process (easy access the project), chatbot (for the customer)
and enhanced the Website GUI.
Project Definition 2:
Project Name:
Enhanced the website GUI and Implementation Login process for the Exmouth view
hotel website.
Objective of the project:
Project main objective is designed the Login process and enhanced the Website GUI.
Login process makes easy access to the hotel staff and customer. Website GUI offers
more information to the user and easy to understand the scope, service, and product.
Risks:
6

Here, we have defined the Risk that may be faced during web designed.
The user may change their requirements so the system will change their plan
and designing process.
There is server related issue which may handle some time difficult (McInnis,
2015).
Constraints of the project:
Here, we have explained the Constraints of Exmouth view hotel website.
Website GUI: There is no proper linking between the webpage, Image is a blur
and provide the less information and used the less image for the information and.
Login System: Website has no login system for the user. They cannot access
the service and product of the website (Gardner, 2009).
Successfully Completion:
After the completion of the project, hotel website provides the Login process (easy
access the project) and enhanced the Website GUI.
7
The user may change their requirements so the system will change their plan
and designing process.
There is server related issue which may handle some time difficult (McInnis,
2015).
Constraints of the project:
Here, we have explained the Constraints of Exmouth view hotel website.
Website GUI: There is no proper linking between the webpage, Image is a blur
and provide the less information and used the less image for the information and.
Login System: Website has no login system for the user. They cannot access
the service and product of the website (Gardner, 2009).
Successfully Completion:
After the completion of the project, hotel website provides the Login process (easy
access the project) and enhanced the Website GUI.
7
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

1.2 Identified the factors that contributed to the process of project
selection
Here, we have taken feedback from the user and stakeholders on the current
hotel website.
User Feedback:
User 1
S.no Question User 1
1. How is the website GUI? Not Good
2. Is the website responsive to the
browser?
Yes
3. Is the need of Navigation of the
website pages?
Yes
4. How is the communication with the
customer?
Avg.
User 2
S.no Question User 2
1. Is the Hotel website is need of the
login process?
Yes
2. Is the hotel need for online payment
system?
Yes
8
selection
Here, we have taken feedback from the user and stakeholders on the current
hotel website.
User Feedback:
User 1
S.no Question User 1
1. How is the website GUI? Not Good
2. Is the website responsive to the
browser?
Yes
3. Is the need of Navigation of the
website pages?
Yes
4. How is the communication with the
customer?
Avg.
User 2
S.no Question User 2
1. Is the Hotel website is need of the
login process?
Yes
2. Is the hotel need for online payment
system?
Yes
8

3. Is the website giving the proper
information about the service?
No
4. Are you satisfied with the hotel
service?
No
User 3
S.no Question User 3
1. Is the website responsive to the
browser?
Yes
2. How is the website GUI? Avg.
3. Are you satisfied with the hotel
service?
No
4. Is the hotel need for online payment
system?
Yes
User 4
S.no Question User 4
1. How is the communication with the
customer?
Not good
2. Is the Hotel website is need of the
login process?
Yes
3. Is the website responsive to the No
9
information about the service?
No
4. Are you satisfied with the hotel
service?
No
User 3
S.no Question User 3
1. Is the website responsive to the
browser?
Yes
2. How is the website GUI? Avg.
3. Are you satisfied with the hotel
service?
No
4. Is the hotel need for online payment
system?
Yes
User 4
S.no Question User 4
1. How is the communication with the
customer?
Not good
2. Is the Hotel website is need of the
login process?
Yes
3. Is the website responsive to the No
9

browser?
4. Is the website giving the proper
information about the service?
No
Recommendation:
According to user feedback, there are needs following recommendation for the
website:
Payment gateway should be designed for online payment. Hotel website
should be developed for a secure payment system for their customers.
The Chatbot is needed for the customers’ communication. It is a virtual
way to communicate with the customer and get their requirements and
feedbacks.
Hotel GUI is not at the time so there need to improve the GUI through
designed the navigation, provide the suitable image which gives proper
info about hotel service and product.
The customer wants a login process on the hotel website. The login
process helps easy access to the website. Login process also needs the
database.
Total Cost:
Hotel PDIE project estimated cost £ 18,500.00 for the designed the payment
gateway (need for the secure online payment process), Website GUI (need
image which gives the proper info about), Login process (for user login process)
and chatbot (communication with the user in a virtual way).
Possible Financial Benefit
Increase the Customer: Online process access by the global community
which enhanced the hotel business. It also established the market value of
the hotel. Hotel website makes visible the hotel on the worldwide that
increase the customer of the hotel.
10
4. Is the website giving the proper
information about the service?
No
Recommendation:
According to user feedback, there are needs following recommendation for the
website:
Payment gateway should be designed for online payment. Hotel website
should be developed for a secure payment system for their customers.
The Chatbot is needed for the customers’ communication. It is a virtual
way to communicate with the customer and get their requirements and
feedbacks.
Hotel GUI is not at the time so there need to improve the GUI through
designed the navigation, provide the suitable image which gives proper
info about hotel service and product.
The customer wants a login process on the hotel website. The login
process helps easy access to the website. Login process also needs the
database.
Total Cost:
Hotel PDIE project estimated cost £ 18,500.00 for the designed the payment
gateway (need for the secure online payment process), Website GUI (need
image which gives the proper info about), Login process (for user login process)
and chatbot (communication with the user in a virtual way).
Possible Financial Benefit
Increase the Customer: Online process access by the global community
which enhanced the hotel business. It also established the market value of
the hotel. Hotel website makes visible the hotel on the worldwide that
increase the customer of the hotel.
10
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

Opportunity: Hotel online process or website makes the Opportunity for
the hotel business. The website helps to develop a trust of the customer
which enhanced the hotel business revenue. Product and service that is
satisfied the customer hotel try to make better for the customer and
improved the other service which does not satisfy the customer.
Established the Market value: Hotel website helps the Established the
Market value. Good service and product make the customer satisfied
which help to make the customer regular. The website gave the more
chance to gain a number of regular customers that enhanced the
business. The website helps to establish the good relationship with the
customer. A good relationship with customer established the brand value
of the hotel. Brand value enhanced the hotel business (Dogulin Digital,
2016).
Business needs:
Real-time System: Hotel needs a real-time service system for booking the
hotel and increased the integrations of the property management system.
Integrations help to make provide smooth and quick access facilitate the
booking process.
Automating services: Hotel needs a login process system for the
Automating services. Automating services help the collected the customer
data that help in the business enhanced and success.
Communication System: Hotel needs a communication system which
helps to direct communication with the customer. It improved the system
that will enhance the hotel business.
Secure Payment System: Hotel needs a secure online payment system
which helped online payment. It offered to user pay the payment through
PayPal, master card, Visa etc (SiteMinder, 2017).
11
the hotel business. The website helps to develop a trust of the customer
which enhanced the hotel business revenue. Product and service that is
satisfied the customer hotel try to make better for the customer and
improved the other service which does not satisfy the customer.
Established the Market value: Hotel website helps the Established the
Market value. Good service and product make the customer satisfied
which help to make the customer regular. The website gave the more
chance to gain a number of regular customers that enhanced the
business. The website helps to establish the good relationship with the
customer. A good relationship with customer established the brand value
of the hotel. Brand value enhanced the hotel business (Dogulin Digital,
2016).
Business needs:
Real-time System: Hotel needs a real-time service system for booking the
hotel and increased the integrations of the property management system.
Integrations help to make provide smooth and quick access facilitate the
booking process.
Automating services: Hotel needs a login process system for the
Automating services. Automating services help the collected the customer
data that help in the business enhanced and success.
Communication System: Hotel needs a communication system which
helps to direct communication with the customer. It improved the system
that will enhance the hotel business.
Secure Payment System: Hotel needs a secure online payment system
which helped online payment. It offered to user pay the payment through
PayPal, master card, Visa etc (SiteMinder, 2017).
11

12

1.3 Produced a specification for the agreed project
We have chosen the first project specification plan. Here, we have designed
payment gateway, chatbot design, login process, and improved the GUI of the
website.
Project Name:
Implementation of the payment system, Login process, chatbot and enhanced
the Website GUI for the Exmouth view hotel website.
Objectives:
Project primary objective is designed the payment system, login system, chatbot
and GUI of the website which enhanced the hotel business. The project will be
established the customer relationship that hotel revenue.
Key Audiences:
Hotel customer, staff, and Prospective client and employees are a key audience
of the hotel website. Project objective defined for the key Audiences that may
affect the hotel business.
Non-functional requirements
Usability: Hotel website accessible on different type browser and mobile,
tablets, and desktop.
Security: Website secure for the sensitive database.
Loading times: website loading time is less because it uses the
compressed image.
Legal: Hotel Website defined the term and conditions for the customer
payment.
Functional requirements
Online payment system: Project provides an online payment system
which through customer pays for service.
13
We have chosen the first project specification plan. Here, we have designed
payment gateway, chatbot design, login process, and improved the GUI of the
website.
Project Name:
Implementation of the payment system, Login process, chatbot and enhanced
the Website GUI for the Exmouth view hotel website.
Objectives:
Project primary objective is designed the payment system, login system, chatbot
and GUI of the website which enhanced the hotel business. The project will be
established the customer relationship that hotel revenue.
Key Audiences:
Hotel customer, staff, and Prospective client and employees are a key audience
of the hotel website. Project objective defined for the key Audiences that may
affect the hotel business.
Non-functional requirements
Usability: Hotel website accessible on different type browser and mobile,
tablets, and desktop.
Security: Website secure for the sensitive database.
Loading times: website loading time is less because it uses the
compressed image.
Legal: Hotel Website defined the term and conditions for the customer
payment.
Functional requirements
Online payment system: Project provides an online payment system
which through customer pays for service.
13
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Login process: User can be logged into the website and access all
service.
Communication system: Chatbot is a virtual way to communicate with a
customer that help solved user query and provide the necessary
information (O'Byrne, 2018).
Budget:
Project estimated budget is £ 18,500.00. it is a short-term project which
completed in the 7 to 8 weeks.
14
service.
Communication system: Chatbot is a virtual way to communicate with a
customer that help solved user query and provide the necessary
information (O'Byrne, 2018).
Budget:
Project estimated budget is £ 18,500.00. it is a short-term project which
completed in the 7 to 8 weeks.
14

1.4 Produced an appropriate project plan for the agreed project
Here, we have explained the WBS and Grant chat for the proposed the plan.
Create WBS and Grant chat:
WBS is a working model that performed the work in the project management in the
hierarchical structure. WBS also works as a tool which defined the tasks and resource
that completed these tasks in the projects.
We have designed WBS for the Hotel website that has eight phase for the completed
the design.
Planning and information collection phase collected the data or information and
designed the planned for completion the project.
Define the concept phase defined the project objective and developed the SDLC
cycle.
Define the Requirements phase defined user, server and content requirements
and also analysis the Risk and specification of the project.
HR resource management phase manages the resources, provide the training to
the staff and selection the team for the project.
Developed the setup phase established the software and hardware setup for the
project completion.
Design the website phase designed the website GUI, payment system,
Database, and chatbot.
Testing phase tests the project according to user and system requirements.
Implementation phase performed the validation and verification process and
analysis the project resources and program code.
Phase 1 WBS and Grant chart
15
Here, we have explained the WBS and Grant chat for the proposed the plan.
Create WBS and Grant chat:
WBS is a working model that performed the work in the project management in the
hierarchical structure. WBS also works as a tool which defined the tasks and resource
that completed these tasks in the projects.
We have designed WBS for the Hotel website that has eight phase for the completed
the design.
Planning and information collection phase collected the data or information and
designed the planned for completion the project.
Define the concept phase defined the project objective and developed the SDLC
cycle.
Define the Requirements phase defined user, server and content requirements
and also analysis the Risk and specification of the project.
HR resource management phase manages the resources, provide the training to
the staff and selection the team for the project.
Developed the setup phase established the software and hardware setup for the
project completion.
Design the website phase designed the website GUI, payment system,
Database, and chatbot.
Testing phase tests the project according to user and system requirements.
Implementation phase performed the validation and verification process and
analysis the project resources and program code.
Phase 1 WBS and Grant chart
15

Figure 1: WBS for the Hotel website for Phase 1
Figure 2: Grant chat for the Hotel website Phase 1
Planning and information collection phase complete in 5 days that collected
information and make a plan for the project.
Define the concept phase complete in 3 days that explained project goals.
Define the Requirements phase complete in 10 days that collected all
requirements and project specification.
16
Figure 2: Grant chat for the Hotel website Phase 1
Planning and information collection phase complete in 5 days that collected
information and make a plan for the project.
Define the concept phase complete in 3 days that explained project goals.
Define the Requirements phase complete in 10 days that collected all
requirements and project specification.
16
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

HR resource management phase complete in 14 days that managed resource
and team.
Developed the setup phase complete in 5 days that designed project setup.
Design the website phase complete in 14 days that developed Database,
payment system, chatbot for the website.
Testing phase complete in 7 days that test software and hardware.
Implementation phase in 5 days that analysis resource and requirements.
Phase 2 WBS and Grant chart
17
and team.
Developed the setup phase complete in 5 days that designed project setup.
Design the website phase complete in 14 days that developed Database,
payment system, chatbot for the website.
Testing phase complete in 7 days that test software and hardware.
Implementation phase in 5 days that analysis resource and requirements.
Phase 2 WBS and Grant chart
17

Figure 3: WBS for the Hotel website for Phase 2
18
18

Figure 4: Grant chat for the Hotel website Phase 2
19
19
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

LO2 Be able to implement the project within agreed procedures and
to specification
2.1 Matched resources efficiently to the project
We have designed the project Management cycle for the matched the resources
efficiently. Project management cycle has five phase that helps to complete the project
with given resources and cost.
Figure 5: Project Management Cycle
Source: (Taknopoint, 2017)
Project Initiation
It is initiation phase where defined the project goal. We have feasibility study of current
hotel website that helps to how to complete the project. We created the project charter
and PID that defined the hotel purposed and requirements. In this phase include the
project stakeholder (project manager, HR manager, tester engineer, software engineer,
and hardware engineer), business need, and business case.
20
to specification
2.1 Matched resources efficiently to the project
We have designed the project Management cycle for the matched the resources
efficiently. Project management cycle has five phase that helps to complete the project
with given resources and cost.
Figure 5: Project Management Cycle
Source: (Taknopoint, 2017)
Project Initiation
It is initiation phase where defined the project goal. We have feasibility study of current
hotel website that helps to how to complete the project. We created the project charter
and PID that defined the hotel purposed and requirements. In this phase include the
project stakeholder (project manager, HR manager, tester engineer, software engineer,
and hardware engineer), business need, and business case.
20

Phase 2: Project Planning
Project Manager designed the roadmap for the website designed. We have selected
SMART Setting goals for the website planning.
Specific: who used website, why the need of the website, and what the use of
the website?
Measurable: project Manager designed the planed completed the project and
defined term and conditions.
Create criteria that you can use to measure the success of a goal.
Attainable: the website should be provided proper information with image and
implemented payment system and login system.
Realistic: Project will work on the payment system, login system, chatbot, and
database system
Timely: project manager will be decided this project completed in 7 to 8 weeks
(Esposito, 2015).
Project Execution
In this phase, designed the team (Project manager, software engineer, hardware
engineer, database developer), selected the resources for hotel website and make a
plan how to execute the project. Project manager installed WordPress, designed the
database and network server for the hotel website. Project manager scheduled the
project. The project will be completed in the 61 days. During the project execution,
project Manager tracked and monitored the project and take the team manager meeting
to solve the problem which arises during the website development.
Project Performance/Monitoring
Hotel website performance measure according to key performance indicators that
determine the project is on the track. KPI used factors to perform hotel website project.
21
Project Manager designed the roadmap for the website designed. We have selected
SMART Setting goals for the website planning.
Specific: who used website, why the need of the website, and what the use of
the website?
Measurable: project Manager designed the planed completed the project and
defined term and conditions.
Create criteria that you can use to measure the success of a goal.
Attainable: the website should be provided proper information with image and
implemented payment system and login system.
Realistic: Project will work on the payment system, login system, chatbot, and
database system
Timely: project manager will be decided this project completed in 7 to 8 weeks
(Esposito, 2015).
Project Execution
In this phase, designed the team (Project manager, software engineer, hardware
engineer, database developer), selected the resources for hotel website and make a
plan how to execute the project. Project manager installed WordPress, designed the
database and network server for the hotel website. Project manager scheduled the
project. The project will be completed in the 61 days. During the project execution,
project Manager tracked and monitored the project and take the team manager meeting
to solve the problem which arises during the website development.
Project Performance/Monitoring
Hotel website performance measure according to key performance indicators that
determine the project is on the track. KPI used factors to perform hotel website project.
21

Project objective (designed payment gateway, database, login process, chatbot
and GUI) will be met according to given budget and schedule
Hotel website delivers with the Quality according to user requirements.
Hotel website cost and effort of the resource are tracking and measure the
performance project according to the current situation.
During the project development, a number of issued arise that need solved the
cost and effort. So project manager monitors the project and measures the
performance of the change.
Project Closure
Project Manager selected the team for the website design. The organization the training
session for the staffs that help in the designed the project. After the completed the
website designed, Project Manager prepares a final report with the final project budget
and project summary (Taknopoint, 2017).
22
and GUI) will be met according to given budget and schedule
Hotel website delivers with the Quality according to user requirements.
Hotel website cost and effort of the resource are tracking and measure the
performance project according to the current situation.
During the project development, a number of issued arise that need solved the
cost and effort. So project manager monitors the project and measures the
performance of the change.
Project Closure
Project Manager selected the team for the website design. The organization the training
session for the staffs that help in the designed the project. After the completed the
website designed, Project Manager prepares a final report with the final project budget
and project summary (Taknopoint, 2017).
22
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

2.2 Undertook the proposed project in accordance with the agreed
specification
We have designed payment system, chatbot, Login process, and enhanced the Website
GUI for the Exmouth view hotel website. All these implementations need some term and
condition which are following
It needs an Effective Security on the online payment and login process.
Website designed for the WordPress.
It needs a database for storing the information of customer and payment.
It needs a network server to communication for the customer.
It needs clean and SEO friendly code (Rand, 2014).
Implementation the requirements:
Project Manager implemented the user requirements following ways:
For the website security, there is Implemented the SSL certificates which given
the security form Browser-based threats. Authentication and authorized process
applied to the login process and online payment.
Payment Gateway implemented for the secure online payment system.
Developer installed the WordPress CMS for designed responsive and clean
website. It provides the SEO friendly code.
Database developer designed the database on the MySQL. It is a secure and
easy understanding database.
It implemented NLSP Approach for design the chatbot (Cousins, 2018).
Systematic Recording
23
specification
We have designed payment system, chatbot, Login process, and enhanced the Website
GUI for the Exmouth view hotel website. All these implementations need some term and
condition which are following
It needs an Effective Security on the online payment and login process.
Website designed for the WordPress.
It needs a database for storing the information of customer and payment.
It needs a network server to communication for the customer.
It needs clean and SEO friendly code (Rand, 2014).
Implementation the requirements:
Project Manager implemented the user requirements following ways:
For the website security, there is Implemented the SSL certificates which given
the security form Browser-based threats. Authentication and authorized process
applied to the login process and online payment.
Payment Gateway implemented for the secure online payment system.
Developer installed the WordPress CMS for designed responsive and clean
website. It provides the SEO friendly code.
Database developer designed the database on the MySQL. It is a secure and
easy understanding database.
It implemented NLSP Approach for design the chatbot (Cousins, 2018).
Systematic Recording
23

Figure 6: Systematic Recording of web design project
Communication Management
Implement the website design project, project manager break down the task, define the
team member role (HR manager, software engineer, Hardware Engineer, Tester
Engineer, and database developer), define each task due date and also defined the
Dependencies task and team member. Project Manager takes the meeting on the
scheduled date which solved the issue of team member and website (McDaniel, 2015).
Time Management
Project Manager set the short and long-term goals for the website designed. He is also
analysed waste of time. The website will be designed in 7 -8 weeks. It used the 8
phase of the website designed.
24
Input Planning
cost
Resource
Requirments
Output Payment system
Login process
chatbot
GUI of website
Outcomes
desigin the online
payment process
design the login
scoress
virtulal
communiction
system designed
Imformataic GUI
Impact user can pay online
user can the login
on the website
user get
information virtual
way
Website design
more imformatic
and responsive
Communication Management
Implement the website design project, project manager break down the task, define the
team member role (HR manager, software engineer, Hardware Engineer, Tester
Engineer, and database developer), define each task due date and also defined the
Dependencies task and team member. Project Manager takes the meeting on the
scheduled date which solved the issue of team member and website (McDaniel, 2015).
Time Management
Project Manager set the short and long-term goals for the website designed. He is also
analysed waste of time. The website will be designed in 7 -8 weeks. It used the 8
phase of the website designed.
24
Input Planning
cost
Resource
Requirments
Output Payment system
Login process
chatbot
GUI of website
Outcomes
desigin the online
payment process
design the login
scoress
virtulal
communiction
system designed
Imformataic GUI
Impact user can pay online
user can the login
on the website
user get
information virtual
way
Website design
more imformatic
and responsive

2.3 Organised, analysed and interpreted relevant outcomes
Here, we have explained the relevant outcomes and also analysed these outcomes of
the hotel website project.
Log Book:
We have designed a log book for the hotel website project. The logbook is a collection
of activities that occurred in the project at specific times (Rebbeck, 2015).
Task Week
1
Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8
Start the
project
Yes
Design the
plan and
collected the
data and set
the project
goals
Yes
Define the
Requirement of
website design
Yes Yes Yes Yes Yes Yes Yes Yes
Developed the
set up for the
website
Yes Yes Yes
25
Here, we have explained the relevant outcomes and also analysed these outcomes of
the hotel website project.
Log Book:
We have designed a log book for the hotel website project. The logbook is a collection
of activities that occurred in the project at specific times (Rebbeck, 2015).
Task Week
1
Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8
Start the
project
Yes
Design the
plan and
collected the
data and set
the project
goals
Yes
Define the
Requirement of
website design
Yes Yes Yes Yes Yes Yes Yes Yes
Developed the
set up for the
website
Yes Yes Yes
25
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Design the
website
Yes Yes
Performed the
testing on the
website
Yes
Implementation Yes
Maintenance of
the website
Yes Yes Yes Yes Yes Yes Yes
Special Function:
Here, we have defined the function and their work which implemented on the current
hotel website.
S.NO Special Function Working on the Special Function
1 Online payment system It provides the online system on the website.
The user can pay the payment through PayPal,
master card, Visa, and net banking.
2 Login Process A login process implemented on the website.
The user can create their account on the
website.
3 Chatbot system Chatbot system provides the virtual
communication with hotel customers.
4 GUI of the database Design the Navigation bar for the link of the
page, inserted the image which gives more
26
website
Yes Yes
Performed the
testing on the
website
Yes
Implementation Yes
Maintenance of
the website
Yes Yes Yes Yes Yes Yes Yes
Special Function:
Here, we have defined the function and their work which implemented on the current
hotel website.
S.NO Special Function Working on the Special Function
1 Online payment system It provides the online system on the website.
The user can pay the payment through PayPal,
master card, Visa, and net banking.
2 Login Process A login process implemented on the website.
The user can create their account on the
website.
3 Chatbot system Chatbot system provides the virtual
communication with hotel customers.
4 GUI of the database Design the Navigation bar for the link of the
page, inserted the image which gives more
26

information about the hotel service and
product.
5 Database design The database is designed to store the
information related the customer.
Feedback questionnaires:
User 1
S.No. Question User 1
1. Do you Navigate on the website page? Yes
2. Can u recover the password on the website login
process?
No
3. Can you communicate with the hotel? Yes but need
improvement
S.No. Question User 2
1. Is the user get the proper information from the
website or their image?
Yes
2. Can you communicate with the hotel? Yes
3. How the website payment system? Good
27
product.
5 Database design The database is designed to store the
information related the customer.
Feedback questionnaires:
User 1
S.No. Question User 1
1. Do you Navigate on the website page? Yes
2. Can u recover the password on the website login
process?
No
3. Can you communicate with the hotel? Yes but need
improvement
S.No. Question User 2
1. Is the user get the proper information from the
website or their image?
Yes
2. Can you communicate with the hotel? Yes
3. How the website payment system? Good
27

S.No. Question User 3
1. Can u recover the password on the website login
process?
No
2. Did Website give the relevant information about the
hotel service and product?
Yes
3. Is the payment system for website secure? Yes
Stakeholder 1
S.No. Question Stakeholder 1
1. Is the need for improved in the database? No
2. Is the website given the useful information? Yes
3. Is the payment system for website secure? Yes
Stakeholder 2
S.No. Question Stakeholder 1
1. Can u recovered the password on the website login
process
No
2. Did Website give the relevant information about the
hotel service and product?
Yes
28
1. Can u recover the password on the website login
process?
No
2. Did Website give the relevant information about the
hotel service and product?
Yes
3. Is the payment system for website secure? Yes
Stakeholder 1
S.No. Question Stakeholder 1
1. Is the need for improved in the database? No
2. Is the website given the useful information? Yes
3. Is the payment system for website secure? Yes
Stakeholder 2
S.No. Question Stakeholder 1
1. Can u recovered the password on the website login
process
No
2. Did Website give the relevant information about the
hotel service and product?
Yes
28
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

3. Can user communication with the hotel and get the
information?
Yes
29
information?
Yes
29

LO3 Be able to evaluate the project outcomes
3.1 Use of appropriate project evaluation techniques
Here, we have explained the project evaluation techniques pert analysis and SDLC
cycle for the performed the website outcomes performance.
PERT Analysis
PERT Analysis Technique used as scheduling method in the hotel website project. It
designed the plan, explained the task and activities for the project management of hotel
website, and decided the criteria for the budget and time. PERT Analysis defined the
relationship between task time and task cost and try to complete the project given time
and cost.
Figure 7: PERT Analysis
Source: (Referenceforbusiness, n.d.)
30
3.1 Use of appropriate project evaluation techniques
Here, we have explained the project evaluation techniques pert analysis and SDLC
cycle for the performed the website outcomes performance.
PERT Analysis
PERT Analysis Technique used as scheduling method in the hotel website project. It
designed the plan, explained the task and activities for the project management of hotel
website, and decided the criteria for the budget and time. PERT Analysis defined the
relationship between task time and task cost and try to complete the project given time
and cost.
Figure 7: PERT Analysis
Source: (Referenceforbusiness, n.d.)
30

In the hotel website project, PERT work as integrated project management system that
manages the complexities during the project development phase. It worked on website
designed effort, and deadlines of the project.
PERT analysis is used in the website designed project to calculate the estimated
budget. The estimated budget calculation needs three parameters such as optimistic
time estimate, pessimistic estimate, and the normal or realistic time estimate. For the
hotel website, PERT Network works on the critical path and slack time (Inc, n.d.).
System life cycle
SDLC referred Software Development Life Cycle or system Development Life Cycle.
We have used the SDLC cycle for the web design. Website SDLC is a process to
design the hotel website with high quality and low budget with given timing. It included
the complete plan for how to design the website, it's maintained, alter and replacement.
Hotel website SDLC also explained stakeholders, employees, Developer, programmer,
web experts, their strengths and weaknesses (Stackify, 2017).
Figure 8: Software Development Lifecycle
Source: (Jenna, 2010)
31
manages the complexities during the project development phase. It worked on website
designed effort, and deadlines of the project.
PERT analysis is used in the website designed project to calculate the estimated
budget. The estimated budget calculation needs three parameters such as optimistic
time estimate, pessimistic estimate, and the normal or realistic time estimate. For the
hotel website, PERT Network works on the critical path and slack time (Inc, n.d.).
System life cycle
SDLC referred Software Development Life Cycle or system Development Life Cycle.
We have used the SDLC cycle for the web design. Website SDLC is a process to
design the hotel website with high quality and low budget with given timing. It included
the complete plan for how to design the website, it's maintained, alter and replacement.
Hotel website SDLC also explained stakeholders, employees, Developer, programmer,
web experts, their strengths and weaknesses (Stackify, 2017).
Figure 8: Software Development Lifecycle
Source: (Jenna, 2010)
31
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

SDLC stages: Here, we have defined the SDLC stages which need for the website
design.
Identify the current problems: Hotel website has not payment system and login
process. The website has lack of image and images give less information. Hotel
website GUI is not proper. Hotel customer cannot communicate with hotel direct
way.
Plan: We have made a plan for the solved these problems on the website. The
resource, cost, software and team are selected for the hotel website design. Risk
analysis is also performed to measure the Risk which occurred during the
website design.
Design: Hotel website designs according to the Design Specification phase of
the SDLC cycle. We have collected the feedback and recommendations form the
stakeholders, user, hotel staff and customer. Cost and time waste if this phase
project Failure will occur (Jenna, 2010).
Build Hotel website designs according to plan and requirements. We have
installed the WordPress and designed the database for the website. After the
WordPress installation, website payment system and login system are designed.
Website GUI make responsive and design proper linking between the pages.
Chatbot system designed on the website for the customer communication
(French, n.d.).
Test: After the design the website tests. We have fixed some issues until website
meets the original requirements.
Deploy: After the testing, the website gives the hotel. They checked the website
and given positive and negative feedback. More Adjustments make in the
website according to t user feedback (French, n.d.).
Maintain: There are maintained and update the website according to future
requirement. Maintain of website need for the hotel success. In the future,
website updates latest software and technology.
32
design.
Identify the current problems: Hotel website has not payment system and login
process. The website has lack of image and images give less information. Hotel
website GUI is not proper. Hotel customer cannot communicate with hotel direct
way.
Plan: We have made a plan for the solved these problems on the website. The
resource, cost, software and team are selected for the hotel website design. Risk
analysis is also performed to measure the Risk which occurred during the
website design.
Design: Hotel website designs according to the Design Specification phase of
the SDLC cycle. We have collected the feedback and recommendations form the
stakeholders, user, hotel staff and customer. Cost and time waste if this phase
project Failure will occur (Jenna, 2010).
Build Hotel website designs according to plan and requirements. We have
installed the WordPress and designed the database for the website. After the
WordPress installation, website payment system and login system are designed.
Website GUI make responsive and design proper linking between the pages.
Chatbot system designed on the website for the customer communication
(French, n.d.).
Test: After the design the website tests. We have fixed some issues until website
meets the original requirements.
Deploy: After the testing, the website gives the hotel. They checked the website
and given positive and negative feedback. More Adjustments make in the
website according to t user feedback (French, n.d.).
Maintain: There are maintained and update the website according to future
requirement. Maintain of website need for the hotel success. In the future,
website updates latest software and technology.
32

3.2 How you interpreted and analysed the results in terms of the original
project specification
Resource:
Figure 9: Project specification Phase
33
project specification
Resource:
Figure 9: Project specification Phase
33

Figure 10: Ghant Chart for Project specification Phase
34
34
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

Figure 11: cost status
Figure 12: Cost Details
35
Figure 12: Cost Details
35

3.3 How you made recommendations and justified areas for further
consideration
Quality Audit:
Quality Audit is set of subjective quality criteria that are defined the guidelines for the
web industry. It checks the website page language, grammar, and punctuation (Churt,
2016).
Auditing of the website can be determined that web design achieved the scope or not. If
the website does not achieve the goal, then increase the performance of the website.
Content Assessment and Technical Assessment are the terms of website auditing that
measures the performance of the hotel website (Systemico, 2015).
The advantage of the Quality Audit:
Here, we have defined three advantage of the Quality Audit for the marketing
perspective.
Improving Performance: Quality Audit improved the website performance of
content and technical infrastructure and framework. It defined the website as
browser friendly, Navigation of website page and relevant the content.
Enhancing SEO: Quality Audit is identifying the website SEO opportunities and
executed on the hotel website. It focuses on the user and search engines efforts
which make hotel website user-friendly. For the hotel website safeguard, we
have changed in the search ranking algorithms that show the searching result in
top SERPs (search engine results pages).
Improving Conversion: website audits lead the website in conversion that
identifies visitors and converted into CTAs. CTA optimize as boost conversions
(Systemico, 2015).
36
consideration
Quality Audit:
Quality Audit is set of subjective quality criteria that are defined the guidelines for the
web industry. It checks the website page language, grammar, and punctuation (Churt,
2016).
Auditing of the website can be determined that web design achieved the scope or not. If
the website does not achieve the goal, then increase the performance of the website.
Content Assessment and Technical Assessment are the terms of website auditing that
measures the performance of the hotel website (Systemico, 2015).
The advantage of the Quality Audit:
Here, we have defined three advantage of the Quality Audit for the marketing
perspective.
Improving Performance: Quality Audit improved the website performance of
content and technical infrastructure and framework. It defined the website as
browser friendly, Navigation of website page and relevant the content.
Enhancing SEO: Quality Audit is identifying the website SEO opportunities and
executed on the hotel website. It focuses on the user and search engines efforts
which make hotel website user-friendly. For the hotel website safeguard, we
have changed in the search ranking algorithms that show the searching result in
top SERPs (search engine results pages).
Improving Conversion: website audits lead the website in conversion that
identifies visitors and converted into CTAs. CTA optimize as boost conversions
(Systemico, 2015).
36

GAP Analysis:
Website GAP Analysis is a formal study of the hotel website that explained what thing
website currently doing, and what thing will improve for the future work in the website of
the hotel? GAP Analysis identifies improvement, deficiencies, and shortcomings that will
be needed for the future improvement (2020projectmanagement, 2013).
Exmouth view hotel website GAP Analysis
Date of website GAP Analysis: 1 March 2018
Project Name: Exmouth view hotel website Project ID: 234752
Objective: Implemented the online payment system, login process, chatbot system
and GUI of the website.
Description
of Target
project
Resource
Requirements
Current
available
Resource
for the
hotel
website
GAP Recognize Actions to
Address
GAPS or
Next Steps
Timeline
Skills web page
production
in
HTML/CSS
The low-quality graphic is used
on the website
Used the
graphic
design for
the image
quality
1 weeks
Tool Google
Chrome,
and Internet
Explorer
Browser compatibility issue Used the
browser
plugin make
website
2 weeks
37
Website GAP Analysis is a formal study of the hotel website that explained what thing
website currently doing, and what thing will improve for the future work in the website of
the hotel? GAP Analysis identifies improvement, deficiencies, and shortcomings that will
be needed for the future improvement (2020projectmanagement, 2013).
Exmouth view hotel website GAP Analysis
Date of website GAP Analysis: 1 March 2018
Project Name: Exmouth view hotel website Project ID: 234752
Objective: Implemented the online payment system, login process, chatbot system
and GUI of the website.
Description
of Target
project
Resource
Requirements
Current
available
Resource
for the
hotel
website
GAP Recognize Actions to
Address
GAPS or
Next Steps
Timeline
Skills web page
production
in
HTML/CSS
The low-quality graphic is used
on the website
Used the
graphic
design for
the image
quality
1 weeks
Tool Google
Chrome,
and Internet
Explorer
Browser compatibility issue Used the
browser
plugin make
website
2 weeks
37
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

browser
support
browser
compatibility
software HTML,
CSS, PHP
Not linking the page, Worst
GUI, less of image
Used the
Navigation
bar, insert
the more
image with
information
2 – 3 weeks
Alliance It is a
responsive
website.
Not SEO friendly does not
support the social media
Designed
the SEO
friendly
coding and
linked the
social media
such as
Facebook,
whatup etc.
3 weeks
Process It provides
the offered
to the
customer.
The website has not process
on the online payment system,
login process, and chatbot.
Implemented
the online
system,
login system
and chatbot.
2 weeks
38
support
browser
compatibility
software HTML,
CSS, PHP
Not linking the page, Worst
GUI, less of image
Used the
Navigation
bar, insert
the more
image with
information
2 – 3 weeks
Alliance It is a
responsive
website.
Not SEO friendly does not
support the social media
Designed
the SEO
friendly
coding and
linked the
social media
such as
Facebook,
whatup etc.
3 weeks
Process It provides
the offered
to the
customer.
The website has not process
on the online payment system,
login process, and chatbot.
Implemented
the online
system,
login system
and chatbot.
2 weeks
38

Practice Current
website
design on
HTML,
CSS, and
PHP
The web designer has no
knowledge of the WordPress,
and dream viewer.
Website
implement
on
WordPress
4
weeks(Ryan,
2016)
39
website
design on
HTML,
CSS, and
PHP
The web designer has no
knowledge of the WordPress,
and dream viewer.
Website
implement
on
WordPress
4
weeks(Ryan,
2016)
39

LO4 Be able to present project outcomes
4.1 Produce a record of all project procedures used
Here we have defined the project phase cycle for the project procedures.
Project Phase:
Website project phase is explained communication plan, public relations plan, creative
brief, and new product. Web designed include following steps for project phase:
Figure 13: Project Phase
Source: (Petramayerconsulting, n.d.)
40
4.1 Produce a record of all project procedures used
Here we have defined the project phase cycle for the project procedures.
Project Phase:
Website project phase is explained communication plan, public relations plan, creative
brief, and new product. Web designed include following steps for project phase:
Figure 13: Project Phase
Source: (Petramayerconsulting, n.d.)
40
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

Requirements Phase:
Hotel website related information is collected. This information help designed purpose,
scope, Target Audience, and Content. The payment system, login process, and chatbot
are designed for the website that improved the web GUI and helps enchanted the hotel
business. Hotel targets 15 – 70 years old Audience.
Proposal Phase:
Proposal phase developed a sitemap for the hotel website. There are designed a
navigational system for developing a consistent in the website, and user interface. Web
designer also selected CMS (content management system) as WordPress and decided
the technologies that should be implemented on the hotel website.
Project Assignment:
There are designed the plan for the website budget and timing of completion. It also
decided the maintenance plan for the website. Project Manager selected the team for
the project (Petramayerconsulting, n.d.).
Project:
In this phase, Hotel website is designed, developed and tested. For the website GUI,
web designer designed the navigation bar (help to linked the website pages), insert
image (give the information about hotel service and product), login system design (user
login and access the website secure way) chatbot design (for the communication
between user and hotel) and payment system (online payment). The web designer will
be selected the CMS as Wordpress and used the NSPL approach for the chatbot
design. Authorization and Authentication protocol is used to implement the payment
system. After the implementation user requirements, Tester tests the hotel website.
Tester tests the website on the FTP, W3 validation, and also test Authorization and
Authentication of the system.
41
Hotel website related information is collected. This information help designed purpose,
scope, Target Audience, and Content. The payment system, login process, and chatbot
are designed for the website that improved the web GUI and helps enchanted the hotel
business. Hotel targets 15 – 70 years old Audience.
Proposal Phase:
Proposal phase developed a sitemap for the hotel website. There are designed a
navigational system for developing a consistent in the website, and user interface. Web
designer also selected CMS (content management system) as WordPress and decided
the technologies that should be implemented on the hotel website.
Project Assignment:
There are designed the plan for the website budget and timing of completion. It also
decided the maintenance plan for the website. Project Manager selected the team for
the project (Petramayerconsulting, n.d.).
Project:
In this phase, Hotel website is designed, developed and tested. For the website GUI,
web designer designed the navigation bar (help to linked the website pages), insert
image (give the information about hotel service and product), login system design (user
login and access the website secure way) chatbot design (for the communication
between user and hotel) and payment system (online payment). The web designer will
be selected the CMS as Wordpress and used the NSPL approach for the chatbot
design. Authorization and Authentication protocol is used to implement the payment
system. After the implementation user requirements, Tester tests the hotel website.
Tester tests the website on the FTP, W3 validation, and also test Authorization and
Authentication of the system.
41

Launch:
In this phase, website Launch on servers for the customer. The customer used the
website and gave the feedback the after the implementation the website. It is the last
phase of the project. The website is ready for the use of customers (Bow, 2008).
Resource Allocation:
Figure 14: Resource allocation for the project
42
In this phase, website Launch on servers for the customer. The customer used the
website and gave the feedback the after the implementation the website. It is the last
phase of the project. The website is ready for the use of customers (Bow, 2008).
Resource Allocation:
Figure 14: Resource allocation for the project
42

Figure 15: Ghant chat for the resource allocation
43
43
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Figure 16: Cost flow the project
44
44

4.2 Used an agreed format and appropriate media to present the
outcomes of the project to an audience.
Here, we have explained the implemented website with the target audience rating,
special function, and project evaluation.
Website functionality Rating:
After the implementation of the website, hotel website takes a survey on the new
website. Target audience gives the rating the website according to their implemented
functionality. According to the rating, website functionality successful implemented.
Target audience gives a rating for the payment system (4 rating), Login system (4.3
rating), Chatbot (3.7 rating), website GUI (4,5 rating) and database of the website (4.6
rating).
Online payment
system login system chat bot Website GUI Database of
website
0
0.5
1
1.5
2
2.5
3
3.5
4
4.5
5
Rating
Rating
Figure 17: Website functionality rating
Specification of the website
45
outcomes of the project to an audience.
Here, we have explained the implemented website with the target audience rating,
special function, and project evaluation.
Website functionality Rating:
After the implementation of the website, hotel website takes a survey on the new
website. Target audience gives the rating the website according to their implemented
functionality. According to the rating, website functionality successful implemented.
Target audience gives a rating for the payment system (4 rating), Login system (4.3
rating), Chatbot (3.7 rating), website GUI (4,5 rating) and database of the website (4.6
rating).
Online payment
system login system chat bot Website GUI Database of
website
0
0.5
1
1.5
2
2.5
3
3.5
4
4.5
5
Rating
Rating
Figure 17: Website functionality rating
Specification of the website
45

Here, we explained the specification of the website that implemented on the current
system.
S.NO Specification Working
1 Chatbot system Chatbot system provides the virtual
communication with hotel customers.
2 Online payment system It provides the online system on the website.
The user can pay the payment through PayPal,
master card, Visa, and net banking.
3 Database design The database is designed to store the
information related the customer.
4 Login Process A login process implemented on the website.
The user can create their account on the
website.
5 GUI of the database Design the Navigation bar for the link of the
page, inserted the image which gives more
information about the hotel service and
product.
Project Evaluation:
Project evaluation is an assessment that explained the completed or running project in
the objective and systematic manner. Hotel website project evaluation aim has
explained the objectives, efficiency, development effectiveness, sustainability and
impact of the project (Ilo, n.d.).
46
system.
S.NO Specification Working
1 Chatbot system Chatbot system provides the virtual
communication with hotel customers.
2 Online payment system It provides the online system on the website.
The user can pay the payment through PayPal,
master card, Visa, and net banking.
3 Database design The database is designed to store the
information related the customer.
4 Login Process A login process implemented on the website.
The user can create their account on the
website.
5 GUI of the database Design the Navigation bar for the link of the
page, inserted the image which gives more
information about the hotel service and
product.
Project Evaluation:
Project evaluation is an assessment that explained the completed or running project in
the objective and systematic manner. Hotel website project evaluation aim has
explained the objectives, efficiency, development effectiveness, sustainability and
impact of the project (Ilo, n.d.).
46
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

Stakeholder Document
Name
Document
Format
Contact
person
Due time
Project
Manager
File, email Hard copy Jack 8 weeks
HR Manager Email Soft copy RUBY 4 weeks
Software
Engineer
Email Soft copy LEO 3 weeks
Hardware
Engineer
File Hard copy Harry 1 weeks
Tester
Engineer
Email Soft copy EMILY 1 weeks
Database
Engineer
Email Soft copy SARA 1 weeks
Pert Analysis:
47
Name
Document
Format
Contact
person
Due time
Project
Manager
File, email Hard copy Jack 8 weeks
HR Manager Email Soft copy RUBY 4 weeks
Software
Engineer
Email Soft copy LEO 3 weeks
Hardware
Engineer
File Hard copy Harry 1 weeks
Tester
Engineer
Email Soft copy EMILY 1 weeks
Database
Engineer
Email Soft copy SARA 1 weeks
Pert Analysis:
47

Figure 18: Pert Analysis
48
48

Conclusion:
Here, we have designed the hotel website project for the Exmouth view hotel. Hotel
website designed on HTML, CSS, and PHP language currently. The new website has
implemented on the WordPress. The new website contained online payment, login
process, chat bot system, Database development, and GUI of the website which
enhanced the business success.
In the report, we have explained two type of specification for the current website
according to user and stakeholder feedback and selected the first specification for the
website design. Then we have described the project plan for the current website. In the
next section, I have explained the project life cycle for the website and defined the
systemic recording, time management and cost management. Future we have also
explained log book, special function (implemented on the current website). In the third
section, we have defined the SDLC, Pert Analysis, and Gap Analysis to measure
website performance. In the end, we have explained project phase, project evaluation
and target audiences rating.
49
Here, we have designed the hotel website project for the Exmouth view hotel. Hotel
website designed on HTML, CSS, and PHP language currently. The new website has
implemented on the WordPress. The new website contained online payment, login
process, chat bot system, Database development, and GUI of the website which
enhanced the business success.
In the report, we have explained two type of specification for the current website
according to user and stakeholder feedback and selected the first specification for the
website design. Then we have described the project plan for the current website. In the
next section, I have explained the project life cycle for the website and defined the
systemic recording, time management and cost management. Future we have also
explained log book, special function (implemented on the current website). In the third
section, we have defined the SDLC, Pert Analysis, and Gap Analysis to measure
website performance. In the end, we have explained project phase, project evaluation
and target audiences rating.
49
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

References
2020projectmanagement. (2013). How gap analysis adds value to your business
Project Management. [online] Available at:
http://2020projectmanagement.com/2013/05/how-gap-analysis-adds-value-to-
your-business/ [Accessed 16 Mar. 2018].
Bow, S. (2008). How to Launch a Website - Project Phase. [online]
Petramayerconsulting. Available at: https://petramayerconsulting.com/how-to-
launch-a-website-the-launch-phase/ [Accessed 16 Mar. 2018].
Churt, R. (2016). How to Audit Your Website for Improved SEO and
Conversions. [online] Blog. Available at:
https://blog.hubspot.com/blog/tabid/6307/bid/34088/how-to-audit-your-website-
for-improved-seo-and-conversions.aspx [Accessed 16 Mar. 2018].
Content Strategy Inc. (2017). How to audit for content quality. [online] Available
at: http://www.contentstrategyinc.com/how-to-audit-for-content-quality/ [Accessed
16 Mar. 2018].
Cousins, C. (2018). 10 Things Every Web Designer Should Be Able to Do in
Their Sleep. [online] Designshack. Available at:
https://designshack.net/articles/business-articles/10-things-every-web-designer-
should-be-able-to-do-in-their-sleep/ [Accessed 16 Mar. 2018].
Dogulin Digital. (2016). 13 Advantages of Having a Website For Your Business.
[online] Available at: https://www.dogulindigital.com.au/advantages-benefits-
website-for-business/ [Accessed 16 Mar. 2018].
Esposito, E. (2015). Demystifying the 5 Phases of Project Management. [online]
Smartsheet. Available at: https://www.smartsheet.com/blog/demystifying-5-
phases-project-management [Accessed 16 Mar. 2018].
French, A. (n.d.). Web Development Life Cycle: A New Methodology for
developing Web Applications. [online] Icommercecentral. Available at:
http://www.icommercecentral.com/open-access/web-development-life-cycle-a-
new-methodology-for-developing-web-applications.php?aid=38244 [Accessed 16
Mar. 2018].
50
2020projectmanagement. (2013). How gap analysis adds value to your business
Project Management. [online] Available at:
http://2020projectmanagement.com/2013/05/how-gap-analysis-adds-value-to-
your-business/ [Accessed 16 Mar. 2018].
Bow, S. (2008). How to Launch a Website - Project Phase. [online]
Petramayerconsulting. Available at: https://petramayerconsulting.com/how-to-
launch-a-website-the-launch-phase/ [Accessed 16 Mar. 2018].
Churt, R. (2016). How to Audit Your Website for Improved SEO and
Conversions. [online] Blog. Available at:
https://blog.hubspot.com/blog/tabid/6307/bid/34088/how-to-audit-your-website-
for-improved-seo-and-conversions.aspx [Accessed 16 Mar. 2018].
Content Strategy Inc. (2017). How to audit for content quality. [online] Available
at: http://www.contentstrategyinc.com/how-to-audit-for-content-quality/ [Accessed
16 Mar. 2018].
Cousins, C. (2018). 10 Things Every Web Designer Should Be Able to Do in
Their Sleep. [online] Designshack. Available at:
https://designshack.net/articles/business-articles/10-things-every-web-designer-
should-be-able-to-do-in-their-sleep/ [Accessed 16 Mar. 2018].
Dogulin Digital. (2016). 13 Advantages of Having a Website For Your Business.
[online] Available at: https://www.dogulindigital.com.au/advantages-benefits-
website-for-business/ [Accessed 16 Mar. 2018].
Esposito, E. (2015). Demystifying the 5 Phases of Project Management. [online]
Smartsheet. Available at: https://www.smartsheet.com/blog/demystifying-5-
phases-project-management [Accessed 16 Mar. 2018].
French, A. (n.d.). Web Development Life Cycle: A New Methodology for
developing Web Applications. [online] Icommercecentral. Available at:
http://www.icommercecentral.com/open-access/web-development-life-cycle-a-
new-methodology-for-developing-web-applications.php?aid=38244 [Accessed 16
Mar. 2018].
50

Gardner, M. (2009). Why It Looks Like That: Constraints in Web Design - Hop
Studios. [online] Hop Studios: Web Design and ExpressionEngine Development
Consulting. Available at:
https://www.hopstudios.com/blog/why_it_looks_like_that_constraints_in_web_de
sign [Accessed 16 Mar. 2018].
Ilo. (n.d.). [online] Available at: http://www.ilo.org/wcmsp5/groups/public/---
dgreports/---exrel/documents/genericdocument/wcms_172679.pdf [Accessed 16
Mar. 2018].
Inc. (n.d.). Program Evaluation and Review Technique (PERT). [online] Available
at: https://www.inc.com/encyclopedia/program-evaluation-and-review-technique-
pert.html [Accessed 16 Mar. 2018].
jenna (2010). 7 Phases of Web Development Life Cycle. [online] Web-site-
development-solutions. Available at: http://web-site-development-
solutions.blogspot.in/2010/10/7-phases-of-web-development-life-cycle.html
[Accessed 16 Mar. 2018].
McDaniel, D. (2015). Make It Work: 4 Web Development Project Management
Tips. [online] Pantheon. Available at: https://pantheon.io/blog/make-it-work-4-
web-development-project-management-tips [Accessed 16 Mar. 2018].
McInnis, G. (2015). Web project risks: 6 you may have missed. [online]
Nonlinearcreations. Available at: http://www.nonlinearcreations.com/Digital/how-
we-think/articles/2015/04/Web-project-risks.aspx [Accessed 16 Mar. 2018].
O'Byrne, A. (2018). How to write a website specification. [online] We Make
Websites. Available at: https://wemakewebsites.com/blog/how-to-write-a-
website-specification [Accessed 16 Mar. 2018].
Petramayerconsulting. (n.d.). How to Launch a Website - Project Phase. [online]
Available at: https://petramayerconsulting.com/how-to-launch-a-website-the-
launch-phase/ [Accessed 16 Mar. 2018].
Rand, S. (2014). 24 Things to Consider When Designing and Developing a
Website. [online] Social Media Today. Available at:
https://www.socialmediatoday.com/content/24-things-consider-when-designing-
and-developing-website [Accessed 16 Mar. 2018].
51
Studios. [online] Hop Studios: Web Design and ExpressionEngine Development
Consulting. Available at:
https://www.hopstudios.com/blog/why_it_looks_like_that_constraints_in_web_de
sign [Accessed 16 Mar. 2018].
Ilo. (n.d.). [online] Available at: http://www.ilo.org/wcmsp5/groups/public/---
dgreports/---exrel/documents/genericdocument/wcms_172679.pdf [Accessed 16
Mar. 2018].
Inc. (n.d.). Program Evaluation and Review Technique (PERT). [online] Available
at: https://www.inc.com/encyclopedia/program-evaluation-and-review-technique-
pert.html [Accessed 16 Mar. 2018].
jenna (2010). 7 Phases of Web Development Life Cycle. [online] Web-site-
development-solutions. Available at: http://web-site-development-
solutions.blogspot.in/2010/10/7-phases-of-web-development-life-cycle.html
[Accessed 16 Mar. 2018].
McDaniel, D. (2015). Make It Work: 4 Web Development Project Management
Tips. [online] Pantheon. Available at: https://pantheon.io/blog/make-it-work-4-
web-development-project-management-tips [Accessed 16 Mar. 2018].
McInnis, G. (2015). Web project risks: 6 you may have missed. [online]
Nonlinearcreations. Available at: http://www.nonlinearcreations.com/Digital/how-
we-think/articles/2015/04/Web-project-risks.aspx [Accessed 16 Mar. 2018].
O'Byrne, A. (2018). How to write a website specification. [online] We Make
Websites. Available at: https://wemakewebsites.com/blog/how-to-write-a-
website-specification [Accessed 16 Mar. 2018].
Petramayerconsulting. (n.d.). How to Launch a Website - Project Phase. [online]
Available at: https://petramayerconsulting.com/how-to-launch-a-website-the-
launch-phase/ [Accessed 16 Mar. 2018].
Rand, S. (2014). 24 Things to Consider When Designing and Developing a
Website. [online] Social Media Today. Available at:
https://www.socialmediatoday.com/content/24-things-consider-when-designing-
and-developing-website [Accessed 16 Mar. 2018].
51

Rebbeck, J. (2005). What makes a great log book. [online] Slideshare. Available
at: https://www.slideshare.net/sekuhar/what-makes-a-great-log-book [Accessed
16 Mar. 2018].
Referenceforbusiness. (n.d.). Program Evaluation and Review Technique
(PERT) - benefits. [online] Available at:
http://www.referenceforbusiness.com/encyclopedia/Per-Pro/Program-Evaluation-
and-Review-Technique-PERT.html [Accessed 16 Mar. 2018].
Ryan (2016). Competitor Analysis Templates. [online] Paperinvoices. Available
at: http://www.paperinvoices.com/analysis-templates/ [Accessed 16 Mar. 2018].
SiteMinder. (2017). 20 Tips to Attract The Business Traveller To Your Hotel -
SiteMinder. [online] Available at:
https://www.siteminder.com/r/hotel-distribution/hotel-global-distribution-system/
20-things-hoteliers-attract-corporate-guests-business-bookings/ [Accessed 16
Mar. 2018].
Stackify. (2017). What is SDLC? Understand the Software Development Life
Cycle. [online] Available at: https://stackify.com/what-is-sdlc/ [Accessed 16 Mar.
2018].
Systemico. (2015). Quality Audits. [online] Available at:
http://www.systemico.ca/quality-and-risk-management/quality-audits/ [Accessed
16 Mar. 2018].
Taknopoint. (2017). Services - Adobe AEM, Marketing Cloud, Vue JS Consulting.
[online] Available at: http://teknopoint.us/services/ [Accessed 16 Mar. 2018].
52
at: https://www.slideshare.net/sekuhar/what-makes-a-great-log-book [Accessed
16 Mar. 2018].
Referenceforbusiness. (n.d.). Program Evaluation and Review Technique
(PERT) - benefits. [online] Available at:
http://www.referenceforbusiness.com/encyclopedia/Per-Pro/Program-Evaluation-
and-Review-Technique-PERT.html [Accessed 16 Mar. 2018].
Ryan (2016). Competitor Analysis Templates. [online] Paperinvoices. Available
at: http://www.paperinvoices.com/analysis-templates/ [Accessed 16 Mar. 2018].
SiteMinder. (2017). 20 Tips to Attract The Business Traveller To Your Hotel -
SiteMinder. [online] Available at:
https://www.siteminder.com/r/hotel-distribution/hotel-global-distribution-system/
20-things-hoteliers-attract-corporate-guests-business-bookings/ [Accessed 16
Mar. 2018].
Stackify. (2017). What is SDLC? Understand the Software Development Life
Cycle. [online] Available at: https://stackify.com/what-is-sdlc/ [Accessed 16 Mar.
2018].
Systemico. (2015). Quality Audits. [online] Available at:
http://www.systemico.ca/quality-and-risk-management/quality-audits/ [Accessed
16 Mar. 2018].
Taknopoint. (2017). Services - Adobe AEM, Marketing Cloud, Vue JS Consulting.
[online] Available at: http://teknopoint.us/services/ [Accessed 16 Mar. 2018].
52
1 out of 52
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.