This discussion explores the strategic value, impact on society and environment, and leadership lessons from the Mumbai Metro project, highlighting the benefits of private public partnership in project development. It also discusses the demand for the project, stakeholder involvement, and scopes for improvement.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Running head: PRIVTE PUBLIC PARTNERSHIP IN PROJECT Private Public Partnership in Project Name of the Student: Name of the University: Author Note:
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
1 PRIVTE PUBLIC PARTNERSHIP IN PROJECT Table of Contents Introduction................................................................................................................................2 Discussion..................................................................................................................................2 Strategic value for the project and the demand with projected benefits of the stakeholders.2 Impact and society and environment......................................................................................3 Leadership lessons learnt from the project.............................................................................4 Conclusion..................................................................................................................................4 Bibliography...............................................................................................................................6
2 PRIVTE PUBLIC PARTNERSHIP IN PROJECT Introduction The public private partnership in the infrastructure can improve the development of the project. Apart from that the capital can be gathered in an easy way through this kind of partnership. In this context, of private-public partnership is the construction of Mumbai Metro project. In this paper, the demand of the project and the benefits of the project will be discussed. Apart from that the impact of the metro project in the environment and the society will be evaluated through the discussion. At the end the scope for the improvement of the project will be presented along with the lessons learnt from the project. The conclusion is drawn from the facts presented in the discussion. Discussion Mumbai metro development project is the example of pubic private partnership in the infrastructure project. The estimated time period for the project is 15 years. There are different lines of Mumbai metro. Line 1 of Mumbai Metro system will be operated by Metro One Operation Private Limited. This company is a joint venture between RATP Dev Transdev Asia and Reliance Infrastructure. On the other hand line 2,4,6,7 are under the control of MMRDA. Line 3 will be built by Mumbai Metro Corporation Limited. It has been seenthatthereareinvolvementofthemanystakeholdersandthepartnersforthe development of the whole project. Strategic value for the project and the demand with projected benefits of the stakeholders The development of the metro in Mumbai will help to improvement of the public transport in this metropolitan city. Apart from that the use of both the railway and metro will bring the flexibility in the transportation system of the organization.
3 PRIVTE PUBLIC PARTNERSHIP IN PROJECT The stakeholders in the project are the organization which are directly or indirectly involved in the development of the project. There are seven stakeholders involved in the development of the project. This also includes the government organization. Apart from that the common people are also included in the stakeholder list As there are 7 organizations bagged the Metro rail project, it has become easier for the Government of Maharashtra to collect the required capital for the investment. Apart from that with the increasing number of transports the common people can avail the flexibility of the system. The demand from the project requires large amount of capital. The investment of the 7 companies in the organization have made it possible to manage the large capital investment. Impact and society and environment The development of the Mumbai Metro railway project has certain impacts on the society and environment. The society will be benefitted as it will help to deliver the better transportation service. On the other hand, the people can visit the distance places in a short period of time. Apart from that one of the biggest problem people face during the mega block of the railway. The railway service get delayed due to this track maintenance initiatives. During the mega block, the use of metro rail can become a convenient option for the people. On the other hand the development of the Mumbai metro can have the negative impact on the environment. During the development process, the consumption of the energy will be high. This will eventually increase the carbon footprint during the process. Apart from that during the running of the metro rail large amount of energy will be used for that reason that environment can get affected in a negative way. If the triple bottom line approach is applied in the context of Mumbai metro rail construction, it can be said among the three factors in the triple bottom line context social and economic factors can get benefitted from the construction of metro railway. However,
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
4 PRIVTE PUBLIC PARTNERSHIP IN PROJECT environment can badly get affected during the plying of metro rail. There is a chance that the environmental factor may be overlooked during the planning phase of the project. During the execution of the project, maintaining the environment is needed to be done. In this case, the designing of the engine and the infrastructure are needed to be developed in a way that it consumes less energy during plying. Apart from that all the requirements regarding acquiring of the land for the project and maintaining legal aspects of the project are needed to be maintained in a proper way. These are regarded as scopes for improvement of the project. Leadership lessons learnt from the project There are some leadership lessons those can be learnt from the development of the metro railway for Mumbai. The main challenge for leader for this kind of project is maintaining the complexity of the project in a proper way. The execution phase of this project is going to be complex as there are construction of different lines present in this project. The main challenge for the project leader is make the team members to manage to do the work in different modules. The compilation of the modules are needed to be done within the deadline. Apart from that managing the capital is another challenge for the project leader as there are seven investors involved in the project. The leadership lesson that is learnt from this project is that the leader leading the complex project needs good analytical skills so that he or she could coordinate among the different functionalities in the project. Conclusion The discussion is regarding managing the projects of Mumbai Metro Railway. It has been seen that the involvement of the stakeholder is a higher degree level for this project. Apart from that the proper compilation of this kind of complex project needs excellent
5 PRIVTE PUBLIC PARTNERSHIP IN PROJECT supervision. It can be said from the discussion that the presence of more than one project management leader is needed for the compilation of this kind of project. Apart from that proper management of the funding and the analysis of the risk management are needed to be concerned about at the beginning of the project. There are certain adverse environmental impact for this project which is needed to be mitigated a certain level.
6 PRIVTE PUBLIC PARTNERSHIP IN PROJECT Bibliography Bhutani, R., Ram, S. and Ravinder, K., 2016. Impact of metro rail construction work zone on traffic environment.Transportation Research Procedia,17, pp.586-595. Chandel, M.K., Padmanabhi, R. and Dixit, A.K., 2017. Mitigation Policy Packages For Transport Sector-Mumbai Metropolitan Region. Kulshreshtha, R., Kumar, A., Tripathi, A. and Likhi, D.K., 2017. Critical success factors in implementation of urban metro system on PPP: A case study of hyderabad metro.Global Journal of Flexible Systems Management,18(4), pp.303-320. Muthusamy, S. and Priyadharshini, J., 2016. A Study on High Speed Rails in India. Sharma, R. and Newman, P., 2018. Can land value capture make PPP's competitive in fares? A Mumbai case study.Transport Policy,64, pp.123-131. Shirke, C., Joshi, G.J., Kandala, V. and Arkatkar, S.S., 2017. Transit Oriented Development and Its Impact on Level of Service of Roads & METRO: A Case Study of Mumbai Metro Line-I.Transportation research procedia,25, pp.3035-3054. Soni, A.R. and Chandel, M.K., 2018. Assessment of emission reduction potential of Mumbai metro rail.Journal of cleaner production,197, pp.1579-1586. Zhao, H., Ren, B. and Wang, T., 2018, December. Analysis and Evaluation of the Beijing MetroProjectFinancingReforms.In2018InternationalConferenceonManagement, Economics, Education, Arts and Humanities (MEEAH 2018). Atlantis Press.