AI Summary
This report delves into the concept of project management, focusing on the I-Crop online cash marketplace platform. It examines the project's objectives, team dynamics, communication strategies, and learning experiences. The report highlights the importance of teamwork, effective communication, and the essential skills required for successful ICT project management. It also reflects on the challenges and lessons learned during the project implementation.

Contribute Materials

Your contribution can guide someone’s learning journey. Share your documents today.
Document Page
ITC 505 (ICT Project Management - ASSESSMENT 2 -
Teamwork and reflection)

1

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Table of Contents
Introduction
......................................................................................................................................3
Part one
............................................................................................................................................ 4
Part Two
.........................................................................................................................................12
Part Three
.......................................................................................................................................17
Part Four
........................................................................................................................................19
Conclusion
..................................................................................................................................... 20
References
......................................................................................................................................21
2
Document Page
Introduction
This report introduces to the concept of project management. This report lays attention on I-crop

project which is the online cash marketplace platform. For this project Globex entered into a

contact with. Virtucon Consultancy is responsible for successfully installing this project. Globex

cooperation is the company which offers agrarian solutions to the client who are located in the

parts of Central West regions of New South Wales and Riverine. This I- crop application will be

developed by using the innovative techniques which will result in delivering the agricultural

product. This application is new and will add value to the clients. This online platform enables

quick selling and acquisition of the warehoused grain. This platform is having the most

innovative medium. This interface is compatible with the assistance of the mobile applications.

Virtucon will assist in managing the operations of the Globex cooperation. This application

results in the success of delivering the solutions on time. The main transactions which are offered

by I-crop are offers, bids, and preferred buyers.

The Globex Corporation was founded in the year 2013, at the time of merging of two large

regional businesses B T & Sons Farming Equipment and Riverine Precision Farming. The main

motive of the company is to offer provide quality agriculture services. Due to the invention of I-

crop application the import and export services can take police anywhere and at any time.

3
Document Page
Part one
Project Description

Title of the project
: I-Crop online cash marketplace platform
Associated Branch: ICT

Community:
Stud farm
Associated company
: Globex Cooperation
Project Contract Partner
: Virtucon Consultancy
Services:
To handle the purchasing and selling of the warehoused grain and to offer other
agronomy solution

Region:
Central West regions of New South Wales and Riverina, Australia
Team Description

Details of the project team

This table will present the details of all the team members who are involved in the application of

I-crop.

Project Name:
I-Crop Project Team
A number of Team members:
5
S. no.
Name Email ID Contact number
1
Member 1
4

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
2 Member 2
3
Member 3
4
Member 4
5
Member 5
Project Overview

I-Crop online cash marketplace platform is the online marketing platform which also supports

the different mobile devices. The project I –crop is useful for managing the stud farms of

Globlex cooperation. This platform will be having an effective and efficient user interface. The

main requirement for running this application is the high speed internet connectivity throughout

the organization. This I-crop application will ease down the export and import procedures. The

distinctive features of I-crop comprise of offers, bids, and specified buyers. I-crop helps in

exploring the different opportunities which are prevailing in the current market

Project Objective

The objective of the project is to offer an online platform which will glove assistance to the

services of managing the stud farms and other agriculture services of Globex Cooperation.

There will be the transactions among buyers and growers which also consist of transfer of

ownership. The project will be having a process development and will be managed by the

Virtucon Company. Inventory the numerous offers which will be offered by the I-crop for

managing the services and products of Globex consist of Bids, offers and preferred buyers. The

solution will help in the arrangement of sales and purchase of grains.

5
Document Page
Team Charter
Skills and Knowledge

Below specified are the skills and knowledge of each team member which will be required for

completing the project:

Name of the team member
Position Skills and knowledge
Member 1
Project manager Communication skills
Member 2
Business Analyst Time management skill
Member 3
Application developer Technical skills
Member 4
Finance expert Decision making skills
Member 5
Team leader Leadership skills
Roles and Responsibilities

This table highlights the key roles and responsibilities which are played by each and every team

member for the successful completion of the project:

Name of the team member
Position Skills and knowledge
Member 1
Project manager The project manager
should guide and

manage the

6
Document Page
stakeholders.
The manager should
also focus on planning

and controlling of the

project

The manager should
focus on the project

budgets and risk

(Eskerod & Jepsen,

2016).

Member 2
Business Analyst Business analyst
should develop

effective

communication.

Business analyst
should take necessary

action as and when

required

They should keep a
check on recent

updates and important

information

(Niederman & March,

2018).

Member 3
Application developer The application
developer should

7

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
accept and try the
innovative ideas which

are given by the team

The application
develop should

discover the risk on

time

Member 4
Finance expert Financial manager
should plan out a

budget for the project

The analyst should
keep a check on the

unnecessary expenses

Financial experts
should guide and direct

the cash inflows and

outflows.

Member 5
Team leader Team leader should
focus on addressing

the needs of the team

Tem leaders should do
effective

communication

He should be
supportive and guide

8
Document Page
its team
.team leader should
solve the disputes

which are arising

among the team

members (Fangel,

2018).

Team Communication

For successful business operations, it is important to facilitate a team which enables management

to implement their plan. Team communication defines a process in which interaction used to take

place between various members of a unit (Kokemuller, 2017). Globex Cooperation wants to

expand their business with merger and for this, a proper team is required which enable and assist

in launch such plan properly. For this context and an appropriate team communication, following

are certain aspects on which business need to work so that define targets would be accomplished.

Meeting Times & Location

Before commencing any project, it is important to describe each attribute to the team. In this

context, team meeting plays an important role in which each and every team member

participating in such meeting actively. Thus, for managers of a company, it is important to take

views from team members and decide location and time. Globex Cooperation needs to take a

view from their define team members so that they can provide own view regarding a number of

location for meeting as well as time. A mutual consent is essential so that meeting leads to taking

place in define manner as well as each team member reach over there for case assignment.

Selected location for a team meeting is The Grace Hotel. The meeting incorporated in Banquet

Hall of the hotel at 11:00. Thus, all team members need to go there on time so that starting of the

case begins with a positive attribute towards each other. Moreover, on lunch, each team members

9
Document Page
become able to interact so that effective working and project implementation of Globex
Cooperation becomes possible.

Define how the team will communicate with each other and share information

Communication is an important and essential aspect which supports teams to interact with each

other. Communication also enhances the ability of the business to accomplish defined objectives.

For proper and effective working and synergy, proper team communication is important. Hence,

the following are certain ways through which Globex Cooperation can share information and

interact with each other properly and support in the success of a case assignment:

Verbal communication: One of a kind of communication which can utilize by members
of a team is verbal communication. But it needs to use at the time of emergency so that

chances of conflict and miscommunication tend to decline as well as no one will become

able to point out on others of failure. Globex Cooperation team members can use this

approach as it is time-saving and support for healthy communication (De Bruijn & Ten

Heuvelhof, 2018).

Written communication: Another method of communication is written which basically
leads to taking place in form of E-mails (Rohn, 2018). Written communication is helpful

in reducing conflict and facilitates appropriate relationship among team members. Globex

Cooperation requires using this method while delivering some important message and

needing to deliver to the whole unit. But this technique is time-consuming and enforces

to use at the time of need only.

Meeting documentation

Meeting Documentation

Project
: Merger of Globex Cooperation Time: 11:00
Date of Meeting
: 30 July 2018 Location: The Grace Hotel
Meeting Facilitator
: HR
10

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Meeting Objective: To determine the impact of the merger of Globex Cooperation
It is informed to a team member to visit The Grace Hotel on 30 July 2018. This team meeting is

important to understand the drawbacks of a project initiated by business. Please consider this

letter and come on time to avoid inconvenience.

Thanks

HR of Globex Cooperation

Team Rules and Expectations

Overall team goal

Working in team has lot to do with the communication and active participation. This is what I

learned when I was working in team. A team faces lots of problems mainly the conflict of

interest and lack of clear objectives. Such issues must be solved immediately as they will have

direct impact on the success of the project, the main goal of the team should be to reduce the

overall cost of the project. The team goals must be similar to the goals of the company. Team

goals should focus on collaborative working and active participation by all the team members

(Kerzner, 2018).

Team values

Team values are the set of conducts and rules which each team ember should abide by. Team

values are important for the smooth functioning of the team. Team which perform well will add

value to the company and results in saving not only the resource of the company but also its

11
Document Page
time. Globlex Company focuses on having a team which is filling of confidence. The team vales
must run in parallel to the goals and objective of the company. An effective and efficient team

focus on doing panning and developing visions so that the I-crop project can be set up in a

successful manner. good team meets regularly and discus about all the variance which are

observed in the performances so that quick actions and controls can be taken.,
All the teams
which are involved in the project must strive to have recognized values which are constant with

the essential values of the business. These distinct standards can turn out to be the foundation for

team’s global success and the principal point for everyday behaviour (Heagney, 2016).

Code ethics

This project requires following all the code of ethics which will make the project more effective

and efficient. Below specified are they code of ethics which must be followed:

There must be honesty among the team embers
The confidentiality regarding the important information and documents must be managed
The team should be supportive and respect each other
Prior approvals of the senior managers must be taken
Proper participation by the team members must be ensured (Marchewka, 2014).
Roles and Expectations

The role and expectations which all the team members should abide by must consist of the

following:

The decisions among the team must be taken in a way that the opinion of each and every
team member must be considered. The decisions taken by the team must not be biased

and based on the personal interest. All the decisions must be well focused. The decisions

should not result in conflicts

There must be rules regarding the management of conflicts so that there is no disturbance
and delays in the implementation of the project. Whenever there is a conflict in the

management it must be solved immediately and should be managed in an effective and

efficient manner.

12
Document Page
The must be rules regarding the absence from meetings. Absence from meeting must be
informed before the meeting and there must be proper and honest reasons for the delays

and absence from the meeting. Conflicts can take place nay time so the company must set

up conflict management team.

There must be rules regarding the active participation and contribution by the team
members. Active participation is required for the successful completion of the project in

an effective and organized manner.

There must be rules regarding the completion of project on time. Doing the project on
time is important so that there is no delay in the project (
Martinelli & Milosevic,
2016).

Project approval and signature of the team members

Name
Signature for I-Crop Online Platform Project
Member
1
Member
2
Member
3
Member
4
Member 5

13

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Part Two
Learning cycle

A learning cycle is being defined as the concept which is in relation with how people have to

learn from the experiences. A cycle of learning will be having different sorts of phases and

stages which will be followed up in a company so as to attain set targets and goals. Learning

cycle makes provision of the structure to the team meeting and accountability when teamwork

outside of the schedule of a meeting. It is basically a process of steps which give guidance to

both instructor and learner (
Dixon, 2017). In this part also, there is the preparation of the learning
cycle for the purpose of team meeting so as to have the proper schedule.

Learning cycle of accountability and the team meeting is being presented below as:

14

Planning for online cash

marketplace and website

Designing regarding

appropriate fields for the

details of visitors

Responsive view adaptability

Design approval from

cooperation

Meeting 1
Meeting 3
Meeting 2

Testing is done on various

platforms

Generation of test case

Discussions to resolve issues

Development of conclusion on

testing

Discussion on the method of
implementation

Designing of the database using
SQL

Development of design in
coordination with the budget
Document Page
Source: (By Author)
Learning cycle is being prepared in regards to the project which is undertaken by two companies

that is Globex and Virtucon. Contact has been developed between these two regarding the

development of the new platform which will be in relation with the online cash marketplace with

the name I-Crop. In-house development of I-Crop app and website is being done by Virtucon and

will support in making delivery of the solution in an inexpensive and timely manner by fulfilling

all sorts of project requirement. This system will not replace any other system and will be

wholly new. This service will be considered as the value added service for the clients of Globex

who purchase and grow grains. It has been analysed that if buyers and growers will be brought

together on one platform, I-crop will make provision of an easy and convenient way to buy, sell

and manage warehoused grains. The developed app and website will be user-friendly and will

make use of a platform which is mobile enables so that there can be easy access regarding export

and domestic opportunities at any time (
Alexandrou, 2013).
Roles assigned prior to the meeting for the project

Prior to the next meeting which is scheduled, it is very necessary to assign different roles to the

teams. There are just two main roles which can be defined as follows:

Organiser: The main role of the organiser is to organise the meeting by making a proper
description of the ideas of the team and then make their distribution to the members of

the team so as to have feedback. The person is also responsible to plan the whole meeting

in such a manner which will support in giving effective and successful results. The

overall planning of the team must be done in front of all the members of the team who are

having a relationship with the project. Organiser makes a collection of the reviews and

ideas from the members of the team so that each and every member may give consent for

the approval of the project (
Brown & Abell, 2013). The main aim of the project is to be
economical with respect to the Globex Cooperation. The organiser also negotiates with

the members of the team to attend meeting otherwise there will be the implementation of

the penalties.

15
Document Page
Scribe: The main role of the scriber is to document the points of action and ideas in order
to move forward. In relation to the current project, scriber considers key points in regards

to the financial cost involved in the development of the online cash marketplace website

and app. All kind of documentation for the session of the meeting is being done by the

scribe. They are also having the responsibility to make final decisions so as to implement

it for the purpose of the project (
Baybutt, 2013)
Schedule of the meeting

The meeting schedule in regards to the next meeting is being described below as follows:

Title
Points of Discussion
The main aim of the meeting
To develop website and application so as to
have a platform for online cash marketplace

Staring Time
10:00 am
Members
All 11 members are present
Estimated cost
Cost for development of website and
application

Cost-related with software and
technical requirement

Cost for maintenance
Problems
The problem in the application's
interface while working on the

Smartphone

16

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Security and safety issues at the time
of login

Improper follow up of developed
design (Daugherty & Hines, 2018).

Resources
The good and fast connection of
internet

Members of the team as they are the
only one who is responsible for the

success and growth of the project.

All the necessary documents required
for the good decisions and results

Effective software and technology
(Dandage, et. al., 2018)

Decisions
An individual who is responsible to
develop applications should have

proper knowledge in regards to the

coding in each and every test.

There must be the utilisation of
compatible and user-friendly design

so that it can be used easily by the

customers.

There must be the proper
establishment of the registration and

login feature (Lehmann, 2018).

17
Document Page
Availability of the website developer
and applications of software must be

there at every point so as to make

necessary changes as per the needs of

the customers and to solve any

sudden and random issues that may

arise at the time of making

operations.

Ending Time
2:00 pm
18
Document Page
Part Three
Communication Plan

A communication plan is an important tool in the project management. It is important to develop

a communication plan which can address the needs of all the stakeholders who are involved in

the I-Crop project. I crop being an online cash marketing platform involves different types of

stakeholders. An effective communication plan comprises of mode of communication, kind of

communication, reason behind communication and the type of information to be communicated

(Doush, 2018). A communication plan is to be prepared in the set time frames so that it can

easily communicate the project to the stakeholders. It is to be noted that I crop to be planned

successfully requires attention from all the stakeholders be it from Globex cooperation or

Virtucon cooperation. The plan of communication must be drafted by the experts or leaders of

the Globex company so that an effective plan can be built. Below specified is the communication

plan which will be undertaken to communicate all the information to the stakeholders for the

successful implementation of the project.
A communication plan is vital for managing me- crop
project. Communication is a two way process and must be done in an effective and efficient

manner. The prime stakeholders of I-crop project are project manager, business

analyst,
maintenance manager etc. Each of them should take active participation and must
communicate on routine basis (Kerzner, & Kerzner, 2017).

Communication plan is important for the development of the I-crop project so that farms and

agricultural project can be managed easily. Communication plan is developed by using the

19

Stakeholder

name

Sharing

Information

Date of

sharing

informatio

n

Mode of

communica

tion

Communicatio

n Type

Place of

information

exchange

Project

Manager

Planning the

project

18

September

Gmail
Kick off
meeting

Computer Lab

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
20
Business

Analyst

Developing

market analysis

report

20

September

Gmail
Project team
meeting

Lecture hall

Website

Developer

Reporting all

the technical

documentation

on website

22

September

Hard copy
Monthly
Project status

meeting

Computer Lab

Interface

Designer

creating

interface

design report

21

September

G-mail
Project status
report

Classroom

Maintenance

Manager

Future

enhancement

report

25

September

Gmail
Project team
meeting

Computer Lab

Application

Developer

Reporting the

technical

documentation

of Application

23

September

PDF
Monthly
Project status

meeting

Classroom

Testing

Manager

Documenting a

report of test

cases

24

September

PDF and

hard copy

Monthly

Project status

meeting

Computer Lab
Document Page
Communication plan is important for the development of the I-crop project so that farms and
agricultural project can be managed easily. Communication plan is developed by using the

appropriate skills and talent by the team managers and project managers. The communication

plan is a policy driven approach of providing the stakeholders with the required information for

the development of the project. The plan formally defines who should be given specific

information, when that information must be delivered and what communication modes will be

used. The communication plan can be prepared by using the word or online tools which will

result in better planning of project (Nicholas &Steyn, 2017).

21

Financial

expert

Budget

assessment

report

27

September

hard copy
Project status
report

Lecture hall

Virtucon

consultancy

Detailing out

the project

management

techniques for

approval

29

September

PDF and

hard copy

Kick off

meeting

seminar room

Workers at

Stud Farm

stating the

agricultural

requirements

28

September

PDF
Kick off
meeting

Computer Lab

Globex

cooperation

Details of stud

farm and legal

agreements

30

September

Gmail
Kick off
meeting

Seminar room
Document Page
Part Four
Reflection

Team Experience

This project enlightened me on how to develop the project and manage it in a successful manner.

This project guided me that communication and teamwork is the most important aspect of project

management. I even acquired knowledge regarding the team values, code of ethics, rules and

regulations and various other aspects of project management. This project helps me in enhancing

my problem solving and decision making skills to guide me how to lead, manage and avoid team

conflicts. My primer aim is to successfully deliver a project to the Globex Cooperation. While

doing this project I faced several problems but with flexible thinking I am able to cope up with

each of the problem in a smooth manner.

Leadership qualities

In my opinion, Leadership qualities play an important role in the project management.

Leadership results in motivating the team and influencing them to work towards the

accomplishment of project goals and objectives. Better leadership qualities results in the timely

completion of project and also helps in leading and guiding the team in an effective and efficient

manner.

Essential techniques, skills, methods and ICT project manager

In my opinion, the important skills which the ICT project manager should have is technical

skills, communication skills, problem solving skills, leadership skills, and decision making skills

and planning skills. Each skills I important and must be possessed by the ICT manager for

completing the project in a well-organized manner. Apart from all this, the project manager must

undertake innovative methods for the successful completion of the project.

22

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Conclusion
From the above report it can be concluded that teamwork is important for managing the project

in a successful manner. Developing a communication plan is also important for the ‘I-Crop

online cash marketplace platform’ for the Globex Cooperation. Further, it is important to

understand the skills and responsibilities of each team member so that the project is executed on

time. This report also concluded that the new project is going to support the company in

managing the services of stud farms and agriculture produce together with the selling and

acquisition of warehouse grains. this new ideas on developing an online cash market platform

will improve the sales, support the buyer and grow client, enhance profits and results in strong

consumer base.

23
Document Page
References
Alexandrou, A. (Ed.). (2013). Union learning representatives: Challenges and
opportunities. Routledge.

Baybutt, P. (2013). The role of people and human factors in performing process
hazard analysis and layers of protection analysis.
Journal of Loss Prevention in the
Process Industries,
26(6), 1352-1365.
Brown, P. L., & Abell, S. K. (2013). Examining the learning cycle. Perspectives:
Research & Tips to Support Science Education, K,
6.
Dandage, R. V., Mantha, S. S., Rane, S. B., & Bhoola, V. (2018). Analysis of
interactions among barriers in project risk management.
Journal of Industrial
Engineering International
, 14(1), 153-169.
Daugherty, A., & Hines, S. S. (Eds.). (2018). Project Management in the Library
Workplace
. Emerald Group Publishing.
De Bruijn, H., & Ten Heuvelhof, E. (2018). Management in networks. Routledge.
Dixon, N. M. (2017). The organizational learning cycle: How we can learn
collectively. Routledge.

Doush, I. A. (2018). Software Project Management.
Eskerod, P., & Jepsen, A. L. (2016). Project stakeholder management. Routledge.
Fangel, M. (2018). Proactive Project Management. Van Haren.
Heagney, J. (2016). Fundamentals of project management. Amacom.
Kerzner, H. (2018). Project management best practices: Achieving global excellence.
John Wiley & Sons.

24
Document Page
Kerzner, H., & Kerzner, H. R. (2017). Project management: a systems approach to
planning, scheduling, and controlling
. John Wiley & Sons.
Kokemuller, N. (2017). What Is Team Communication? [Online] bizfluent. Available
at:
https://bizfluent.com/about-5340885-team-communication.html. [Accessed on: 28
August 2018].

Lehmann, O. F. (2018). Project Business Management. CRC Press.
Marchewka, J. T. (2014). Information technology project management. John Wiley &
Sons.

Martinelli, R. J., & Milosevic, D. Z. (2016). Project management toolbox: tools and
techniques for the practicing project manager
. John Wiley & Sons
Nicholas, J. M., & Steyn, H. (2017). Project management for engineering, business
and technology
. Routledge.
Niederman, F., Müller, B., & March, S. T. (2018). Using Process Theory for
Accumulating Project Management Knowledge.
Methodology.
Rohn, J. (2018). Different Effective Methods of Communication (Useful). [Online]
EDUCBA
. Available at: https://www.educba.com/different-methods-of-communication/.
[Accessed on: 28 August 2018].

25
1 out of 25
[object Object]

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]