This presentation analyzes contract and procurement management strategies for the expansion of the Central Queensland University (CQU) Melbourne campus. It explores various procurement methods, including traditional, design and build, management contractor, and construction management, evaluating their advantages and disadvantages. The presentation recommends the management contractor procurement method, highlighting its suitability for the project's quality, time, and cost factors. It discusses the benefits of design flexibility, competitive tendering, and the selection of a fixed price or lump sum contract type. The presentation emphasizes the role of the management contractor in coordinating pre-construction and construction activities, managing risks, and ensuring the project's successful execution. References from various academic sources support the analysis and recommendations.
Document Page
BY
NAME
INSTITUTIONAL AFFILIATION
PRESENTATION ON CONTRACT AND
PROCUREMENT MANAGEMENT
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
OUTLINE OF PRESENTATION
INTRODUCTION
METHODS
DISCUSSION
ADVANTAGES/DISADVANTAGES
CONTRACT TYPE
CONCLUSION
REFERENCES
Document Page
INTRODUCTION
As the Construction manager of PPMP20011 Contract and
Procurement , there is need of providing in-depth and good advices
in terms of:
Cost
Quality
Time
This method will be involved during the expansion construction of
Central Queensland University campus to meet the increasing
number of students and also provide a suitable university lie within
the Melbourne campus
Document Page
METHODS
Procurement Routes
Some of the procurement method that can be used by the CQU to ensure
quality, cost, and time in their project include:
Traditional Procurement Route
Design and Build Procurement Route
Management Contractor Procurement Route
Construction Management Method
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Traditional Procurement Route
Advantages
Easy to value and arrange
Well-known procedures
Price certainty
Competitively fair
Disadvantages
Reduced cost and time
No input of contractor
Longer duration
Document Page
Design and Build Procurement Route
Advantages
Reduced duration
Design flexibility
Potential cost saving
Quality and time
Disadvantages
Fixed cost
Not good for inexperienced clients
Lack of specialist
Document Page
Management Contractor Procurement Route
Advantages
Reduced duration
Price certainty
Quality
Reduced cost
Design flexibility
Design flexibility Disadvantages
Fixed cost
Lack of available specialist
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Construction Management Route
Advantages
Reduced duration
Price certainty
Quality
Reduced cost
Design flexibility
Design flexibility
Disadvantages
Fixed cost
Lack of available specialist
Document Page
DISCUSSION
Selected Route: Management Contractor Procurement Method
The traditional procurement method could have been an option in the Central Queensland
University (CQU) project.
This procurement method is only good for quality project, flexibility in design, specialist
contractors.
This management contractor method enables some work contracts to be tendered earlier than others,
and sometimes, even before the completion of design.
The competitive tendering of each construction element by the management contractor on behalf of
the client.
This will ensure that the company attain the best prices across the board for all the tenders hence
reducing the construction cost of the project.
Document Page
Management contractor procurement method has been preferred as the most
suitable procurement method for the construction of Central Queensland
University (CQU) project since the method satisfies:
The quality factor
The time factor
The cost factor
This method gives the provision of design flexibility which allows changes in
the design to improve quality of the project.
The enables some work contracts to be tendered earlier than others, and
sometimes, even before the completion of design.
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
ADVANTAGES
This method also gives the provision of design flexibility which allows
changes in the design to improve quality of the project.
The contractor only selects the best design specifications that meets the
required client demand
The management contractor will be acting as a principal such that no
contractor can make direct claim to the client in case the management
contractor becomes insolvent.
Document Page
The management contractor has powers to terminate the contract made by
suppliers of construction elements although there are potential implications on
the construction cost especially when contractors fail to deliver materials or
services.
The management contractor covers both the construction and pre-construction
activities.
This includes all the contracts and risks which will all be moved by the
employer to the management contractor.
The management contractor is appointed by the employer previously in the
process of design due to their experience and management skills which can be
applied in the improvement of the buildability.