International Project Management Executive Summary
VerifiedAI Summary
1.0 Introduction 3 2.0 Methodology 3 2.1 Advantages and risks of the monitoring and controlling method 3 2.2 Reason for choosing Earned Value Analysis 4 3.0 Reporting format and structure 5 3.1 Frequency of the project Governance Board meeting 5 4.0 Format and structure of progress report for CEO and Board 6 References 7 1.0 Introduction Kate monitors and controls the project plan which involves with actual performance of the project with the planned activities of project work. 2.1 Advantages and risks of the monitoring and controlling method The advantages of monitoring and controlling methods are that