This assignment focuses on developing a Continuous Improvement Plan for Latino Engineering. It identifies five key problem areas: customer service communication, defective engineering equipment, poor design and development follow-up, long turnaround times for issue resolution, and incorrect equipment delivery. For each problem, the plan designates a responsible team member (e.g., Project Manager, Production Manager), sets a timeframe (ranging from 2 weeks to 2 months), and outlines specific goals for improvement. The overall aim is to enhance Latino Engineering's operational efficiency and customer satisfaction through effective process analysis and implementation of corrective measures.