This presentation provides an in-depth understanding of contract and procurement management. It covers various procurement routes, including traditional, design and build, management contractor, and construction management. The advantages and disadvantages of each method are discussed. The presentation concludes with the selection of the management contractor procurement method for the construction of Central Queensland University (CQU) project. Suitable for the PPMP20011 course at Central Queensland University.

Contribute Materials

Your contribution can guide someone’s learning journey. Share your documents today.
Document Page
BY
NAME
INSTITUTIONAL AFFILIATION
PRESENTATION ON CONTRACT AND
PROCUREMENT MANAGEMENT

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
OUTLINE OF PRESENTATION
INTRODUCTION
METHODS
DISCUSSION
ADVANTAGES/DISADVANTAGES
CONTRACT TYPE
CONCLUSION
REFERENCES
Document Page
INTRODUCTION
As the Construction manager of PPMP20011 Contract and
Procurement , there is need of providing in-depth and good advices
in terms of:
Cost
Quality
Time
This method will be involved during the expansion construction of
Central Queensland University campus to meet the increasing
number of students and also provide a suitable university lie within
the Melbourne campus
Document Page
METHODS
Procurement Routes
Some of the procurement method that can be used by the CQU to ensure
quality, cost, and time in their project include:
Traditional Procurement Route
Design and Build Procurement Route
Management Contractor Procurement Route
Construction Management Method

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Traditional Procurement Route
Advantages
Easy to value and arrange
Well-known procedures
Price certainty
Competitively fair
Disadvantages
Reduced cost and time
No input of contractor
Longer duration
Document Page
Design and Build Procurement Route
Advantages
Reduced duration
Design flexibility
Potential cost saving
Quality and time
Disadvantages
Fixed cost
Not good for inexperienced clients
Lack of specialist
Document Page
Management Contractor Procurement Route
Advantages
Reduced duration
Price certainty
Quality
Reduced cost
Design flexibility
Design flexibility Disadvantages
Fixed cost
Lack of available specialist

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Construction Management Route
Advantages
Reduced duration
Price certainty
Quality
Reduced cost
Design flexibility
Design flexibility
Disadvantages
Fixed cost
Lack of available specialist
Document Page
DISCUSSION
Selected Route: Management Contractor Procurement Method
The traditional procurement method could have been an option in the Central Queensland
University (CQU) project.
This procurement method is only good for quality project, flexibility in design, specialist
contractors.
This management contractor method enables some work contracts to be tendered earlier than others,
and sometimes, even before the completion of design.
The competitive tendering of each construction element by the management contractor on behalf of
the client.
This will ensure that the company attain the best prices across the board for all the tenders hence
reducing the construction cost of the project.
Document Page
Management contractor procurement method has been preferred as the most
suitable procurement method for the construction of Central Queensland
University (CQU) project since the method satisfies:
The quality factor
The time factor
The cost factor
This method gives the provision of design flexibility which allows changes in
the design to improve quality of the project.
The enables some work contracts to be tendered earlier than others, and
sometimes, even before the completion of design.

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
ADVANTAGES
This method also gives the provision of design flexibility which allows
changes in the design to improve quality of the project.
The contractor only selects the best design specifications that meets the
required client demand
The management contractor will be acting as a principal such that no
contractor can make direct claim to the client in case the management
contractor becomes insolvent.
Document Page
The management contractor has powers to terminate the contract made by
suppliers of construction elements although there are potential implications on
the construction cost especially when contractors fail to deliver materials or
services.
The management contractor covers both the construction and pre-construction
activities.
This includes all the contracts and risks which will all be moved by the
employer to the management contractor.
The management contractor is appointed by the employer previously in the
process of design due to their experience and management skills which can be
applied in the improvement of the buildability.
Document Page
The client gives the management contractor the
responsibility of performing both the construction and pre-
construction activities such as:
Site management
Monitoring key performance indicators
Site coordination
Cost planning
Acting as the principal contractor
Coordinating and managing works contracts
Tendering works contracts

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
DISADVANTAGES
Client makes the impossible decision of selecting a
management contractor
Lack of suitable specialists
Not suitable for unexperienced
Contractor takes full responsibility clients
Document Page
CONTRACT TYPES
The best contract types for this project is Fixed Price or Lump Sum type of
contract.
In this types of contract, a total fixed priced for all the activities related to the
construction process.
Lump Sum is very suitable since the project has a clear scope of the project
since the University has made it clear that they wish to expand CQU and the
project will involve main lecture, laboratories, a motel, and conference hall
Document Page
CONCLUSION
The selected procurement method for the construction of Central Queensland
University (CQU) project is the management contracting since the method
satisfies the quality, time, and cost factors.
The PPMP20011 Management Consultant Company may act as the
management contractor and will perform activates such as:
Site management and site coordination
Cost planning
Coordinating and managing works contracts

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
REFERENCES
Dada, M., 2013. Frequency of conflicts in construction project procurement: A
correlation analysis. International Journal of Construction Supply Chain
Management, Volume 3, pp. 1-15.
Fenn, P., 2012. Introduction to Building Procurement. Construction Management and
Economics, Volume 30, pp. 493-494.
Gandu, Y., Chindo, G. & Ali, A., 2011. Bidding model for sustainable projects using
the traditional procurement method. Information Manager (The), Volume 9.
Goel, A., 2016. Understanding pre-qualification preferences of public clients in
traditional and design-build procurement systems. International Journal of
Procurement Management, Volume 9, p. 684.
Goel, A., 2018. Analysing contractor prequalification criteria in construction: new
insights through interpretive structural modelling. International Journal of
Procurement Management, Volume 11, p. 667.
1 out of 17
[object Object]

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]