1. Project Scope........................................................................................................................2
2. Project requirements........................................................................................................... 2
3. Network Design strategy..................................................................................................... 2
Cisco 2900 Series Integrated Services Routers..............................................................................2
Cisco Catalyst 3650 Series.............................................................................................................3
ASA 5516-X with FirePOWER Services...............................................................................3
Servers................................................................................................................................... 3
PowerEdge T630 Tower Server.............................................................................................3
Processor & Chipset...............................................................................................................4
Operating System...................................................................................................................4
Drive Bays............................................................................................................................. 4
Chassis................................................................................................................................... 4
Form Factor: 5U.....................................................................................................................4
Power..................................................................................................................................... 5
Management...........................................................................................................................5
Cisco Small Business 300 Series Wireless Access Points..............................................................5
4. Network Topology Diagram................................................................................................6
5. Detailed Network Design in Netsim....................................................................................8
6. Network device configurations..........................................................................................10
7. Router configuration......................................................................................................... 11
References............................................................................................................................... 12
1

1. Project Scope
The scope of the project is to design a network system for HiTech
Telecommunications. HiTech Telecommunications got multiple branches in multiple
locations. HiTech Telecommunications is getting the web based orders more.So
webservers needs to be setup. Chat servers needs to be set. Entire facility got chat
server too. Servers needs to be protected from web based attacks. Both LAN and
WAN should be designed.
2. Project requirements
Proper switch configuration should be there to match the LAN requirements
Proper router configuration should be there to match the WAN requirements
Web server should be configured and kept in proper location to serve LAN and WAN
users
Both wired and wireless network should be designed
Secure connections should be setup in few services.
3. Network Design strategy
Routers
Cisco 2900 Series Integrated Services Routers
Cisco 2900 series Integrated services Routers (ISR) are mainly designed for the
demands of the application, nowadays the branches have the medium sized and the
cloud based service have been evolved. The WLAN connection have high
2

performance range from above 70 megabits, and they delivers the application by a
virtualized and the collaboration as highly secured.
Switches
Cisco Catalyst 3650 Series
The network has wired and wireless have the coverage area. The operation
leads a simple work it gives the reliability that you want and gives the good
experiences to each user. The miniseries have more than 3000 to the multi gigabit of
the 3650 and the Ethernet switches has become more universal power, the mobiles
devices is start for the network and supports the needs.
4 x 10 Gigabit Ethernet with SFP+ uplinks
More than 40 UPOE ports
1100 WAC default AC power supply
Supports Catalyst Multi gigabit technology
Enhanced Limited Lifetime Warranty (E-LLW
Firewall
ASA 5516-X with FirePOWER Services
Firewall protection, VLAN support, and VPN support in a rack-mounted model used in the
Milbourn headquarters
Up to 900 Mbps FW
Multiservice capable
8 x 1 GE
1 RU
3

Servers
PowerEdge T630 Tower Server
The PowerEdge T630 Tower Server has the huge range of the drive and
workload has been demand by a simple server and gives the 2-socket of the peak to
perform and it contains more capacity of the internal storage.
Processor & Chipset
Intel® Xeon® processor E5 2600 v4 product family
Intel C610 series chipset
Operating System
Microsoft® Windows Server® 2016
Memory
64GB DDR4
Drive Bays
We are some additional resources one is Internal hard drive bay and another one is hot-plug
backplane: the below statement tells about the range of internal hard drive bay.
Up to 8 x 3.5
SAS, SATA, Near-Line SAS, SSD, and PCIe SSD.
These drives are applicable with optional flex bay.
Chassis
Form Factor:
The ECC memory, SDSC is the most important feature used in the 5U- the 5U is a type of form
factor is also contains some additional resources. SDSC stands for single device data correction
it means only one device is used for correct the fault data.
4

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Network Diagram and Hardware Details
|6
|651
|61

Designing Telecommunication Network using VLAN with File and Web Server Communication
|16
|1131
|293

Computer Networking Assignment
|16
|795
|41

Overview of Internetworking for Calasanz School
|16
|2271
|58

Network Configuration Management
|13
|1154
|56

Network Routing and Access Restrictions Tasks 2022
|16
|1836
|7