1PHL WEBSITE DEVELOPMENT Table of Contents 1.0 Introduction..........................................................................................................................3 1.1 Purpose of the report........................................................................................................3 1.2 Scope of the report...........................................................................................................4 2.0 Location................................................................................................................................5 3.0 Period...................................................................................................................................6 4.0 Requirements........................................................................................................................6 5.0 Acceptance Criteria..............................................................................................................9 6.0 Conclusion............................................................................................................................9 7.0 References..........................................................................................................................10
2PHL WEBSITE DEVELOPMENT 1.0 Introduction PHL means Pashendale holdings limited are the Australian construction company who planned some important work strategy for enhancement of their business project and marketing strategy. Virna pashendale who is the CEO of this company he helps to complete this strategic plan. This approaches is mainly upgrading the new customers and also enhance their market value externally. CEO approved company’s website development project which mainconceptismadenewwebsiteaboutcompanydetails,developmentsandbasic information.Thiscompanyhasno internalInformationtechnologydepartmenttesting department or other implementation sections. That is the reason PHL cannot include their work scopes, projects and other execution on their internal official sites. For the design and definition phase of this work the worker starts work with Passchendaele holdings limited to collected criteria after gathered all information the web developer include this in the website. This website designer complete all work as per web requirement. Contractor complete this work at 11.59 pm on the last day of project (Anderson,2016). The chief marketing Officer Sennveasna Naveen and her teams ensures the complete this project as soon as possible. Primary estimating cost of this project is designing 145 000 dollar, planning 30000dollar Implementations and conversion estimation total 90000 dollar. 1.1 Purpose of the report PHL CEO approved the website development project and the basic purpose of this project is to make the new website where include basic information of PHL like new project development, company news, Information of industry, Network platform. This website must be helpful for the PHL client and this is closely connected to develop the solution. For the improvement of customer interaction this web project plays the biggest role and the website provides some options like customer feedbacks which is importantly unique for this business
3PHL WEBSITE DEVELOPMENT purpose(Ashforthand Schinoff,2016). This company has not any internal designing, training, testing, IT, implementation facilities .They outsourced this facilities. That is the main reason the web developer cannot include this basic information like designing, testing, training to their internal webpage. 1.2 Scope of the report The scope of this work for this web project are incorporated with this basic information like implementations, testing, training and designing. This parts are not internal part of this company so the web developer cannot include this information. The web developer try to include all external data like this and properly implemented this new website. Each and every project are consists the special tasks(Hirschand Rajpal,2014).This tasks should be performed by the web contractor perfectly. In the first phase is the planning phase the developer create and describes the upcoming project details of PHL, work structure, training procedure and implementation structure clearly(Zhouet al., 2014). Mainly the requirement of web developer are PHL present project plan, their approval and review. In the second phrase the designing and definition section of this project. In this section, the developer collected the all primary data regarding PHL. The designer complete all programming for the web designing approval .When the authority provides all detail information and plans then the developer redesigned this all as soon as possible. Not only that web contractor resolves all issues like websites coding, testing, updating. In every week two authority organized a meeting about the weekly website status. Next phrase is the implementation phrase. The web developer implemented newly designed webpage and this website running every day and every weak like 24*7 and PHL authority also monitors the total web page working in a whole time until the project end.The developer must then give training in accordance with the perfect training plan(Khatib,2016). As with the description and model phase, the developer is required to provide PHL with a written
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
4PHL WEBSITE DEVELOPMENT status update in weekly meetings to be held between the two authorities. Next phrase is the conversion phrase where the developer provides PHL with all data with authenticated project plan and now a project end report to PHL and approval. The contractor complete the project needed checklist showing all project works have been ended the contractor is needed to provide PHL with a written status update. 2.0 Location Latest projectof PHL Company is spreading in whole AustralialikeSydney, Melbourne, Adelaide and Brisbane. There are some locations in Sydney in Ross road, Macquarie Park this industrial warehouse is occupy135 to 250 sq. meter area and there are 20 small units. Other project is selling in Taylor Street, Parramatta it is a very small commercial complex which is occupied the quality tenant. Some Da approved development sites are completed by the PHL in Penrith, fingal road. In Melbourne this company purchased some good property in Lilydale, Pitt Street, and Ring hood’s royal hotel. All are very much oldest propertyandtheypurchasethisforcommercialuse.InFirstavenuenorthAdelaide pashendale purchases for 40 million dollar but currently they negotiating for the purchase range and this offer made by trust named willow tree trust. In a Good wood station terrace PHL negotiating with a value of purchaser and considering the offer made by the Tripping Point Ltd. In a Findon parking Centre PHL negotiating with a range and considering the offer by Oracle Property fund. This project of PHL which is located in Gumdale Brisbane they purchase this eight years ago but for the internal issues they sell this but negotiating with Willmar holdings for the purchase cost. Five years ago PHL company purchased winnow waterpark but now this is not fitted the modern strategic plan of PHL so they try to sell it (Danielsonet al.,2016). The negotiation is continue currently between PHL and Phillips Rinker limited. The most of the project are purchased by PHL before previous some year but now they are negotiating for the selling price in other company.
5PHL WEBSITE DEVELOPMENT 3.0 Period At first this project is release their statement on 2018, 5th September. After reviewing this project the web developer selected this in 26thSeptember, 2018. The implementations of this project must be completed in December 5th, 2018. Employees of PHL completed this training within one week. This project closed on Christmas evening and the reviews of this project performed one week before 25thDecember 2018. 4.0 Requirements The project that deals with the overall development of the website of the organization ofPHLdealswiththefactofmanyspecialtoolsthatwillefficientlycarryoutthe developmentprocedure.Moreover,thedevelopmentofawebsiteneedsanumberof requirements that are to be adhered by the management of the PHL to effectively maintain their website for the different purposes(Khosraviet al.,2014). For these instances, the proper methodology for the collection for the data has to be determined by following exact procedures within the organization of PHL. In addition to this, the secondary collection of data has also to be adhered for the proper development of the data within the organization of PHL(Sultan,2015). For adhering both, the analysis of the collection of data the proper features which are to be implemented has to be done by the website management team that are present within the organizational premises of PHL(Xu,2015). The clients, which are associated with the development of the data has to conduct effective meetings by the website development team, which will help the organization to carry out the development procedure in an effective time(Kosinskiet al.,2014). In this case, there are certain phases that are to be adhered by the organization for carrying out the data analysis as well as the steps that are to be taken for the management of the website in the development of the website for the organization. These phases are to be clearly discussed by adhering certain meetings along with the clients as well as effective client interactions in regards to the fact that the planning
6PHL WEBSITE DEVELOPMENT phase of the development of the website can be effectively stated for the enhancement of the website in regards to the stated organization. The overall planning as discussed by holding the client meetings has to be properly assimilated by the CEO of the organization as well as the project managers that are related with the overall development of the website(Lu, Xuand Xu,2014). The overall stages, which are adhered, for the organization of PHL is clearly stated within the organization right from the initiation as well as execution of the website development process. The first significant part that is adhered by the organization in regards to the development of the website states the fact of the initiation procedure. This initiation procedure will be the phase that will properly identify the overall upcoming phases along with the phase of planning, designing, testing as well as implementation(Kibert,2016). These phases are mainly adhered by the planning committee of the PHL organization thus adhering the design of the overall website design within the PHL organization. The planning phase is the next significant phase of the website development project in regards to the PHL organization. In this phase there are significant decisions that are to be adhered by the organization’s website development team(Nurse,Phamand Mokhtarzada, 2016). Moreover, the planning phase also deals with the overall organization of the project that will be adhered by the website development team of the stated organization. The next phase is depicted as the planning phase in which the overall planning of the project is to be carried out in regards to the project plan as well as the budget assigned with the project. Moreover, the planning phase also deals with the overall risks that are associated with the project completion(Sears et al.,2015). The planning phase is the significant phase for the overall planning of the project as well as carrying out the execution of the project.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
7PHL WEBSITE DEVELOPMENT The next significant phase is stated as the designing phase. In this phase, the overall design of the redevelopment of the project is to be carried out after the proper evaluation of the requirements as stated by the client and the things that are being confirmed with the overall meetings within the website development team of the PHL organization(Wanget al., 2014). The next is the execution procedure that may be depicted with the time lining of the project, which is depicted within the figure as stated below: IDTask Mode Task NameDurationStart 0PHL Website Development Plan467 daysMon 05-08-19 1Project Initiation47 daysMon 05-08-19 2Understanding the designing and planning 10 daysMon 05-08-19 3Preliminary data analysis12 daysMon 19-08-19 4Secondary Data analysis15 daysWed 04-09-19 5Datat Analysis of the collected data 10 daysWed 25-09-19 6Project Planning79 daysWed 09-10-19 7Neccessity of the project19 daysWed 09-10-19 8Signficant identification of the project 10 daysTue 05-11-19 9Describing the overall objective20 daysTue 19-11-19 10Identifying the goal30 daysTue 17-12-19 11Project Execution223 daysTue 28-01-20 12Selection of the overall resources5 daysTue 28-01-20 13Selection of the overall options as well as the efficient backup 50 daysTue 04-02-20 14Compliance requirements31 daysTue 14-04-20 15The module of VPN26 daysWed 27-05-20 16Differentiating segments of the overall procedure 28 daysThu 02-07-20 17Phases depiction15 daysTue 11-08-20 18Budgeting23 daysTue 01-09-20 19The appropiate strategy measures21 daysFri 02-10-20 20Security counter measures24 daysMon 02-11-20 21Monitoring of the overall project59 daysFri 04-12-20 22Comparison of the overall outcomes 29 daysFri 04-12-20 23Integration of the data30 daysThu 14-01-21 24Project Closure59 daysThu 25-02-21 25Assessment of the risks29 daysThu 25-02-21 26Assessment of the budget30 daysWed 07-04-21 SMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFS 22 Jul '1929 Jul '1905 Aug '1912 Aug '1919 Aug '1926 Aug '19 The below picture depicts the WBS regarding the following project: Project Initiation Understanding the designing and planning Preliminary data analysisSecondary Data analysisDatat Analysis of the collected data Project Planning Neccessity of the projectSignficant identification of the project Describing the overall objective Identifying the goal Project Execution Selection of the overall resources Selection of the overall options as well as the efficient backup Compliance requirementsThe module of VPNDifferentiating segments of the overall procedure Phases depictionBudgetingThe appropiate strategy measures Security counter measures Monitoring of the overall project Comparison of the overall outcomes Integration of the data Project Closure Assessment of the risksAssessment of the budget
8PHL WEBSITE DEVELOPMENT The next phases concludes the overall closure of the project that will enhanced carryout the overall closure of the project after proper evaluation as well as the testing of the website thus developed. After this phase, the project will be carried out within an effective basis within the environment of the PHL organization. 5.0 Acceptance Criteria The organization of PHL possess different types of variables that are to be used for accepting the highly valued project of the website redevelopment of the project. Moreover, the significant criteria is stated as the accessibility of the clients. The demand of the client needs to be adhered for the overall execution of the procedures(Palacios-Marqués,Soto- Acostaand Merigó,2015). Thus, the significant acceptance criteria is stated to be the important communication skills in between the development team as well as the clients of the organization. In addition to this, the budget is also a significant acceptance criterion that is to be adhered by the organization for the success of the project. If these two criteria are not adhered then the project may be depicted not be successfully complete. 6.0 Conclusion Thus, the overall report states that the organisation of PHL is set to determine the redevelopment procedure for the website development of their respective organization. Moreover, the overall procedures that the organization will be going through is well stated in the report for the statement of the work is depicted in the report. Thus, it can be concluded that the organization of the PHL will be very helpful by the redevelopment of the website by adhering the procedures as well as the budget that are stated within the report.
9PHL WEBSITE DEVELOPMENT 7.0 References Anderson, D.L., 2016.Organization development: The process of leading organizational change. Sage Publications. Ashforth, B.E. and Schinoff, B.S., 2016. Identity under construction: How individuals come to define themselves in organizations.Annual Review of Organizational Psychology and Organizational Behavior,3, pp.111-137. Danielson, C.K., McCauley, J.L., Gros, K.S., Jones, A.M., Barr, S.C., Borkman, A.L., Bryant, B.G. and Ruggiero, K.J., 2016. SiHLE Web. com: Development and usability testing of an evidence-based HIV prevention website for female African-American adolescents. Health informatics journal,22(2), pp.194-208. Hirsch, S. and Rajpal, S., Media Direct Inc, 2014.Systems and methods for creating or updating an application using website content. U.S. Patent 8,788,935. Khatib, J. ed., 2016.Sustainability of construction materials. Woodhead Publishing. Khosravi, Y., Asilian-Mahabadi, H., Hajizadeh, E., Hassanzadeh-Rangi, N., Bastani, H. and Behzadan, A.H., 2014. Factors influencing unsafe behaviors and accidents on construction sites: a review.International journal of occupational safety and ergonomics,20(1), pp.111- 125. Kibert, C.J., 2016.Sustainable construction: green building design and delivery. John Wiley & Sons. Kosinski, M., Bachrach, Y., Kohli, P., Stillwell, D. and Graepel, T., 2014. Manifestations of user personality in website choice and behaviour on online social networks.Machine learning,95(3), pp.357-380.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
10PHL WEBSITE DEVELOPMENT Lu, Y., Xu, X. and Xu, J., 2014. Development of a hybrid manufacturing cloud.Journal of Manufacturing Systems,33(4), pp.551-566. Nurse, J.M., Pham, D.K. and Mokhtarzada, D.H., Cimpress Schweiz GmbH, 2016.Website image carousel generation. U.S. Patent Application 14/990,215. Palacios-Marqués, D., Soto-Acosta, P. and Merigó, J.M., 2015. Analyzing the effects of technological, organizational and competition factors on Web knowledge exchange in SMEs. Telematics and Informatics,32(1), pp.23-32. Sears, S.K., Sears, G.A., Clough, R.H., Rounds, J.L. and Segner, R.O., 2015.Construction project management. John Wiley & Sons. Sultan, S.E., 2015.Organism and environment: ecological development, niche construction, and adaptation. Oxford University Press, USA. Wang, W., Liu, H., Li, Y. and Su, J., 2014. Development and management of land reclamation in China.Ocean & Coastal Management,102, pp.415-425. Xu,K.,2015.Directmodelingforcomputationalfluiddynamics:constructionand application of unified gas-kinetic schemes. Zhou, X., Xia, Y., Ren, X., Chen, Y., Huang, L., Huang, S., Liao, B., Lei, Y., Yan, L. and Jiang, H., 2014. Construction of a SNP-based genetic linkage map in cultivated peanut based on large scale marker development using next-generation double-digest restriction-site- associated DNA sequencing (ddRADseq).BMC genomics,15(1), p.351.