Parametric Estimation in Non-Engineering Projects: A Justification
Verified
Added on  2023/06/08
|5
|1150
|210
AI Summary
This report discusses the implementation of parametric estimation in non-engineering projects and justifies its use. It explores the aspects of parametric estimation and its application in non-engineering projects.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Running head: COMPLEX PROJECT MANAGEMENT Complex Project Management Name of the Student Name of the University Author Note
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
1COMPLEX PROJECT MANAGEMENT Introduction: In the report the paper that will be studied for the further discussion is the Aspect of Complexity written by Terry Cooke-Davies. The topic of the discussion in the following paper is parametric estimation. The main discussion will be made that if the parametric estimation can be implemented in the non-engineering projects like the welfare projects. A proper justification is also made for the given topic in the paper. Parametric Estimation: The process of the parametric estimation is mainly done for the projects to estimate the time and the cost. The parametric estimating technique estimates the cost and the time of the project more accurately than the other project estimation techniques. The unit of the duration and the unit of cost is used to determine the parametric estimating (Babadi & Brown, 2014). In this paper of the Terry Cooke-Davies Aspect of Complexity the author discusses the aspects of parametric estimating. There are many aspect that the parametric estimating have discussed below: ï‚·Identification cost of the parametric estimation and then send back to the return on investment (ROI). ï‚·Assumptions and the limitations are done. ï‚·Previous project data is collected and then the data is included in the data of design, cost data, schedule data and in the technical data (Brockwell & Schlemm, 2013). ï‚·Data of the previous project which is collected then normalized production rate, economics, quantities, and for the measurement of the units. ï‚·The variables that are independent are then related to the drivers of the cost of project.
2COMPLEX PROJECT MANAGEMENT ï‚·A hypothesis is formulated based on the independent variable. ï‚·The hypothesis is tested significantly so that the significance of the data will be easily determined. ï‚·The estimation of the cost is documented for using it further. From the given article it only shows the aspects of the parametric estimating in the contextoftheengineeringprojects.Intheimplementationoftheparametric estimation many kind of maturity models of the technology are used (Guo et al., 2014). From the assessment of the parametric estimating aspect it can be said that this techniques can be used in the non-engineering project also. Justification of the Assessment: In the above paper the discussion is made on the parametric estimation and a statement is also given that the parametric estimation can be used in the non-engineering domain also like the welfare projects. The project is only able to use the technique of the parametric estimating if the project met the requirement to adapt the technology. In the current scenario every project need to estimate a proper duration and time so that the project will be able to complete successfully and efficiently as per the estimation (Martin & Pham, 2015). Different various kind of estimation process is used in the projects to measure the budget and the timeline of the project. Whether a project is of engineering domain or non- engineering domain every project must identify its required time and the cost. When a project is having these data then the parametric estimating can be taken into consideration. The parametric estimating will first take these data from the project then a data normalization will be done on those data need of that project as per the. Then on this collected data a hypothesis will be generated (Ahern,Leavy & Byrne, 2014). The hypothesis will be able to help the project to identify the time of development and the budget for the non-engineering project.
3COMPLEX PROJECT MANAGEMENT The non-engineeringproject aspects are not similar like the engineering project.The technologies that are used in the both kind of project are also different. The engineering project consist more of the technical work and the non-engineering projects have less technical work required in them. Differences are there but there are similarities also present on the engineering and non-engineering projects. Development time and development cost is present on the both project because both of the projects are highly dependent on these two factor (Kerzner, 2017). The suppliers of the material and the process manufacturer for the both domain are more or less same. In the article of the Terry Cooke-Davies stated that in every project the main issues generated with the technologies that are used in the project. Assumptions and the limitations are also made in the projects of the non-engineering. Previousnon-engineeringprojectdataaregatheredandthennormalizedasperthe requirement of the project. These are the main aspect that allows the parametric estimating to implement in the domain of non-engineering (Cooke-Davies,2011). Conclusion: It can be concluded from the above report that the parametric estimating can be implemented in the projects of the non-engineering domain. In the both kind of domain parametric estimation works in a similar way.