The iCORP - Globex project is a collaboration between Globex Corporation and Virtucon Corporation to develop an online farm-based auction system. The system aims to automate and streamline the current manual processes, resulting in increased revenue and profits. The project scope includes collecting requirements, data processing, system analysis, testing, and training. The project budget includes costs associated with employee designation and workload. The risk analysis framework identifies potential risks and their impact on the project. Desklib provides access to solved assignments, essays, and dissertations on the iCORP - Globex project.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
iCORP – Globex project
[Student name]
[Student name]
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Contents
Project Overview.................................................................................................................................2
Project Description..............................................................................................................................2
MOV or Measurable Organizational Value......................................................................................2
Area of Impact...................................................................................................................................2
Expected Value for the Project..........................................................................................................4
Approximate Metric..........................................................................................................................4
Duration for achieving the expected MOV........................................................................................4
Measurable Organizational Value (Brief)..........................................................................................5
Project Scope........................................................................................................................................5
Scope Management Plan....................................................................................................................6
Scope of the project...........................................................................................................................6
List of Resources...............................................................................................................................7
Technologies needed for development..............................................................................................7
Facilities............................................................................................................................................7
Travel and Training needs.................................................................................................................7
High Level WBS or Workbreak Down Structure.............................................................................7
Assumptions made with respect to the budget of the project...........................................................10
Project Risk Analysis as well as Risk Plan.......................................................................................11
Assumptions....................................................................................................................................11
Risk Identification Framework........................................................................................................11
Risk Analysis...................................................................................................................................12
Quality Management Plan................................................................................................................12
Furthermore, quality verification would be done with the help of following...................................12
The system needs to be validated to ensure reliability, efficiency, performance and accuracy........13
Annotated Bibliography....................................................................................................................13
References..........................................................................................................................................14
1
Project Overview.................................................................................................................................2
Project Description..............................................................................................................................2
MOV or Measurable Organizational Value......................................................................................2
Area of Impact...................................................................................................................................2
Expected Value for the Project..........................................................................................................4
Approximate Metric..........................................................................................................................4
Duration for achieving the expected MOV........................................................................................4
Measurable Organizational Value (Brief)..........................................................................................5
Project Scope........................................................................................................................................5
Scope Management Plan....................................................................................................................6
Scope of the project...........................................................................................................................6
List of Resources...............................................................................................................................7
Technologies needed for development..............................................................................................7
Facilities............................................................................................................................................7
Travel and Training needs.................................................................................................................7
High Level WBS or Workbreak Down Structure.............................................................................7
Assumptions made with respect to the budget of the project...........................................................10
Project Risk Analysis as well as Risk Plan.......................................................................................11
Assumptions....................................................................................................................................11
Risk Identification Framework........................................................................................................11
Risk Analysis...................................................................................................................................12
Quality Management Plan................................................................................................................12
Furthermore, quality verification would be done with the help of following...................................12
The system needs to be validated to ensure reliability, efficiency, performance and accuracy........13
Annotated Bibliography....................................................................................................................13
References..........................................................................................................................................14
1
Project Overview
The given project is an arrangement between Globex Corporation and Virtucon Corporation.
Globex corporation needs to develop an online farm based auction system to converge buyers
and sellers together on platform and for the same, they have contacted Virtucon as they’ve
been their trusted developer for over several years. The newer system will be replacing the
traditional system which is at place so the various manual processes contained therein can be
handled automatically from the i-Crop platform itself. Ultimately, their collective belief is
that the project would help streamline, automate and improve the entire process resulting in
increased revenue and profits.
Project Description
Globex Corporation is into primary sector of business and makes use of manual methods for
their operations. These operations include their customers booking, auction and bidding;
managing the payment as well as buying grains etc. In order to improve their overall
efficiency, Globex decided to approach Virtucon to develop a system that would automate a
lot of these inefficient manual process. As a result, the bookings, the overall management of
the current system and the bidding and booking processes could all be automated and
streamlined. The system is also supposed to add an online payment interface which would
accept payment from multiple sources and can also work on mobile based devices. Apart
from that, the system needs to be able to generate and output reports in pre-defined formats
for the Globex corporation.
MOV or Measurable Organizational Value
Area of Impact
The core aim of the project i-Crop system is to make use of the bidding and auctioning
system accurately as well as more reliably. As the project starts performing well and
integrates well into the overall operation of business, the business processes would end up
being more optimized and faster which would help in reducing overheads while increasing
profits. The table given below denotes the MOV and discusses major areas which will have
the most effect after the system has been deployed:
Impact of the
System
Value derived from
the system
Matrices Duration
Operational impacts Overall Service 6 Months
2
The given project is an arrangement between Globex Corporation and Virtucon Corporation.
Globex corporation needs to develop an online farm based auction system to converge buyers
and sellers together on platform and for the same, they have contacted Virtucon as they’ve
been their trusted developer for over several years. The newer system will be replacing the
traditional system which is at place so the various manual processes contained therein can be
handled automatically from the i-Crop platform itself. Ultimately, their collective belief is
that the project would help streamline, automate and improve the entire process resulting in
increased revenue and profits.
Project Description
Globex Corporation is into primary sector of business and makes use of manual methods for
their operations. These operations include their customers booking, auction and bidding;
managing the payment as well as buying grains etc. In order to improve their overall
efficiency, Globex decided to approach Virtucon to develop a system that would automate a
lot of these inefficient manual process. As a result, the bookings, the overall management of
the current system and the bidding and booking processes could all be automated and
streamlined. The system is also supposed to add an online payment interface which would
accept payment from multiple sources and can also work on mobile based devices. Apart
from that, the system needs to be able to generate and output reports in pre-defined formats
for the Globex corporation.
MOV or Measurable Organizational Value
Area of Impact
The core aim of the project i-Crop system is to make use of the bidding and auctioning
system accurately as well as more reliably. As the project starts performing well and
integrates well into the overall operation of business, the business processes would end up
being more optimized and faster which would help in reducing overheads while increasing
profits. The table given below denotes the MOV and discusses major areas which will have
the most effect after the system has been deployed:
Impact of the
System
Value derived from
the system
Matrices Duration
Operational impacts Overall Service 6 Months
2
system
effectiveness
will be
increased
Reduction in
customer
complaints
and also
enquiries
Improvement
in scheduling
Increase in
grain
purchases
request would
be able to be
handled in
less than 24
hours
Customers
call would be
reduced by
over half.
Reduction in
the overall
scheduling of
orders from 5
hours to 2
hours
The system is
24x7 active
2 Months
2 Months
6 Months
Impact on Financial
aspects
Overheads
such as
Phone bills
and Labour
expenses
shall be
reduced.
Increase in
revenue
owing to
transactions
carried out
online
Reduction in
administrative
costs.
Reduction in
manpower by
over 30%
6 Months
12 Months
Impact on the
Customers of the
organization
Improved
response
time.
Increase in
Decrease of
the waiting
time by a
total of 2
12 Months
3
effectiveness
will be
increased
Reduction in
customer
complaints
and also
enquiries
Improvement
in scheduling
Increase in
grain
purchases
request would
be able to be
handled in
less than 24
hours
Customers
call would be
reduced by
over half.
Reduction in
the overall
scheduling of
orders from 5
hours to 2
hours
The system is
24x7 active
2 Months
2 Months
6 Months
Impact on Financial
aspects
Overheads
such as
Phone bills
and Labour
expenses
shall be
reduced.
Increase in
revenue
owing to
transactions
carried out
online
Reduction in
administrative
costs.
Reduction in
manpower by
over 30%
6 Months
12 Months
Impact on the
Customers of the
organization
Improved
response
time.
Increase in
Decrease of
the waiting
time by a
total of 2
12 Months
3
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
service
availability
Reduction in
the overall
queue
Secure
payment
facilities
hours.
Increase in
probability of
the given
purchasers by
40%.
Reduction in
overall
charges
attributed to
scheduling by
30%.
Social impacts of
the system
Increase in
the partners
of the
community
Increase in
overall
partners of
the
community
by over 30%
18 Months
Expected Value for the Project
Better
Globex is aiming to use the i-Crop system in order to increase their sales and thereby
increase their revenue.
Faster
Globex is also aiming to increase the overall expected response time for customers
with respect to payments and bookings that would help in increasing the
organizational growth.
Approximate Metric
Globex Corp would be having over 99% accuracy in terms of booking and the streamlined
and secure online payment system would mean that each of the bookings are closed faster.
4
availability
Reduction in
the overall
queue
Secure
payment
facilities
hours.
Increase in
probability of
the given
purchasers by
40%.
Reduction in
overall
charges
attributed to
scheduling by
30%.
Social impacts of
the system
Increase in
the partners
of the
community
Increase in
overall
partners of
the
community
by over 30%
18 Months
Expected Value for the Project
Better
Globex is aiming to use the i-Crop system in order to increase their sales and thereby
increase their revenue.
Faster
Globex is also aiming to increase the overall expected response time for customers
with respect to payments and bookings that would help in increasing the
organizational growth.
Approximate Metric
Globex Corp would be having over 99% accuracy in terms of booking and the streamlined
and secure online payment system would mean that each of the bookings are closed faster.
4
Duration for achieving the expected MOV
Once the project has been implemented, Virtucon the developer behind the system that the
MOV would ultimately be achieved within 6 months.
Measurable Organizational Value (Brief)
Globex Corporation is expected to be increasingly affected by the i-Crop system in a positive
manner. The system is to be delivered by the Virtucon Consultancy and the new system is
meant to eliminate the errors and inefficiencies of the previous system. The overall operations
would be completed in a much faster, resulting in reduced overheads, increased customers
satisfactions and revenues.
With an increase in the newer online system, Globex would able to process customer
needs faster thereby increasing the response time.
The administrators associated with Globex would be reduced.
The overall revenue that is generated at the end of the year will increase.
The local community would ultimately be benefited thereby increasing in the finance
for the organization.
The resulting increase in revenue and operational efficiency will make Globex
popular and also increasing the market presence in the process.
The newer system is also set to deliver an enhance accuracy rate.
The newer system is also set to improve the availability rate.
Project Scope
The project scope for the i-Crop system focuses on the overall boundaries framed by the
managers and the deliverables that needs to be done in order to realize the MOV listed above
(Marchewka, 2014). Scope essentially means that all of the tasks associated right from
requirement analysis to completion of the project. Following are the scope for the i-Crop
project:
Collecting requirements of the key stakeholders.
Data processing
Discussion of the rules of the business as well as the documentation.
Detailing the requirement of the system, it’s analysis as well as the evaluation thereof.
Additional design and analysis required for the system.
5
Once the project has been implemented, Virtucon the developer behind the system that the
MOV would ultimately be achieved within 6 months.
Measurable Organizational Value (Brief)
Globex Corporation is expected to be increasingly affected by the i-Crop system in a positive
manner. The system is to be delivered by the Virtucon Consultancy and the new system is
meant to eliminate the errors and inefficiencies of the previous system. The overall operations
would be completed in a much faster, resulting in reduced overheads, increased customers
satisfactions and revenues.
With an increase in the newer online system, Globex would able to process customer
needs faster thereby increasing the response time.
The administrators associated with Globex would be reduced.
The overall revenue that is generated at the end of the year will increase.
The local community would ultimately be benefited thereby increasing in the finance
for the organization.
The resulting increase in revenue and operational efficiency will make Globex
popular and also increasing the market presence in the process.
The newer system is also set to deliver an enhance accuracy rate.
The newer system is also set to improve the availability rate.
Project Scope
The project scope for the i-Crop system focuses on the overall boundaries framed by the
managers and the deliverables that needs to be done in order to realize the MOV listed above
(Marchewka, 2014). Scope essentially means that all of the tasks associated right from
requirement analysis to completion of the project. Following are the scope for the i-Crop
project:
Collecting requirements of the key stakeholders.
Data processing
Discussion of the rules of the business as well as the documentation.
Detailing the requirement of the system, it’s analysis as well as the evaluation thereof.
Additional design and analysis required for the system.
5
Preparation of the test cases for evaluation of the system.
Using of relevant checklists to verify the scope.
Reviewing of the project in order to include the feedback within the system.
Getting signoffs from respective stakeholders and sponsors.
Documentation of the overall procedure.
Scope Management Plan
The Scope Management Plan denotes the foundational level of scope and also includes the
main scope statement, the Work Breakdown Structure Dictionary and the WBS itself
(Kerzner & Kerzner, 2017).
Scope of the project
The scope for the project can be seen below
Replacement of the current system that is in place by the newer i-Crop system that is
much faster and efficient.
Ensuring that the bookings, biddings and payments must support multiple platforms
and interfaces.
The system should be able to generate the required reports such as the sales reports,
expenses reports, details of the purchases etc.
The scope is expected to be managed by all of the project team members working for the
project at Virtucon Consulting. They are expected to have been worked before on a similar
system. Also, the main purpose of the project as well as the MOV has already been chosen.
The scope mentioned for the project, would also need to be approved by the project team
6
Using of relevant checklists to verify the scope.
Reviewing of the project in order to include the feedback within the system.
Getting signoffs from respective stakeholders and sponsors.
Documentation of the overall procedure.
Scope Management Plan
The Scope Management Plan denotes the foundational level of scope and also includes the
main scope statement, the Work Breakdown Structure Dictionary and the WBS itself
(Kerzner & Kerzner, 2017).
Scope of the project
The scope for the project can be seen below
Replacement of the current system that is in place by the newer i-Crop system that is
much faster and efficient.
Ensuring that the bookings, biddings and payments must support multiple platforms
and interfaces.
The system should be able to generate the required reports such as the sales reports,
expenses reports, details of the purchases etc.
The scope is expected to be managed by all of the project team members working for the
project at Virtucon Consulting. They are expected to have been worked before on a similar
system. Also, the main purpose of the project as well as the MOV has already been chosen.
The scope mentioned for the project, would also need to be approved by the project team
6
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
members who are working on this project at Virtucon Consultancy. Apart from them, the
scope would also need to be accepted and signed by the stakeholders of the Globex
Corporation. Once these has been done, the team members are expected to begin working on
developing the system.
List of Resources
In order to complete the project, the below mentioned resources would be needed for the
same:
a) Project Manager
b) A team of two architects.
c) A team of two system programmers.
d) A team of two testers
e) A team of two web designers
f) A team of two quality analysts
g) Lead trainer
h) Two quality analysts
i) Development lead
j) System analyst
IMAGE
Technologies needed for development
The technologies needed for system development is set of Workstations for all the team
members, a pre-configured IDE, a fibre-optic based Internet connection, a secure Lan
connection, hardware firewall and good antivirus protection along with a testing, hosting and
backup server.
Facilities
All of the above-mentioned team members would be working onsite for the project.
However, a separate room would be set aside for the developers and this room would be
dedicated for these project team members only.
Travel and Training needs
All of the traveling that is to be done, would be done between the Globex and Virtucon
headquarters in order to gather information that would otherwise be ineffective via remote
sessions. Apart from the traveling, training would be provided at Globex premises itself.
7
scope would also need to be accepted and signed by the stakeholders of the Globex
Corporation. Once these has been done, the team members are expected to begin working on
developing the system.
List of Resources
In order to complete the project, the below mentioned resources would be needed for the
same:
a) Project Manager
b) A team of two architects.
c) A team of two system programmers.
d) A team of two testers
e) A team of two web designers
f) A team of two quality analysts
g) Lead trainer
h) Two quality analysts
i) Development lead
j) System analyst
IMAGE
Technologies needed for development
The technologies needed for system development is set of Workstations for all the team
members, a pre-configured IDE, a fibre-optic based Internet connection, a secure Lan
connection, hardware firewall and good antivirus protection along with a testing, hosting and
backup server.
Facilities
All of the above-mentioned team members would be working onsite for the project.
However, a separate room would be set aside for the developers and this room would be
dedicated for these project team members only.
Travel and Training needs
All of the traveling that is to be done, would be done between the Globex and Virtucon
headquarters in order to gather information that would otherwise be ineffective via remote
sessions. Apart from the traveling, training would be provided at Globex premises itself.
7
High Level WBS or Workbreak Down Structure
The Work Breakdown Structure depicts a complete logical breakdown for the work that has
been proposed. These have been distributed in smaller chunks called as modules (Haugan,
2001). All of the Milestones are represented by the red-colored symbol.
WB
S
Task Name
0 iCorp
1 Prepare MOV
1.1 Set objectives
1.2 Finalize area of impact
1.3 Finalize desired value
1.4 Define Metric
2 Scope
2.1 Define scope
2.2 Prepare scope management plan
2.3 Define requirements
2.4 End-user interview
2.5 Gather resource information
3 New system requirements
3.1 Define testable requirements
3.2 Draft preliminary system
3.3 Review system
3.4 Get Feedback
3.5 Define delivery method
3.6 Get approval
3.7 Finalize analysis
4 Design
4.1 Review system requirements
4.2 Create prototype model
4.3 Review client feedback
4.4 Accommodate changes
4.5 Prepare design document
8
The Work Breakdown Structure depicts a complete logical breakdown for the work that has
been proposed. These have been distributed in smaller chunks called as modules (Haugan,
2001). All of the Milestones are represented by the red-colored symbol.
WB
S
Task Name
0 iCorp
1 Prepare MOV
1.1 Set objectives
1.2 Finalize area of impact
1.3 Finalize desired value
1.4 Define Metric
2 Scope
2.1 Define scope
2.2 Prepare scope management plan
2.3 Define requirements
2.4 End-user interview
2.5 Gather resource information
3 New system requirements
3.1 Define testable requirements
3.2 Draft preliminary system
3.3 Review system
3.4 Get Feedback
3.5 Define delivery method
3.6 Get approval
3.7 Finalize analysis
4 Design
4.1 Review system requirements
4.2 Create prototype model
4.3 Review client feedback
4.4 Accommodate changes
4.5 Prepare design document
8
5 Development
5.1 Review system requirements
5.2 Creates modules
5.3 Assign tasks to team
5.4 Develop business logic
6 Testing
6.1 Unit testing
6.2 System Testing
7 Training
7.1 Prepare training plan
7.2 Conduct training
Gantt chart
9
5.1 Review system requirements
5.2 Creates modules
5.3 Assign tasks to team
5.4 Develop business logic
6 Testing
6.1 Unit testing
6.2 System Testing
7 Training
7.1 Prepare training plan
7.2 Conduct training
Gantt chart
9
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Budget
Assumptions made with respect to the budget of the project.
All of the costs associated with the project have been done with respect to employee’s
designation and the workload they have in the project.
The cost for training has also been included.
10
Assumptions made with respect to the budget of the project.
All of the costs associated with the project have been done with respect to employee’s
designation and the workload they have in the project.
The cost for training has also been included.
10
Project Risk Analysis as well as Risk Plan
Assumptions
The system proposed would provide 24 x 7 support.
The system would be functional on all mobile devices.
The user interface will work for all customers.
No other system has been developed by any competitor
Budget could exceed over and above what is mentioned.
Scope change can also occur
Risk Identification Framework
Risk should be identified from earlier stages and there could be a time where the project is
abandoned due to the criticality of the risks (Kendrick, 2015).
Ris
k
ID
Phases Description Occurrenc
e Rate
Impac
t on a
scale
of 1 to
10
Ran
k of
the
risk
Response
method
Opportunit
y or Threat
1 Initializatio
n
Change in
the scope
30 10 3 Gather all
required
informatio
n the best
possible
way
Opportunit
y
2 During the
planning
phase
Wrong
programmin
g method
selected
20 6 1.2 Reduction
in problem
that it
would
create
Threat
3 During
developmen
t
Bad initial
system
design
40 5 2 Accept
risk and
try to
prevent
errors
Threat
4 During Too many 20 4 0.8 Mitigate Threat
11
Assumptions
The system proposed would provide 24 x 7 support.
The system would be functional on all mobile devices.
The user interface will work for all customers.
No other system has been developed by any competitor
Budget could exceed over and above what is mentioned.
Scope change can also occur
Risk Identification Framework
Risk should be identified from earlier stages and there could be a time where the project is
abandoned due to the criticality of the risks (Kendrick, 2015).
Ris
k
ID
Phases Description Occurrenc
e Rate
Impac
t on a
scale
of 1 to
10
Ran
k of
the
risk
Response
method
Opportunit
y or Threat
1 Initializatio
n
Change in
the scope
30 10 3 Gather all
required
informatio
n the best
possible
way
Opportunit
y
2 During the
planning
phase
Wrong
programmin
g method
selected
20 6 1.2 Reduction
in problem
that it
would
create
Threat
3 During
developmen
t
Bad initial
system
design
40 5 2 Accept
risk and
try to
prevent
errors
Threat
4 During Too many 20 4 0.8 Mitigate Threat
11
execution of
the project
ideas and the
resulting
conflicts
the given
risks
5 Monitoring
phase
Inappropriat
e testing
method
30 3 0.6 Mitigate
the given
risk
Threat
Risk Analysis
Project manager needs to gather the requirements during the initial phase.
The development team of the project needs to analyse the best programming method.
Quality assurance team needs to select an appropriate testing method.
Developer needs to guide the trainers on how to use the system.
Leading and directing the team members by the Project Manager.
Quality Management Plan
The overall quality of the project is directly related to how well the requirements was
understood earlier, the use of appropriate software development method, the understanding of
programmers and the project managers job of managing the project. A robust quality
assurance team needs to be deployed and the code should be checked for bugs regularly. The
project needs to be monitored for its budget and time and made sure that mechanisms are in
place so that it does not go overboard. Verification and Validation shall be done for the
project.
Furthermore, quality verification would be done with the help of following
Walk-through and Inspection
Work of the team members are thoroughly inspected.
Requirement specification review
Requirements of the project are thoroughly analysed and a requirement specification
document is prepared and shared with Globex.
Code Review
The code prepared thereafter is reviewed for its quality, bugs and it’s robustness.
Additionally, the following validation activities are needed to be executed:
System Validation
12
the project
ideas and the
resulting
conflicts
the given
risks
5 Monitoring
phase
Inappropriat
e testing
method
30 3 0.6 Mitigate
the given
risk
Threat
Risk Analysis
Project manager needs to gather the requirements during the initial phase.
The development team of the project needs to analyse the best programming method.
Quality assurance team needs to select an appropriate testing method.
Developer needs to guide the trainers on how to use the system.
Leading and directing the team members by the Project Manager.
Quality Management Plan
The overall quality of the project is directly related to how well the requirements was
understood earlier, the use of appropriate software development method, the understanding of
programmers and the project managers job of managing the project. A robust quality
assurance team needs to be deployed and the code should be checked for bugs regularly. The
project needs to be monitored for its budget and time and made sure that mechanisms are in
place so that it does not go overboard. Verification and Validation shall be done for the
project.
Furthermore, quality verification would be done with the help of following
Walk-through and Inspection
Work of the team members are thoroughly inspected.
Requirement specification review
Requirements of the project are thoroughly analysed and a requirement specification
document is prepared and shared with Globex.
Code Review
The code prepared thereafter is reviewed for its quality, bugs and it’s robustness.
Additionally, the following validation activities are needed to be executed:
System Validation
12
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
The system needs to be validated to ensure reliability, efficiency, performance and accuracy.
Validation of the Code
The source code is validated to ensure there is no redundant parts and that the system
is expected to perform as per the needs of the client.
Validation of the Feedback
The overall validation of the feedbacks as and when they are received.
Annotated Bibliography
Dowson, R., & Bassett, D. (2015) Event Planning and Management: A Practical
Handbook for PR and Events Professionals. Kogan Page Publishers.
In this particular research, Author tries to explore the management process and and
additionally explores theories and models that relate to management. Specifically, It focuses
on aspects such as procurement management, stakeholder management, team building and
program creation among others. The researcher used the research to create a project charter.
Marcelino-Sádaba, S., Pérez-Ezcurdia, A., Lazcano, A. M. E., & Villanueva, P. (2014).
Project risk management methodology for small firms. International Journal of Project
Management, 32(2), 327-340.
This particular journal article was authored by Marcelino and it specifies the risk
management methodologies for smaller organizations. It provides templates, indicators,
checklists and recommend certain actions for risk management. This helps in understanding
of how the risk management works and why is it important for a project of this calibre.
Schwalbe, K. (2015). Information technology project management. Cengage Learning.
This a book and it was authored by Schwalbe and it depicts the principle of IT related project
management. It provides techniques and tools for the management of project given that ten
areas of project management via PMBOK. These includes planning, controlling, designing,
executing and closing among others. This helped in choosing of the methodology for project
management.
13
Validation of the Code
The source code is validated to ensure there is no redundant parts and that the system
is expected to perform as per the needs of the client.
Validation of the Feedback
The overall validation of the feedbacks as and when they are received.
Annotated Bibliography
Dowson, R., & Bassett, D. (2015) Event Planning and Management: A Practical
Handbook for PR and Events Professionals. Kogan Page Publishers.
In this particular research, Author tries to explore the management process and and
additionally explores theories and models that relate to management. Specifically, It focuses
on aspects such as procurement management, stakeholder management, team building and
program creation among others. The researcher used the research to create a project charter.
Marcelino-Sádaba, S., Pérez-Ezcurdia, A., Lazcano, A. M. E., & Villanueva, P. (2014).
Project risk management methodology for small firms. International Journal of Project
Management, 32(2), 327-340.
This particular journal article was authored by Marcelino and it specifies the risk
management methodologies for smaller organizations. It provides templates, indicators,
checklists and recommend certain actions for risk management. This helps in understanding
of how the risk management works and why is it important for a project of this calibre.
Schwalbe, K. (2015). Information technology project management. Cengage Learning.
This a book and it was authored by Schwalbe and it depicts the principle of IT related project
management. It provides techniques and tools for the management of project given that ten
areas of project management via PMBOK. These includes planning, controlling, designing,
executing and closing among others. This helped in choosing of the methodology for project
management.
13
References
Haugan, G. T. (2001). Effective work breakdown structures. Berrett-Koehler Publishers.
Heagney, J. (2016). Fundamentals of project management. AMACOM Div American
MgmtAssn.
Kendrick, T. (2015). Identifying and managing project risk: essential tools for failure-
proofing your project. AMACOM Div American Mgmt Assn.
Kerzner, H., & Kerzner, H. R. (2017). Project management: a systems approach to planning,
scheduling, and controlling. John Wiley & Sons.
Marchewka, J. T. (2014). Information technology project management. Wiley.
Rowe, S. R. (2015). Project management for small projects. Berrett-Koehler Publishers.
14
Haugan, G. T. (2001). Effective work breakdown structures. Berrett-Koehler Publishers.
Heagney, J. (2016). Fundamentals of project management. AMACOM Div American
MgmtAssn.
Kendrick, T. (2015). Identifying and managing project risk: essential tools for failure-
proofing your project. AMACOM Div American Mgmt Assn.
Kerzner, H., & Kerzner, H. R. (2017). Project management: a systems approach to planning,
scheduling, and controlling. John Wiley & Sons.
Marchewka, J. T. (2014). Information technology project management. Wiley.
Rowe, S. R. (2015). Project management for small projects. Berrett-Koehler Publishers.
14
1 out of 15
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.