Project Evaluation Documentation for Melbourne Cricket Stadium
Verified
Added on 2023/06/04
|14
|2864
|216
AI Summary
This project evaluation documentation provides a detailed analysis of the renovation of Melbourne Cricket Stadium. It includes preliminary design, detailed design and development, system test, evaluation, validation, and optimization. The evaluation is based on scope analysis, client's need definition, and quality testing.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Running head: PROJECT EVALUATION DOCUMENTATION Project Evaluation Documentation Melbourne cricket stadium Name Institution Professor Course Date
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
1PROJECT EVALUATION DOCUMENTATION Table of Contents 1. Introduction..................................................................................................................................2 2. Preliminary Design......................................................................................................................2 3. Detailed Design and Development..............................................................................................4 4. System test, evaluation, validation, and optimisation..................................................................5 4.1 Melbourne Development Design Testing..............................................................................5 4.2 Melbourne Development Design Evaluation.........................................................................5 4.3 Melbourne Development Design Validation.........................................................................6 4.4 Melbourne Development Design Optimisation.....................................................................6 5. Evaluation....................................................................................................................................7 References......................................................................................................................................10
2PROJECT EVALUATION DOCUMENTATION 1. Introduction Thesystemtestinganddevelopmentholdsanintegralroleinquantifyingthe development of the successful implication and management. The deployment of the successive management and information alignment would be helpful for taking care of the design developed for the completion of the successful information management. The information management can be implied for easing the information alignment and operation execution. The Melbourne cricket stadium would be renovated for supporting the increment of the international standards of the development and information alignment. The following assignment would include the analysis of the activities for aligning the information management and activity scheduling for the completion of the design. The utilization of the information processing for executing the development of the functional development can be assisted by the utilization of the information execution. The assignment would include the system testing, evaluation, validation, and optimization of the project operationsfor the renovationof the Melbourne cricket stadium. The information processing would be implied for taking care of the renovation works of the ground. 2. Preliminary Design The design of the stadium would be modified for making sure that the ground can be used for supporting different events apart from the cricket tournament. A long debate has been running whether the stadium should be used for any other activities rather than the cricket matches. The stadium change would be helpful for adjusting many more events and tournaments. The redesign of the stadium has been modified several times including the pitch for making sure the stadium adjusts the event execution. A number of issues have resulted in implying changes in the design of the stadium. The smooth implementation of the changes had been halted due to the
3PROJECT EVALUATION DOCUMENTATION occurrence of the various issues and problems. Some issues have resulted in making sure that the stadium cannot be relocated and no external changes would be implied for the execution of the project activities.The factorsof scope creep,constructionworks, facilityextension,and management issues are the major causes of the project execution. The new design of the stadium would include the variables of stadium uses, location of stadium, resources allocation, and stadium capacity for the deployment of the effective standards of the stadium. The uses of the stadium would be a major factor for aligning with the implication and utilization of the successful inclusion of the operations. The location of the stadium is another major factor that would form the impact for the evolvement of the successive development management. The information development would be successively implied for easing the evolvement of the resource allocation. The stadium involves increment of the quality of the standards for dealing with the improvement of the operations. Figure 1: Factors to be considered for Melbourne Stadium Modification Stadium Uses Stadium Standards Location of stadium Resources allocation Stadium capacity
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
4PROJECT EVALUATION DOCUMENTATION 3. Detailed Design and Development The factors of scope creep, construction works, facility extension, and management issues are the major causes of the project execution. The new design of the stadium would include the variables of stadium uses, location of stadium, resources allocation, and stadium capacity for the deployment of the effective standards of the stadium. The uses of the stadium would be a major factor for aligning with the implication and utilization of the successful inclusion of the operations. The location of the stadium is another major factor that would form the impact for the evolvement of the successive development management. The information development would be successively implied for easing the evolvement of the resource allocation. The stadium involves increment of the quality of the standards for dealing with the improvement of the operations. The project would involve the successive formation of the renovation activities of making sure that the ground serves multiple purposes. The new design of the stadium would include the variables of stadium uses, location of stadium, resources allocation, and stadium capacity for the deployment of the effective standards of the stadium. The uses of the stadium would be a major factor for aligning with the implication and utilization of the successful inclusion of the operations. The location of the stadium is another major factor that would form the impact for the evolvement of the successive development management. The information development would be successively implied for easing the evolvement of the resource allocation. The stadium involves increment of the quality of the standards for dealing with the improvement of the operations.
5PROJECT EVALUATION DOCUMENTATION 4. System test, evaluation, validation, and optimisation 4.1 Melbourne Development Design Testing The new design of the Melbourne cricket ground would be helpful for making sure that the activities would be completed successfully. The implementation of the successful execution of the project scope analysis would be done based on the significant analysis of the activities for defining the project scope. The new design of the stadium would include the variables of stadium uses, location of stadium, resources allocation, and stadium capacity for the deployment of the effective standards of the stadium. The uses of the stadium would be a major factor for aligning with the implication and utilization of the successful inclusion of the operations. The location of the stadium is another major factor that would form the impact for the evolvement of the successive development management. The information development would be successively implied for easing the evolvement of the resource allocation. 4.2 Melbourne Development Design Evaluation The defining of the requirements by the client would be also considered for forming the successful evaluation of the prospects. The comparison of the output of the project with the client’s requirement list would be the final listing for the project approval or rejection. The evaluation of the Melbourne ground would be based on its multi-purpose operations. The factors of scope creep, construction works, facility extension, and management issues are the major causes of the project execution. The new design of the stadium would include the variables of stadium uses, location of stadium, resources allocation, and stadium capacity for the deployment of the effective standards of the stadium. The uses of the stadium would be a major factor for aligning with the implication and utilization of the successful inclusion of the operations. The
6PROJECT EVALUATION DOCUMENTATION location of the stadium is another major factor that would form the impact for the evolvement of the successive development management. The information development would be successively implied for easing the evolvement of the resource allocation. The stadium involves increment of the quality of the standards for dealing with the improvement of the operations. 4.3 Melbourne Development Design Validation The completion of the operations can be affected by the involvement of the unit testing for the quality operations. The appropriate quality of the things would be helpful for making sure that the completion of the project operations can be achieved successfully. The new design of the stadium would include the variables of stadium uses, location of stadium, resources allocation, and stadium capacity for the deployment of the effective standards of the stadium. The uses of the stadium would be a major factor for aligning with the implication and utilization of the successful inclusion of the operations. The stadium change would be helpful for adjusting many more events and tournaments. The redesign of the stadium has been modified several times including the pitch for making sure the stadium adjusts the event execution. A number of issues have resulted in implying changes in the design of the stadium. 4.4 Melbourne Development Design Optimisation The smooth implementation of the changes had been halted due to the occurrence of the various issues and problems. Some issues have resulted in making sure that the stadium cannot be relocated and no external changes would be implied for the execution of the project activities. The uses of the stadium would be a major factor for aligning with the implication and utilization of the successful inclusion of the operations. The stadium change would be helpful for adjusting many more events and tournaments. The redesign of the stadium has been modified several times
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
7PROJECT EVALUATION DOCUMENTATION including the pitch for making sure the stadium adjusts the event execution. A number of issues have resulted in implying changes in the design of the stadium 5. Evaluation The inclusion of the improved design development would be helpful for making sure that the Melbourne ground would not only facilitate advanced operations for cricket matches and also provide option for dealing with some other activities. The system testing and development holds an integral role in quantifying the development of the successful implication and management. The deployment of the successive management and information alignment had been helpful for takingcareofthedesigndevelopedforthecompletionofthesuccessfulinformation management. The information management can be implied for easing the information alignment and operation execution. The Melbourne cricket stadium had been renovated for supporting the increment of the international standards of the development and information alignment. The following assignment had included the analysis of the activities for aligning the information management and activity scheduling for the completion of the design. The utilization of the information processing for executing the development of the functional development can be assisted by the utilization of the information execution. The assignment had included the system testing, evaluation, validation, and optimization of the project operations for the renovation of the Melbourne cricket stadium. The information processing had been implied for taking care of the renovation works of the ground. The evaluation of the Melbourne cricket ground would be done based on the following factors, Scope Analysis:The new design of the Melbourne cricket ground would be helpful for making sure that the activities would be completed successfully. The implementation of the
8PROJECT EVALUATION DOCUMENTATION successful execution of the project scope analysis would be done based on the significant analysis of the activities for defining the project scope. The utilization of the information processing for executing the development of the functional development can be assisted by the utilization of the information execution. The assignment had included the system testing, evaluation, validation, and optimization of the project operations for the renovation of the Melbourne cricket stadium. The information processing had been implied for taking care of the renovation works of the ground. Client’s Need Definition:The defining of the requirements by the client would be also considered for forming the successful evaluation of the prospects. The comparison of the output of the project with the client’s requirement list would be the final listing for the project approval or rejection. The evaluation of the Melbourne ground would be based on its multi-purpose operations. The system testing and development holds an integral role in quantifying the development of the successful implication and management. The deployment of the successive management and information alignment had been helpful for taking care of the design developed for the completion of the successful information management. Quality Testing:The completion of the operations can be affected by the involvement of the unit testing for the quality operations. The appropriate quality of the things would be helpful for making sure that the completion of the project operations can be achieved successfully. The uses of the stadium would be a major factor for aligning with the implication and utilization of the successful inclusion of the operations. The stadium change would be helpful for adjusting many more events and tournaments. The redesign of the stadium has been modified several times including the pitch for making sure the stadium adjusts the event execution. A number of issues have resulted in implying changes in the design of the stadium
9PROJECT EVALUATION DOCUMENTATION
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
10PROJECT EVALUATION DOCUMENTATION References Alégroth,E.,Gao, Z.,Oliveira,R. andMemon,A.,2015, April.Conceptualizationand evaluation of component-based testing unified with visual gui testing: an empirical study. InSoftwareTesting,VerificationandValidation(ICST),2015IEEE8thInternational Conference on(pp. 1-10). IEEE. Alwani, R., Raby, E., West, J., Bichard, J.A. and Spencer, J., 2018. Foyle Bubbles: How can design reduce suicide attempts using everyday social and civic spaces?.DESIGN4HEALTH Melbourne 2017,1(1), pp.20-23. Callaghan, S.J., Lockie, R.G., Andrews, W.A., Chipchase, R.F. and Nimphius, S., 2018. The relationship between inertial measurement unit-derived ‘force signatures’ and ground reaction forces during cricket pace bowling.Sports biomechanics, pp.1-15. Cvjetkovic, D.D., Bijeljac, S., Palija, S., Talic, G., Radulovic, T.N., Kosanovic, M.G. and Manojlovic,S.,2015.IsokinetictestinginevaluationrehabilitationoutcomeafterACL reconstruction.Medical archives,69(1), p.21. Jamieson, K.G., Jain, L., Fernandez, C., Glattard, N.J. and Nowak, R., 2015. Next: A system for real-world development, evaluation, and application of active learning. InAdvances in Neural Information Processing Systems(pp. 2656-2664). Lazim, D., Shah, Z.A., Saedudin, R.R., Kasim, S., Azadin, A.A., Hidayat, R. and Ansari Saleh Ahmar,I.A.,2018.InformationManagementandPSMEvaluationSystem.Int.J.Eng. Technol,7(1.6), pp.17-19.
11PROJECT EVALUATION DOCUMENTATION Marschal, M., Bachmaier, J., Autenrieth, I., Oberhettinger, P., Willmann, M. and Peter, S., 2017. EvaluationoftheAcceleratePheno™systemforfastidentificationandantimicrobial susceptibilitytestingfrompositivebloodcultureinGram-negativebloodstream infection.Journal of clinical microbiology, pp.JCM-00181. Meister, D., 2014.Human factors testing and evaluation(Vol. 5). Elsevier. Meldaikyte, G., Fusari, G., Matthews, E. and West, J., 2018. ICU Journey: Humanising the patient experience of Intensive Care. Novak, J.I. and Loy, J., 2017, December. Responsive Tangible Rewards in Physical Activity Gamification. InFourth International Conference on Design4Health 2017. Centre for Design Innovation, Swinburne University of Technology. Oermann,M.H.andGaberson,K.B.,2016.Evaluationandtestinginnursingeducation. Springer Publishing Company. Owen, M.P., Duffy, S.M. and Edwards, M.W., 2014, May. Unmanned aircraft sense and avoid radar: Surrogate flight testing performance evaluation. InRadar Conference, 2014 IEEE(pp. 0548-0551). IEEE. Parra, D., Gillott, M. and Walker, G.S., 2016. Design, testing and evaluation of a community hydrogenstoragesystemforenduserapplications.InternationalJournalofHydrogen Energy,41(10), pp.5215-5229. Raby, E., Alwani, R., West, J., Bichard, J.A. and Spencer, J., 2018. Foyle Reeds: How can design reduce suicide attempts at a specific place whilst at the same time improving the experience for all?.
12PROJECT EVALUATION DOCUMENTATION Tan, M.K.B., 2017. Taking the pulse: a survey of design for health development in Singapore.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
13PROJECT EVALUATION DOCUMENTATION Yang, R., He, Y. and Zhang, H., 2016. Progress and trends in nondestructive testing and evaluation for wind turbine composite blade.Renewable and Sustainable Energy Reviews,60, pp.1225-1250.