Running head: PROJECT DEVELPOMENT & OPTMISATION
PROJECT DEVELOPMENT & OPTMISATION
Name of the Student
Name of the University
Author Note
Project Development & Optimization | Article Summary_1
1PROJECT DEVELOPMENT & OPTIMISATION
Table of Contents
Introduction................................................................................................................................2
Article summary.........................................................................................................................2
Conclusion..................................................................................................................................4
References..................................................................................................................................6
Project Development & Optimization | Article Summary_2
2PROJECT DEVELOPMENT & OPTIMISATION
Developing a framework of the Revolutionise the 4D BIM process: IPD based solution
(https://researchportal.port.ac.uk/portal/files/18284226/4D_BIM_paper_Post_Print_Far
is.pdf)
Introduction
In this article authors mention that it is vdery important to add Building Information
Modelling and Integrated Project Delivery (Rocha et al. 2020). BIM needs some
modifications to integrate with the IPD. In this article, they describe an innovative procedure
for giving necessary support to the 4D BIM automation inside the IPD approach (Elghaish
and Abrishami 2020). They mention that there is a 22.86% cost saving due to the utilization
of suggested automated multi-objective optimisation.
In this article, the authors describe regarding the integration of the Activity Based
Costing (ABC) with the four dimensional Building Information Management for configuring
the level of hierarchy of some overhead activities with the IPD based approach. Maximum
level of the benefaction in management of the IPD project was 33.33% and minimum was
8.33% by the project level (Mehrbod, Staub-French and Tory 2020). Authors mention that in
this research paper represents a new procedure for developing the four dimensional Building
Information Management model which is planning and scheduling. In this case, they develop
a Building Information Management library regarding various automations for the designing
the project schedule with respect to the three dimensional Building Information Management
sequence (Zhu et al. 2020). The optimisation of this project is treated by automated inside the
generation process using suggested model of genetic algorithm.
Article summary
In this article, authors describe that construction planning involves elaboration of the
activity of the project, estimation of the resource as well as deadline for conducting the pre-
Project Development & Optimization | Article Summary_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Building Information modelling PDF
|9
|1795
|239

Business Information Modeling (BIM) Projects Assignment
|18
|3365
|261

Incheon International Airport Integrated Spatial Management System Issue 2022
|6
|3360
|37

Case Study | Building Information Modeling Education