logo

Lean Operations and Scheduling in Samsung and Tecno Companies

   

Added on  2023-06-05

9 Pages1818 Words398 Views
Lean operations and scheduling
Lean operations and scheduling
Name:
Institution:

Lean operations and scheduling
Introduction
Tecno company is a company that manufactures android smartphones.it is based in Hong
Kong. It is a subsidiary of Transion holdings. It focuses its business in Africa and south Asian
market (Nrior, 2017).
Samsung company is a company that manufactures android phones. The company used to
deal with areas such as textiles, insurance and food processing. It is based in south Korea. The
company was founded by Lee Byung-Chul (Choong, 2014)
Production process.
Samsung
Samsung electronics such as mobile phones use several stages which are well planned. In
order to perform the process of manufacturing effectively and the completion of the entire cycle
for the products (Kim, 1997). The stages are arranged in a manner that they are time and cost
effective. The major stages include;
i) Conceptualization
Samsung has continuously attempted to formulate the concept of products based on the
technologies that are advanced.
ii) Research
After the product concept has been developed, it greatly focuses on the suitable technology
identification, production methods as well as vendors.
iii) Circuit design

Lean operations and scheduling
The company uses a lot of computers drafting software in developing systemic diagram. The
company also generates preliminary parts costing the product as well as prototyping list.
Samsung electronics aims at developing attractive enclosure design as well as selection.
iv) Prototype development
Prototype is developed for the purposes of trial. The prototype that is hand wired is detected
as used in the process of deign.
v) Reviewing of the design
The company focuses the way products appear, their functions, how to enhance them and
how to build cost on the current units and the evaluation of products.
vi) Setting up of test.
Test procedures, apparatus and detailed instruction of assembly as well as fixtures are placed
by the company to ensure quality of products.
vii) Documentation
The stage focuses on giving the deliverables for the project. The deliverables include, sources
of the parts, part circuit diagram, mechanical drawings, master printed circuit artwork as well as
software source code.
viii) Compliance by the agency
Samsung company requires a lot of agency compliance especially in regards to the current
laws and regulations.
ix) Follow up

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Innovation and Commercialization
|16
|754
|41

Implementation of Strategic Tools in Operations Management
|11
|2735
|84

Framework for Selection of Sustainable Outsourcing Supplier
|105
|26759
|61

Operations Management Strategy for River Island
|11
|3310
|157

Construction of a Building for Wesfarmers for Providing Warehouse Facility
|24
|3328
|282

Operations and Project Management
|13
|4006
|225