This report discusses the importance of planning permission and building control in ensuring the safety and health of people. It outlines the considerations to be taken into account when applying for planning permission and the process of planning. The report also identifies the laws that govern the planning system and discusses the differences between planning permission and building regulations. Additionally, the report covers the process of appeal and appeal methods. Subject: Construction, Course Code: N/A, Course Name: N/A, College/University: N/A
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Unit 5 Legal &
Statutory
Responsibilities in
Construction
Statutory
Responsibilities in
Construction
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Table of Contents
INTRODUCTION ..........................................................................................................................3
MAIN BODY...................................................................................................................................3
TASK 1.......................................................................................................................................3
TASK 2.......................................................................................................................................4
TASK 3.......................................................................................................................................5
TASK 4.......................................................................................................................................6
TASK 5.......................................................................................................................................7
CONCLUSION................................................................................................................................8
REFERENCES................................................................................................................................9
INTRODUCTION ..........................................................................................................................3
MAIN BODY...................................................................................................................................3
TASK 1.......................................................................................................................................3
TASK 2.......................................................................................................................................4
TASK 3.......................................................................................................................................5
TASK 4.......................................................................................................................................6
TASK 5.......................................................................................................................................7
CONCLUSION................................................................................................................................8
REFERENCES................................................................................................................................9
INTRODUCTION
This have kind of permission which is wanted to perform the paintings of constructing.
The law of constructing set widespread for production and designing of the constructing to make
sure fitness and protection for humans in constructing. This additionally need to make sure that
the strength and gasoline is conserved and offerings have been given to the humans consists of
the ones who've disability, to shifting and having access to withinside the constructing. Planning
look for manual manner of town, towns and improvement of united states side(Shanks, and, et.
al., 2019). This use the constructing and land, construct appearance, attention for the landscapes,
etc. have impact withinside the improvement for fashionable environment. The record is
primarily based totally on layout a constructing and what are the law of constructing along side
the system which a making plans software is going thru. Moreover, the regulation that's govern a
machine of making plans is being stated and with this the dialogue for law of constructing will
differs from a permission of making plans can also be stated. In the quit an acclaim for
constructing thru a few instance ought to be done.
MAIN BODY
TASK 1
Planning permission is mostly inescapable part of process, when this come to extend your
building, house, building an office in the garden, or build a new house. You either wants to made
a planning application or, if the scheme is of small scale outbuilding or extension, you are able to
avoid applying for permission if you made within specified limits known as Permitted
Development. Understand how system of planning works before submitting an application will
assists you in navigate the process. This changes for keeping on top, there are various kind of
application available, each of them have various costs, caveats and details needed, so this pay for
knowing which application would best suitable for your project. In this what you need to know
for application of planning before submitting one, how to determine and how to apply whether
the project need planning permission in first place(Motiuk, and Keown, 2021).
There are some kind of planning permission available, every best suitable for some projects:
Full planning permission have consent for a project related to detailed design provided.
Moreover, the project have to show for meeting planning conditions attached for
This have kind of permission which is wanted to perform the paintings of constructing.
The law of constructing set widespread for production and designing of the constructing to make
sure fitness and protection for humans in constructing. This additionally need to make sure that
the strength and gasoline is conserved and offerings have been given to the humans consists of
the ones who've disability, to shifting and having access to withinside the constructing. Planning
look for manual manner of town, towns and improvement of united states side(Shanks, and, et.
al., 2019). This use the constructing and land, construct appearance, attention for the landscapes,
etc. have impact withinside the improvement for fashionable environment. The record is
primarily based totally on layout a constructing and what are the law of constructing along side
the system which a making plans software is going thru. Moreover, the regulation that's govern a
machine of making plans is being stated and with this the dialogue for law of constructing will
differs from a permission of making plans can also be stated. In the quit an acclaim for
constructing thru a few instance ought to be done.
MAIN BODY
TASK 1
Planning permission is mostly inescapable part of process, when this come to extend your
building, house, building an office in the garden, or build a new house. You either wants to made
a planning application or, if the scheme is of small scale outbuilding or extension, you are able to
avoid applying for permission if you made within specified limits known as Permitted
Development. Understand how system of planning works before submitting an application will
assists you in navigate the process. This changes for keeping on top, there are various kind of
application available, each of them have various costs, caveats and details needed, so this pay for
knowing which application would best suitable for your project. In this what you need to know
for application of planning before submitting one, how to determine and how to apply whether
the project need planning permission in first place(Motiuk, and Keown, 2021).
There are some kind of planning permission available, every best suitable for some projects:
Full planning permission have consent for a project related to detailed design provided.
Moreover, the project have to show for meeting planning conditions attached for
permission in order for approve to be valid. They have to discharge formally through
letter by local authority to begin work.
Outline planning permission do not have any specific in design, but offer permission in
principle. This do not give consent for start the work, this is used most often for exploring
whether building will be viable.
Household planning permission is useful as permission for extend or alter house of
individual within boundary of the property(Seidu, and, et. al., 2022).
In this the consideration are given which a company take into consideration before submitting
application for the 4 storey building-
General- This part set a standard needed for space of various part of ventilation, building
and lights.
Load of Occupant- 10.0
Main constructing- The duration of constructing should be positioned with
appreciate to common degree of avenue from web website online to be able to guarantee
right drainage of webweb page however the peak now no longer must much less than forty
five cm.
Interior Courtyards, blanketed parking spaced and Garages- They ought to be raised at 15
cm above surrounding floor stage and should be satisfactorily drained.
• Minimum vicinity of workplace to be used as workspace have now no longer to be much
less than 6 sq. m. with minimal width of 2.1 m.
Loft- The location need to be limited for the 25% protected region or floor. Minimum top
with inside the ceiling and loft ought to be 1.seventy five m and clean peak under the loft
could be noted in constructing thru legal guidelines for space.
TASK 2
In normal terms, the application should include:
Five copy of application form.
Signed ownership certificate.
The location plan, elevation for both proposed and existing site, block plan.
The design and access statement.
The information of drainage.
The correct fees.
letter by local authority to begin work.
Outline planning permission do not have any specific in design, but offer permission in
principle. This do not give consent for start the work, this is used most often for exploring
whether building will be viable.
Household planning permission is useful as permission for extend or alter house of
individual within boundary of the property(Seidu, and, et. al., 2022).
In this the consideration are given which a company take into consideration before submitting
application for the 4 storey building-
General- This part set a standard needed for space of various part of ventilation, building
and lights.
Load of Occupant- 10.0
Main constructing- The duration of constructing should be positioned with
appreciate to common degree of avenue from web website online to be able to guarantee
right drainage of webweb page however the peak now no longer must much less than forty
five cm.
Interior Courtyards, blanketed parking spaced and Garages- They ought to be raised at 15
cm above surrounding floor stage and should be satisfactorily drained.
• Minimum vicinity of workplace to be used as workspace have now no longer to be much
less than 6 sq. m. with minimal width of 2.1 m.
Loft- The location need to be limited for the 25% protected region or floor. Minimum top
with inside the ceiling and loft ought to be 1.seventy five m and clean peak under the loft
could be noted in constructing thru legal guidelines for space.
TASK 2
In normal terms, the application should include:
Five copy of application form.
Signed ownership certificate.
The location plan, elevation for both proposed and existing site, block plan.
The design and access statement.
The information of drainage.
The correct fees.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Plans
Site plan- showing the proposed development in detail.
Ownership certificate A, B, C, D.
Agricultural holdings
Design and statement of access outlying the principle design.
Fire statement
Notice to the owners
The process of planning application goes through 4 stages
1. Validation: Once application received, the technical support team check an application to
make sure everything which is needed to be submitted. If they have everything which is
needed, the application will be registered as valid. If this is not, then we tell applicant
what is missing so they can sent missing thing.
2. Consultation: When the application is valid, then the authority consult with neighbours
affected through proposals. They will also consult with statutory bodies when relevant.
The application needs to advertise if required through legislation. Anyone can comment
on this. 21 days are allowed for receiving comments.
3. Determination: The application is then presented to a planning officer. The planning
officer consider factors such as location, neighbour impact, policy, design, consultee
comments and wider impact. The process take place within 8 and 13 weeks, this depends
on type of application. In this process, many discussions and negotiations takes
place(Liu, and, et. al., 2018). After this the planning officer write a report recommends
approval or refuse the application.
4. Decision: The final decision will be made in 2 ways, either:
Through a planning officer, or
Through our planning committee, made for elected councillors
once the decision is made, this is to be sent to the applicant or agent.
TASK 3
Here are the law which monitor or govern the system of planning-
Caravan sites and control of development act 1960
Countryside and rights of way act 2000
Enterprise and regulatory reform act 2013
Site plan- showing the proposed development in detail.
Ownership certificate A, B, C, D.
Agricultural holdings
Design and statement of access outlying the principle design.
Fire statement
Notice to the owners
The process of planning application goes through 4 stages
1. Validation: Once application received, the technical support team check an application to
make sure everything which is needed to be submitted. If they have everything which is
needed, the application will be registered as valid. If this is not, then we tell applicant
what is missing so they can sent missing thing.
2. Consultation: When the application is valid, then the authority consult with neighbours
affected through proposals. They will also consult with statutory bodies when relevant.
The application needs to advertise if required through legislation. Anyone can comment
on this. 21 days are allowed for receiving comments.
3. Determination: The application is then presented to a planning officer. The planning
officer consider factors such as location, neighbour impact, policy, design, consultee
comments and wider impact. The process take place within 8 and 13 weeks, this depends
on type of application. In this process, many discussions and negotiations takes
place(Liu, and, et. al., 2018). After this the planning officer write a report recommends
approval or refuse the application.
4. Decision: The final decision will be made in 2 ways, either:
Through a planning officer, or
Through our planning committee, made for elected councillors
once the decision is made, this is to be sent to the applicant or agent.
TASK 3
Here are the law which monitor or govern the system of planning-
Caravan sites and control of development act 1960
Countryside and rights of way act 2000
Enterprise and regulatory reform act 2013
Environment act 1995
Environment protection act 1990
Growth and infrastructure act 2013
Infrastructure act 2015
Planning ( listed buildings and conservation areas ) 1990
Planning act 2008
Town and country planning act 1990
TASK 4
If an enterprise want to make 4 storey building then they must take permission before
start the work of construction. In this the difference between regulation of planning permission
and building is given-
Building regulations is related to setting up minimum standard to construction and
design of the building to ensure that the work is properly done in which the planning permission
is for the external appearance for ensuring and building the consideration for landscape are kept
in local environment. Here are difference between both of them-
Building Regulations Planning Permission
This is a structural stability for the
building.
Actual measures of fire safety have to
consists of fire escapes.
Make sure that the building is water
and weather tight.
Utilisation of toxic substance in the
cavity fill insulation system.
Sound level of insulation in the
building and rooms.
Underpinning of the buildings base.
Householder planing consent-
Wanted for the loft, extensions
conversions. Garages, conservatories
and dormer windows.
Consent of full planning- Required
when the company changes dwelling
number of site or change use of
property.
Outdoor planning consent- Company
have to find scale and scope of plan for
approval in principal for committing in
any substantial cost.
Environment protection act 1990
Growth and infrastructure act 2013
Infrastructure act 2015
Planning ( listed buildings and conservation areas ) 1990
Planning act 2008
Town and country planning act 1990
TASK 4
If an enterprise want to make 4 storey building then they must take permission before
start the work of construction. In this the difference between regulation of planning permission
and building is given-
Building regulations is related to setting up minimum standard to construction and
design of the building to ensure that the work is properly done in which the planning permission
is for the external appearance for ensuring and building the consideration for landscape are kept
in local environment. Here are difference between both of them-
Building Regulations Planning Permission
This is a structural stability for the
building.
Actual measures of fire safety have to
consists of fire escapes.
Make sure that the building is water
and weather tight.
Utilisation of toxic substance in the
cavity fill insulation system.
Sound level of insulation in the
building and rooms.
Underpinning of the buildings base.
Householder planing consent-
Wanted for the loft, extensions
conversions. Garages, conservatories
and dormer windows.
Consent of full planning- Required
when the company changes dwelling
number of site or change use of
property.
Outdoor planning consent- Company
have to find scale and scope of plan for
approval in principal for committing in
any substantial cost.
TASK 5
The manner for approval of constructing manipulate which a organization must follow-
• Contact constructing manage frame to test the law for constructing and practice for the
approval.
There are varieties of constructing manipulate frame's and enterprise will have anyone as in line
with their convenience.
Private Building Control Body's- Through a personal accredited inspector this inform nearby
authority for paintings.
Local Building Control Body's
• Selecting the utility kind- The organization can pick out a deliberate constructing kind. They
select a complete plan for software kind as that is a not unusualplace alternative wherein they
could assume choice in month. They were given the certificates for finishing touch in 8
week(Jones, 2022).
• Fees and Costs- This is primarily based totally on constructing manage frame selected via a
business enterprise as nearby authority on bases of prices in value foundation paintings like
inspection for paintings kind, site, living quantity in constructing and complete vicinity of
ground in case of extensions wherein the non-public constructing manage frame negotiate thru
their direct client.
There are a few examples-
• Motion to suppress- This is a not unusualplace problem to attraction that is an wrong rule on
movement to suppress. This is relevant on movement for suppress a few proof that are
unlawfully received thru the enforcement of regulation or this can stem via the movement for
suppress declaration shaped thru birthday birthday celebration for the case.
• Incorrect proof ruling- This is the opposite not unusualplace problem wherein the wrong proof
is gift and primarily based totally on defective or rumour science. Evidence should be applicable
and non duly judicial and amassed properly.
The nearby authority will reject the software for a person who perform paintings to construct for
dishing out or enjoyable with one or extra want for the law of constructing(El Maguiri, and
Souabi, 2021). If a number of the enterprise's software get rejected then they may attraction
The manner for approval of constructing manipulate which a organization must follow-
• Contact constructing manage frame to test the law for constructing and practice for the
approval.
There are varieties of constructing manipulate frame's and enterprise will have anyone as in line
with their convenience.
Private Building Control Body's- Through a personal accredited inspector this inform nearby
authority for paintings.
Local Building Control Body's
• Selecting the utility kind- The organization can pick out a deliberate constructing kind. They
select a complete plan for software kind as that is a not unusualplace alternative wherein they
could assume choice in month. They were given the certificates for finishing touch in 8
week(Jones, 2022).
• Fees and Costs- This is primarily based totally on constructing manage frame selected via a
business enterprise as nearby authority on bases of prices in value foundation paintings like
inspection for paintings kind, site, living quantity in constructing and complete vicinity of
ground in case of extensions wherein the non-public constructing manage frame negotiate thru
their direct client.
There are a few examples-
• Motion to suppress- This is a not unusualplace problem to attraction that is an wrong rule on
movement to suppress. This is relevant on movement for suppress a few proof that are
unlawfully received thru the enforcement of regulation or this can stem via the movement for
suppress declaration shaped thru birthday birthday celebration for the case.
• Incorrect proof ruling- This is the opposite not unusualplace problem wherein the wrong proof
is gift and primarily based totally on defective or rumour science. Evidence should be applicable
and non duly judicial and amassed properly.
The nearby authority will reject the software for a person who perform paintings to construct for
dishing out or enjoyable with one or extra want for the law of constructing(El Maguiri, and
Souabi, 2021). If a number of the enterprise's software get rejected then they may attraction
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
towards the choice of neighborhood authority for secretary of country for nearby and network
government. Here is a method for attraction which a employer can follow-
• This is a level procedure wherein the utility is made for nearby authority ask for doling out or
both enjoyable with particular wishes of the law of constructing.
• Then fill the form. `
CONCLUSION
In the above report that is been concluded that the making plans permission and
constructing manipulate is vital for fitness and protection of people. The record outlines the
attention for being taken into consideration at time of making use of the software and that is with
the procedure for making plans thru which that is additionally mentioned. Furthermore, the
dialogue and identity of law which govern the gadget of making plans have been additionally
mentioned. In addition to this the dialogue inside making plans permission and rules of the
constructing is likewise done. In the stop many difficulty to method of enchantment and
enchantment have been discussed.
government. Here is a method for attraction which a employer can follow-
• This is a level procedure wherein the utility is made for nearby authority ask for doling out or
both enjoyable with particular wishes of the law of constructing.
• Then fill the form. `
CONCLUSION
In the above report that is been concluded that the making plans permission and
constructing manipulate is vital for fitness and protection of people. The record outlines the
attention for being taken into consideration at time of making use of the software and that is with
the procedure for making plans thru which that is additionally mentioned. Furthermore, the
dialogue and identity of law which govern the gadget of making plans have been additionally
mentioned. In addition to this the dialogue inside making plans permission and rules of the
constructing is likewise done. In the stop many difficulty to method of enchantment and
enchantment have been discussed.
REFERENCES
Books and Journals
El Maguiri, A. and Souabi, S., 2021, December. Geomatic tools for sustainable planning:
application for locating appropriate landfills. In Proceedings of the Institution of Civil
Engineers-Municipal Engineer (Vol. 174, No. 4, pp. 211-230). Thomas Telford Ltd.
Jones, P., 2022. Warehouse development and town planning policies in the UK. Property
Management.
Liu, Y., and, et. al., 2018. Modeling, planning, application and management of energy systems
for isolated areas: A review. Renewable and Sustainable Energy Reviews, 82, pp.460-
470.
Motiuk, L.L. and Keown, L.A., 2021. Correctional intake assessment and case planning:
Application development and validation. Criminal Justice and Behavior, 48(4), pp.556-
570.
Seidu, R.D., and, et. al., 2022. Assessing the Resilience of UK Construction SMEs: A Cross-
Sectional Analysis of the Effects of Covid-19 Pandemic. In Construction in 5D:
Deconstruction, Digitalization, Disruption, Disaster, Development (pp. 439-451).
Springer, Cham.
Seidu, R.D., and, et. al., 2022, June. Gender Diversity in the UK Construction Industry. In CIB
World Building Congress 2022.
Shanks, W., and, et. al., 2019. How much cement can we do without? Lessons from cement
material flows in the UK. Resources, Conservation and Recycling, 141, pp.441-454.
Books and Journals
El Maguiri, A. and Souabi, S., 2021, December. Geomatic tools for sustainable planning:
application for locating appropriate landfills. In Proceedings of the Institution of Civil
Engineers-Municipal Engineer (Vol. 174, No. 4, pp. 211-230). Thomas Telford Ltd.
Jones, P., 2022. Warehouse development and town planning policies in the UK. Property
Management.
Liu, Y., and, et. al., 2018. Modeling, planning, application and management of energy systems
for isolated areas: A review. Renewable and Sustainable Energy Reviews, 82, pp.460-
470.
Motiuk, L.L. and Keown, L.A., 2021. Correctional intake assessment and case planning:
Application development and validation. Criminal Justice and Behavior, 48(4), pp.556-
570.
Seidu, R.D., and, et. al., 2022. Assessing the Resilience of UK Construction SMEs: A Cross-
Sectional Analysis of the Effects of Covid-19 Pandemic. In Construction in 5D:
Deconstruction, Digitalization, Disruption, Disaster, Development (pp. 439-451).
Springer, Cham.
Seidu, R.D., and, et. al., 2022, June. Gender Diversity in the UK Construction Industry. In CIB
World Building Congress 2022.
Shanks, W., and, et. al., 2019. How much cement can we do without? Lessons from cement
material flows in the UK. Resources, Conservation and Recycling, 141, pp.441-454.
1 out of 9
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.