3.1 I worked with Mech Power Generator PTE LTD from 28th
September 2010 till date. Mech Power has a leading
manufacturer in design, assembly, testing, installation,
commissioning, sale and service of diesel power powered
generator sets in Singapore. It also supplies the power
generation industry in the Asia Pacific region. It has achieved
several key certifications.
In Mech Power Generator, I worked as a project engineer. My
job scope requires me to lead projects and coordinate it
accordingly until it is completed, and ready for the final
handover.
Background
3.2 Design, fabrication, installation, testing, commissioning one
number of generators, one number of underground storage
tanks with hydrocarbon leak detection system and float type
leakage sensor located at Jurong Island Singapore and
another one number of generators, one number of
underground storage tanks with hydrocarbon leak detection
system and float type leakage sensor located at landside of
Singapore.
3.3 It was one of my projects with durations from 2016 to 2018, I
worked with the Singapore Power group, for this project I
worked both landside and island side.

Organization Chart

Personal Work Place Activity:
3.4 I started my project with the documentation study and learn
the overall project scope of work. PE 1.1 For Tuas Cable Tunnel
Project we are supplied the 2 numbers of low-tension
generators one at landside and another at Jurong island. For
this project, it was a new experience for me to be working on
Jurong Island. I arranged a training for our team to be
acquainted with the safety regulations of our working
environment. PE 3.1
3.5 This project is under the purview of a well-established
company named SP Group. In this project, a tunnel is built to
transmit power form landside, to Jurong Island through the
use of a cable. Workers who entered the tunnel needed to
have RFID, and their identification is displayed on the screen
with a photo. It was a confidential project.
3.6 In this project we used a new system of testing a fuel leak,
by using a hydro carbon leak detector. PE 1.2 PE 2.4 It detects all
kinds of hydrocarbons in liquid stage. Had taken proactive
measures to get the qualified suppliers to ensure they
supplied good standard of products. PE 1.4
3.7 I submitted the catalog for the equipment, accessories and
raw materials through online. There was a coordination
meeting on every day on site office to co ordinate the site
delivery, installation, drawing and catalog submission. I
arranged a coordination meeting consultant, client and
design team to introduce them. During our meeting we
exchanged the organization chart to communicate easily
with respective departments. I arranged a weekly meeting in
our own company to exchange the information about the
project status it was effective.

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Mech Power Generator Project Engineer
|8
|1765
|338

Project Engineer at Mech Power Generator PTE LTD
|8
|1769
|346

Professional Engineer Summary Statement for Desklib
|5
|1680
|327