Operational and project management: Assignment

   

Added on  2019-12-03

20 Pages3828 Words172 Views
Operational and projectmanagement

TABLE OF CONTENTSintroduction......................................................................................................................................1Part 1................................................................................................................................................11 a) Identification of the critical path and determine the latest date work should commence onsite................................................................................................................................................11 b) Gantt chart for the project....................................................................................................31 c) Identification of all the non-critical tasks and calculation of the float (free slack) on eachone................................................................................................................................................31 e) Advise the President whether or not to go ahead with the conference with justification.....4Task 2...............................................................................................................................................52 a) Calculation of total number of solar panel units are required in entire university campusdevelopment.................................................................................................................................52 b) Month-by-month delivery schedule of solar panel for every building.................................62 c) Calculation of the total cost of the SP engineers according to the initial plan.....................82 d) compare the advantages and disadvantages of using freelance contract staff withpermanent staff members.............................................................................................................8PART 3............................................................................................................................................93 a) Rescheduling of Gantt chart to accommodate the maximum production capacity of VinciSolar.............................................................................................................................................93 b) Recalculate the financial implications concerning the Solar Panel engineers that are nowrequired calculation of the savings or extra costs......................................................................113 c) From the perspective of the project manager, identify any reasons why s/he might bereluctant to accept the changes to the plan................................................................................12part 4..............................................................................................................................................134 a) A simple traffic light system according to the status of each task on the basis of planedand budgeted completion of the project.....................................................................................134 b) Assigning a second color code to each task on the basis of actual and budgetedexpenditure till completion........................................................................................................134 c) Determination of cost color code for the entire project......................................................14conclusion......................................................................................................................................15references.......................................................................................................................................16

TABLE OF FIGURESFigure 1: Network diagram for critical path analysis......................................................................2Figure 2: Project summery for start and finish date........................................................................2Figure 3: Gantt chart for whole project...........................................................................................3Figure 4: Identification of non-critical task and float calculation using detailed Gantt chart.........4Figure 5: Resource histogram for solar panel for month by month.................................................7Figure 6: Rescheduling of the Gantt chart.....................................................................................11Figure 7: Rescheduling of the solar panel.....................................................................................11LIST OF TABLESTable 1: Start and finish date for every building.............................................................................5Table 2: Total number of solar panel...............................................................................................5Table 3: Calculation of month by month delivery of solar panel for every activity.......................6Table 4: Total number of solar panel for every month....................................................................6Table 5: Calculation of the total cost of SP engineer......................................................................8Table 6: Rescheduled project plan...................................................................................................9Table 7: Allocation of solar panel before and after rescheduling..................................................10Table 8: Cost of SP engineer after rescheduling...........................................................................11Table 9: Traffic light system according to the status of each task on the basis of planed andbudgeted completion of the project...............................................................................................13Table 10: Color code system on the basis of planned and budged expenditure............................13

INTRODUCTIONOperation management of a business organization focuses on day to day strategicbusiness issues in systematic manner. In contrast, project management shed lights on planning,organizing, implementing, monitoring and controlling different activities of the project forattaining a specific goal and objective (Andersen, Dysvik and Vaagaasar, 2009). The currentresearch project is based on operation and project management and associated concepts.Regarding this it will focus on project of Utrecht Technical University (UTU). As per the giveninformation, UTU has planned to develop a brand new campus for entire university and fordeveloping campus for university contractor needs to construct six buildings. Project reportapplies different tools and techniques of project management for determining different facts andfigures of whole project. It will resolve different issues of the project using Gantt chart, networkdiagram and other tools. PART 1For developing the campus building, contractor needs to construct six building; LearningResources center, University management offices, International Business School, Science andTechnology center, The Student Village and Student and Sports center. 1 a) Identification of the critical path and determine the latest date work should commence on siteCritical path can be defined as a sequence of the different stages for determining theminimum time for completing the whole project. It is also represents the longest path for theproject. It can be presented by the network diagram (Dey, Clegg and Bennett, 2010). Criticalpath for the current project is as under:1 | P a g e

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Gantt chart for Mechanical Engineering
|27
|4312
|15

Design and Test of Solar Thermal Collector with Coil Geometries
|71
|10280
|148

PRMG-010 Project Planning and Control Teqniques
|14
|1545
|76

Project Management using MS-Project
|13
|1225
|218

Construction of a Solar Energy System: Project Management
|40
|6093
|199

Ms-Project Practical - PDF
|12
|928
|310