logo

Incheon International Airport Integrated Spatial Management System Issue 2022

   

Added on  2022-09-26

6 Pages3360 Words37 Views
Incheon International Airport Integrated Spatial Management System
Student Name, Student Number, Email Address
Executive Summary
Building Information management is a very important aspect in the construction industry.
There are massive challenges which are faced by the construction industry. BIM tools have
the capability to address the issues of the construction industry. There are various types of
BIM tools that are available such as Big data, 4D sequencing and model estimates. In this
report, BIM approach indicates several approaches as an innovation to address the risk
management as well as quality assurance. In this report, it will discuss regarding the Incheon
International Airport Integrated Spatial Management System. At first, this report will discuss
regarding the details of the company. After that, it will discuss regarding the details of the
project as well as problems faced by the organisation before implementing the project. In this
report, it will discuss regarding the innovation strategy regarding this project. In this
particular portion, importance of the BIM is discussed. It also discusses regarding the
integration of GIS and BIM. After that, this report will discuss regarding the various
improvement strategy is discussed. In this portion, how BIM can integrate with big data,
cloud computing, artificial intelligence and machine learning are discussed. In this portion, it
is also discusses regarding the RFID data.
1. INTRODUCTION (TIMES NEW ROMAN BOLD 14 ALL CAPS
1.1.Company Name, Characteristics etc.
Incheon International Airport is treated as one of the largest airport in South
Korea. It is a very busy airport in South Korea. Every year this airport bags the best
airport award from the Airports Council International (Xiong 2020). It is also treated
as the cleanest airport in all over the world. It bagged the best airport of the world
award by Skytrax. It has the capability of tackling 2.7 million tons of cargo. The
length of the cargo space is two million square feet.
Volume of annual flight is increased from 240,000 to 410,000 (Kim, Lee and
Choi 2020). The annual capacity is increased from 30-44 million and the annual cargo
capacity of this airport is from 2.7Mt to 4.5 Mt.
1.2.Project Name, Description etc.
In the Integrated Spatial Management System of the Incheon International Airport,
Geographical Information System unlocks entire potential of data by gripping the
power of maps and spatial analysis. It gives unparallel insight among various types of
data that are not seen in previous times (Khanzadi, Sheikhkhoshkar and
Banihashemi 2020). GIS can empower detailed knowledge regarding their knowledge
and assets.
The geospatial information is available totally relevant to the development of
the sites (Oliver et al. 2020). In this particular project, Virtual Globe needs to be the
main gateway for the GIS information that maximizes the contact frequency for the
non technical users of the airport because it gives the strong environment for users.

Paper Title (use abbreviation if necessary) Surname of the first author
That is why; it is treated as the 3D model based GIS information. In this project there
is a 3D web based provision as well as managing gadget based system in the airport.
By adopting the Building Information Management, Geographical Information System
can be applied to manage the buildings as well as infrastructure spread in the
entire airport by using a two dimensional model base because of large scale of data
processing. They also take Revit for the BIM software as well as ESRI Arc GIS for
GIS based software (Kim, Lee and Choi 2020). These tools are quite capable for
processing of three dimensional data in real time.
Classification Extension Description
DEM *.bil Data regarding the height
mapping for Tile zone
Point *.poi Information related to Point
of Interest (POI) symbol for
Tile zone.
Billboard *.poi Information related to
Billboard symbol for Tile
Zone
Real3D index *.dat Information related to Real
3D symbol for Tile Zone
Direct Show Surface *.dds Information related to
Satellite image for Tile Zone
Figure 1: BIM project table
Source: Created by author
Figure 1: Real3D index
Modern Construction Projects – Fall 2019 2 of 2 Western Sydney University

Paper Title (use abbreviation if necessary) Surname of the first author
Source: https://www.researchgate.net/figure/Real-3D-
model-of-Wuhan-China_fig2_271951596
2. THE PROBLEM(S)
There is lots of problems that are faced by the airport authority regarding the
construction. For resolving those problems, this project is designed. There is trend to use
some traditional methodologies regarding the construction and other assignments of the
airports. Staffs are not willing to accimilitize to several approaches that has been set to it.
Modification is a slow process. And adopting the change is the need of the growth. After
some onset construction, urgent modification is required that take a long time and it also
takes some costs (Rivera and Christian 2020). Most of the times, there are some incorrect
evaluations of services generate conflicts regarding the construction of the sites. Most of
the times it happens that amount of ordered building materials are of huge number and it
was ordered without any proper approximation.
After the designing of the plan for work, the proper estimation of building material is
totally drawn out (MEHRBOD, STAUB-FRENCH AND TORY 2020). Complexities of
the two dimensional plan may lead to some incorrect calculations eventually causing the
shortage or wastage of the material used for various constructions of the airport.
For resolving those problems, BIM can play vital contribution.
3. THE INNOVATION(S)
The project is mainly focused on the designing of the Geographical Information
System data as well as examines associated with to the CAD/BIM/GIS addition for increasing
the effectiveness for management of the building information by using BIM data erection and
data retrieved from GIS (Okakpu et al. 2020). Geospatial information can be used with the
help of some satellite photos of Google Earth. In this software, various three dimensional
forms of the construction is stored. Many plug associated with the Google Earth requires to be
performed by using some exisisting BIM tools. VWorld tools are also used which includes
some satellite photos related to the airport construction.
With the help of this, it could gain easy access to the building related information
regarding the information available in their own database. For enhanced interoperability
design of the project, there is a huge need of CAD/BIM/GIS addition. It also helps to maintain
the construction as well as maintenance of information which covers the building and
infrastructure life cycles (Phang, Chen and Tiong 2020). This integration is very difficult
because it is considered as the essential handling of large amount of three dimensional data.
There are some essential concepts that can be used to develop this project. It is totally based
on the hierchical structure. It is done as per specification provided by the National BIM
standards.
In this project, Revit is treated as the BIM software and VWorld as the desktop. In this
case, A360 is treated as the Revit-BIM viewer (Oliver et al. 2020). These are connected with
middleware. Middleware contains following parts: - search part is utilized for fetching a data
from the VWorld. Convert part is utilized for modification of the data so that middleware has
a capability to process it. It is used to develop some Revit Objects so that Revit Objects can be
managed within VWorld (Mostafa et al. 2020). Request keyword covers many forms of data.
However, it is very important to utilize the lot number for getting a good address and for
achieving an outstanding outcome because there is a map for performing the registration of a
Modern Construction Projects – Fall 2019 3 of 2 Western Sydney University

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Project Development & Optimization | Article Summary
|8
|1503
|12