In this docx we will discuss about business opertions  and bleow are the summaries point:- To review the programme leadership of the company, it is essential to consider the overall business operations of the enterprise. The company needs to evaluate the whole business process as well as the strategy and mission before launching or defining any new projects. Jurys Inn Islington London is a famous tourist attraction in London, providing high-quality services and extraordinary food quality. The mission is to be the preeminent global hospitality company and the first choice of guests, while the vision is to provide quality services to the customers following the standards of the hospitality industry. The major stakeholders of the project of Jurys Inn are the HR manager of the hotel, the operation manager, the board of directors, the government, the shareholders, the staff members, etc. The shareholders and investors can question the overall expenses in the new launching of the product and possess concise behavior about their fund in both the cases of success and failure of the project. The board of directors is required to provide approval regarding the development of the new restaurant project. The programme of launching the new rooftop restaurant requires a high amount of investment and budget, and stakeholders are concerned about the funds in case the project fails.
tabler-icon-diamond-filled.svg

Contribute Materials

Your contribution can guide someone’s learning journey. Share your documents today.
Document Page
TABLE OF CONTENTS
TABLE OF CONTENTS.................................................................................................................................2
INTRODUCTION............................................................................................................................................3
TASK 1............................................................................................................................................................3
Analysis of the business strategy of Jurys Inn.........................................................................................3
1.2 Negotiation with stakeholders............................................................................................................6
TASK 2............................................................................................................................................................9
Plan for the programme of projects..........................................................................................................9
TASK 3..........................................................................................................................................................11
2.1 Leading the coordination of the programme....................................................................................11
2.2 Management of resources................................................................................................................11
2.3 Review and monitoring of the projects............................................................................................12
2.4 Programme process and Results to Stakeholders.............................................................................13
2.5 Closing the program and projects....................................................................................................14
TASK 4..........................................................................................................................................................15
3.1 Assessing the success of projects with project managers.................................................................15
3.2 Review of the success of the Program.............................................................................................16
3.3 Areas for Improvement in Future Program Management and Leadership.......................................17
CONCLUSION..............................................................................................................................................18
REFERENCES...............................................................................................................................................19
1
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
INTRODUCTION
To enhance the efficiency and publicity of the organization, it is necessary to involve
various projects in the business operation. By selecting appropriate project plans, the relevant
competencies can easily be boosted. The present report gives a concise analysis of programme
leadership. This management practice aims to lead different types of plans to realize corporate
programs (Bryde, 2003). To provide respective business examples, the assignment will present
some of the business practices of Jurys Inn Islington London. As one of the biggest chains of
hotels in the United Kingdom it offers several facilities to their customers and is currently
undertaking different programmes.
TASK 1
Analysis of the business strategy of Jurys Inn
To review the programme leadership of the company, it is essential to consider the overall
business operations of the enterprise. It is critical to establish the appropriate set of projects to
generate the highest possible benefits for the company and for its brand image. Before launching
or defining any new projects, the company needs to evaluate the whole business process as well
as the strategy and mission (Eve, 2007). Jurys Inn Islington London is one of the famous tourist
attractions in London, and provides high-quality services with extraordinary food quality. In
order to attain the mission and vision of the company, they need to recruit and retain a highly
skilled workforce. The mission of the business is to be the preeminent global hospitality company
as well as the first choice of guests. According to their vision statement, they want to provide
quality services to the customers following the standards of the hospitality industry. In order to
achieve the set mission and vision in their hotel, particular objectives are developed by the
organization. With this focus, the firm can provide quality services to their customers.
Nowadays, people are much more conscious about leisure activities. The organizations
that operate in the hospitality sector focus on the needs of the customers. Further, they provide
services in agreement with their requirements so that customers can be satisfied in an efficient
manner. With the help of proper market research, they can prepare to meet the different purposes
of the visitors. It is much more important for the hotel industry to give sufficient services to all
the clients. With the assistance of greater facilities they can stay and spend a pleasant time within
the hotel (Seong, 2013). Increasing competition in the hospitality industry hampers the efficiency
2
Document Page
level of the business in a different manner. In order to analyze their business strategy Porter’s five
force model can be taken into consideration. It clearly presents the current state and business
strategy of Jurys Inn such as:
Competitive rivalry: This force examine that how intense competition currently in the
marketplace. There is an intense and increasing rivalry within the hospitality industry nowadays.
Further, Rivalry competition is high for the business of Jurys Inn.
Bargaining power of suppliers: The power of business supplier is also high as business is
in better position.
Bargaining power of customer: Hospitality industry is one of the fastest growing
industries and there are various options are open for all the customers. Further, there is high
bargaining power of customers within this industry. Consumer power is high due to the several
available options.
Threat of new entrants: Due to the increasing competition within the hospitality industry
it is difficult for new business firms to enter into the markets. Further, threat of new entrant is low
in the specific industry.
Threat of substitute products or services: This force is high within the hospitality
industry as it is easy of consumers to switch from a business products or services to that of a
competitor.
Due to the increasing competitive environment it is becoming tougher for the staff
members to work in this environment. In order to gain higher competitive advantage, Jurys Inn
Islington includes different sorts of projects to grant the highest possible level of services in the
field of luxury ambiance and technological advancements in the kitchen appliances (Black,
Akintoye and Fitzgerald, 2000). They are going to establish the rooftop restaurants with excellent
ambiance to attract a high number of customers. The following projects should be considered at
the Jurys Inn:
Development of a new rooftop restaurant and their various branches in different cities to
expand their business for long-term sustainability.
Upgrade of the kitchen appliances with several technological advancements
Changes in the ambiance of the hotel to attract more clients
3
Document Page
The hospitality industry is one of the most promising and rising industry across the world.
Individual companies, therefore, have to advance in the future to compete with their competitors
(Hamilton, 2010). From the programme leader’s point of view, the above-mentioned changes and
projects will support the hotel management to achieve their vision and mission. The programme
of launching a rooftop restaurant aims to set the following objectives:
In order to gain the loyalty of their customers, highly advanced services are offered,
providing excellent ambiance,
fast and quality services to their consumers with the use of technologically advanced
kitchen equipment,
attainment of an edge over other players in the industry
attracting young people as they are highly involved in the hospitality services and prefer
to visit new places and restaurants. Young people are their target customers who are
highly attracted towards a new rooftop restaurant. With setting their target market, they
can quickly provide quality services with appropriate management operations.
For the proper development of the new rooftop building, it is quite essential to formulate
appropriate objectives that need to be attained. With the help of the above given and set
objectives, Jurys Inn can easily achieve the target market and attract a great number of customers
(Coleman and Glover, 2010). There are several benefits of initiating these projects that will
support the business strategy of Jurys Inn: Attainment of the edge over rivals: Nowadays one of the major problems faced by
companies is increasing competition. Due to this, each and every organization is adopting
different strategies to compete with their rivals. Jurys Inn can quickly achieve its
objectives with the help of appropriate planning. By going through the proper planning
for the development and formulation of new project, Jurys Inn can easily capture a larger
market share. Rooftop restaurant is the major attraction point for all the young consumers.
It will improve the brand image of the hotel (Kousholt, 2007). With setting up this
project, they can provide quality hospitality services to all their customers and easily
enhance their market share.
4
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Quality services: With the procurement of superior quality food, customers can be
attracted towards the new unit of rooftop restaurant. Furthermore, initiating the new
project can involve adoption of the latest and technologically advanced equipments as
well as resources for the kitchen. Moreover, they can make their kitchen well equipped
and furnished so that services can be offered within minimal time span to the customers
(Meredith and Mantel, 2011). High quality may improve the overall efficiency of the
hotel.
Increasing customer base: One of the major benefits of developing this new project is
that it would assist in increasing the number of returning clients for the Jurys Inn.
Furthermore, the visitors coming from various countries for personal, business, or leisure
purposes would also be pleased to a great extent. This fact would result in increasing the
customer base in an effective manner. This must raise the level of profit margin.
1.2 Negotiation with stakeholders
In case of the project of Jurys Inn, the major stakeholders are the HR manager of the
hotel, the operation manager, the board of directors, the government, the shareholders, the staff
members, etc. There are several roles and responsibilities being played by the stakeholders. These
are as follows; Shareholders as well as investors of the organization can question about the
overall expenses in the new launching of their product. They possess concise behavior about their
fund in both the cases of success and failure of the project. In addition to this, the board of
directors is also required to provide approval regarding the development of the new restaurant
project.
A stakeholder is a person who will directly be affected by the outcomes of the corporate
decision-making process. It is essential for any organization to negotiate with their stakeholders
to know the current needs and demands. However, before involving any new project in the
business operations, the stakeholders should have appropriate knowledge about the new project
as it might affect the overall operations and productivity of the company. Stakeholders are a
crucial part of the company as they help to make better decisions. In order to start a new project,
there is great demand for increasing the participation of the stakeholders within the organization.
This happens because they play a crucial role in making investment within the organization to a
great extent. The technique of negotiation is being used with the aim to gain the support of the
5
Document Page
stakeholders. In different projects negotiation of different stakeholders are taken into
consideration (Lewis, 2007). Under this, various techniques can be used by their stakeholders in
order to negotiate effectively such as: In case of the project of Jurys Inn, the major stakeholders
are the HR manager of the hotel, the operation manager, the board of directors, the government,
the shareholders, the staff members, etc. There are several roles and responsibilities being played
by the stakeholders. These are as follows; Shareholders as well as investors of the organization
can question about the overall expenses in the new launching of their product. They possess
concise behavior about their fund in both the cases of success and failure of the project. In
addition to this, the board of directors is also required to provide approval regarding the
development of the new restaurant project.
From the above stakeholder analysis mapping it has been analyzed that there are various
stakeholders such as employees, investors, customers etc. They provide several benefits such as
project manager is responsible for the use of sustainable business model and allows this model to
actualize the products. They had given huge contribution at the time of work load and provided
6
Document Page
consistent risk of project failure. On the other hand, employees are the most important
stakeholders of any organization and it is essential for firm to go through the appropriate methods
through which employee satisfaction and productivity can be enhanced. However, customers’
helps in increasing the social product mean and always take a risk at the time of purchasing any
products.
In order to identify the objectives and benefits of these projects, a meeting was arranged.
Key representatives of each stakeholder were invited. All feedback, whether positive or negative,
was taken into consideration. Several difficulties were mentioned as most of the stakeholders
were not satisfied with the given projects. The programme of launching the new rooftop
restaurant requires a high amount of investment and budget, and they are concerned about the
funds in case the project fails (Reiss, 2007). For the new rooftop restaurant, more employees will
have to be hired, and modern kitchen appliances will also require high investment. Before
consulting about the proposal, it was essential to deliver appropriate information about the
benefits of all these projects to all the stakeholders.
Customers - They are the most important stakeholders of the company. In order to
consult with consumers, it is important to understand them as well as their requirements.
With the help of a questionnaire, their needs and demands can be efficiently identified.
With the help of taking several feedbacks from customers all their values and
requirements can be sharedtaken into consideration.
Employees - It is essential to negotiate with employees in terms of developing the new
project. Appropriate information about the project as well as its services should be duly
communicated to employees so that they will be able to deal with all the customers
directly. They cannot be consulted with the help of meetings or internal e-mail system.
Along with this negotiation, the employees can be offered to have high salary and
promotion. It is the best part by which they can perform all their tasks in a more effective
manner. With the help of this, employees can increase their performance with respect to
society, the environment and the economy. Employees also want to increase their
business success through the contribution we make to society and the environment
Top management - These people cannot be negotiated personally and they can give
various reviews as per their level of experience.These people cannot be negotiated by
meeting personally or at meetings. Reviews from these people can be taken into account.
7
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
With the increase in the market share of the hotel, greater satisfaction can be offered to
them. Furthermore, they would enhance their ability to negotiate, by generating value for
business and society. They can easily optimize environmental efficiency and
commercializing environmental and social products. Government- Negotiation with the government is an essential aspect. As with the
absence of permission from the government, business cannot run in a smooth manner.
There is a great need for getting prior approval from them by complying with proper
documentation as well as essential legal requirements. This material can be further sent
through emails. After getting approval from their side, the program can be launched.
Negotiation Skills-
Negotiation skills of the project manager are not just limited to external parties of the
company, but it also applies to the effective communication with everybody who is directly or
indirectly related to the business objectives. It is essential for project manager to have appropriate
information about the culture of different countries. He is responsible for handling projects in
different countries. For the same, if he is have cultural sensitivity skill he is able to handle
different projects and easily negotiate with the dealer of different country as per their culture at
the same time. However, he must have awareness about the different personality traits of an
individual through which a person is capable of managing the project and solving any type of
problems.
Most of the managers are very effective in negotiating with vendors, contractors, etc. but they are
not that effective in dealing with team members, customers, etc. It might result in the decrease of
their market share as they are unable to offer quality services to the customers by their needs. It is
crucial for a project manager to understand the various interests of people involved in the
different activities and to resolve all their problems. For this, it is also necessary to know about
their diverse interest in negotiations etc. People belong from diverse culture as well as
backgrounds and it is essential to negotiate with them on the basis of cultural sensitivity.
Negotiation skills of the project manager are not just limited to external parties of the company,
but it also apply to the effective communication with everybody who is directly or indirectly
related to the business objectives. Most of the managers are very effective in negotiating with
vendors, contractors, etc. but they are not that effective in dealing with team members, customers,
8
Document Page
etc. It might result in the decrease of their market share as they are unable to offer quality
services to the customers by their needs. It is crucial for a project manager to understand the
various interests of people involved in the different activities and to resolve all their problems.
For this, it is also necessary to know about their diverse interest in negotiations etc. People
belong from diverse culture as well as backgrounds and it is essential to negotiate with them on
the basis of cultural sensitivity. Awareness of personality traits are another most effective skill
through which various problems can be managed.
TASK 2
Plan for the programme of projects
After going through the negotiation process with stakeholders, the next process is the
development of the plan for the programme. The support of all the required stakeholders
(employees, customers, and the top management team) is also essential and based on this plan,
feasibility of the whole programme can be judged. The plan should be drawn as follows:
Building a new rooftop restaurant: In order to build a new rooftop in the Jurys Inn,
advance information is required to set the lounge or rooftop on the top floor of the hotel.
Permission from the local authorities needs to be taken in prior advance. The construction can be
handed over as a tender to a building company. It is also necessary to establish the whole budget
with appropriate timeframes. Moreover, several resources are required to set the excellent
ambiance, and it should be in agreement with the financial resources available within the
organization. Professional and efficient allocation of the financial, human and technological
resources is critical in accomplishing the project effectively (Kerzner, 2009).
Upgrade of the kitchen equipment and development of the kitchen staff: There are
several technologically advanced kitchen appliances such as Cook tops with LCD, tandoor, etc.
To provide quick services to customers, specialist chefs can also be hired to improve cooking and
other kitchen procedures. The responsibilities need to be distributed properly, ensuring high level
of monitoring as well. For this, appropriate staff members and whole kitchen staff need to be
recruited in a well experienced way. Experienced cooking staff and chef handle all their
responsibilities in an appropriate way. With the help of this, fresh and quality food can be served
to all their customers. Installation of advanced equipments and accessories will requires funds
for purchasing of equipment’s. It also requires installation charges as well as appropriate training
9
Document Page
must be provided to all the staff members for utilization of new equipments. For this, an
appropriate analysis team will be hired for the selection of best suitable equipments for kitchen.
In case of acquiring latest equipment’s which fulfill the requirements from other countries custom
as well as transit charges will be required. In addition to this, extra funds will be requireding to
trained employees about the new equipments.
The total cost allocated for the project is 400,000 Euros.
Proper duties and responsibilities to all the team members should be assigned more
accurately to ensure efficient operation. Furthermore, it is also essential to assign to efficient
redistribution of duties so that whole new staff can work effectively. They must have to
understand their responsibilities on the basis of appropriate assigned duty. In this way,
development of new kitchen staff can be made appropriately and helps in providing quality
services to their customers. All of these tactics acts as an effective source with which ambiance of
the hotel can be improved efficiently.
The project manager will be completely responsible for laying out plans for
different activities, and he will also obtain approval from the Board of Directors. This planning
part describes the different project deliverables including a stakeholder analysis.. Managerial
roles include proper instructions to all their subordinates as well as the development of the most
appropriate planning based on the requirements of customers. They are also responsible for
developing a risk management plan under which a contingency plan will be developed. It helps
them in managing their business operations at the time of natural disasters, data loss, etc. In any
hotel industry, the HR department plays a crucial role in assigning these responsibilities.
Managerial roles include proper instructions to all their subordinates as well as the development
of the most appropriate planning based on the requirements of customers. With the help of
fulfilling their responsibilities effectively, management team can easily attract huge base of
customers. For this, they need to give proper instruction to their employees about quality
management as well as their work improvement. They are also responsible for developing a risk
management plan under which a contingency plan will be developed. It helps them in managing
their business operations at the time of natural disasters, data loss, etc. In any hotel industry, the
HR department plays a crucial role in assigning these responsibilities.
10
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
TASK 3
2.1 Leading the coordination of the programme
One of the most important project tasks is proper coordination among individuals and
resources. It is necessary to communicate with all the stakeholders to achieve the target of the
company. For this, it is important for the manager to follow a participative style of leadership so
that all team members can be encouraged and be considered as an important part of the team.
The company can apply a pyramid structure of communication in which the decisions are
passed down from top management to middle level and then to employees. This particular
structure is justified in case of complex projects and involvement of third parties. This structure
is flexible enough so that everyone can put forward their views and participate in the decision-
making process.
Other than the communication process, it is also important for managers to apply a
continuous monitoring process. It is the most active process by which they can access the status
of activities with relation to the standards defined as well as resources allocated. Regular
monitoring will help the manager to identify problems and will also assist them to take the rapid
measures so unseen events that can be avoided. Through timely monitoring of the business
activities, the deviation in the activities can be determined. All the business activities need to be
monitored in order to make alterations so that gaps in the activities can be removed, and
objectives of the hotel can be achieved efficiently.
Supplier and employment contracts will have to be signed respectively. A contract should
be given to the construction company to complete the project within a given time frame. Several
chefs are also appointed to the hotel through which they can provide quality food suiting the taste
of their customers. Different technicians are also hired for the installation and maintenance of the
new equipment (Brewer and Strahorn, 2012).
2.2 Management of resources
In order to achieve the long-term objectives of the company, there is great need to
accomplish the project activities within the specified time. The funds assigned to all the team
members need to be utilized effectively. Management of the resources is a critical business
activity that requires the development of suitable plans. Proper communication with the
purchasing department, reviewing the cash-flow etc. can certainly contribute to the success of
11
Document Page
leadership. As a result, controlling can also be improved and this would offer deeper insight to
the availability of financial resources in the business.
Apart from this, the HR department needs to recruit several skilled employees for the
efficient operation of the new restaurant. Further, specific skills for specific positions are required
and which must be fulfilled by an individual. For example: In case of recruiting HR manager of
company it is essential that candidate must have minimum 1 year experience within the same
field of industry. He/she must have effective communication skills so that he/she can easily
interact with the other members. Multitasking as well as negotiation skills are another major area
required to set for the appropriate and vacant position.
Furthermore, the manager should organize regular meetings with board members and
entire top management to finalize the investment that will be required in order to launch a
product for a specific segment. There are various financial sources which should be analyzed
carefully in terms of cost and revenues. For instance, the sources of finance include external as
well as internal sources. The former is comprised of sources such as a loan from the bank, hire
purchase or issues of shares. The latter includes the internal sources, such as sales of assets and
retained earnings. Resources can be arranged from both internal and external sources. All the
resource requirements in terms of machines, appliances and furniture for the restaurant should be
listed. Furthermore, they need to furnish their kitchen with all the equipment according to the
requirements. It also involves the cost analysis, source and timing of delivery. Coordination of
different activities of the project will also be required so that overlapping and repetition is
avoided. Allocation of resources should be done appropriately so that all kinds of wastage can be
avoided. For example, the team leader should assign appropriate responsibilities such as: project
assignment with completion deadlines, task handling, related to all their team members according
to their capabilities and skills.
2.3 Review and monitoring of the projects
In order to review and monitor the project plan, it is essential to involve all the teams as
well as all staff members. Jurys Inn is the largest hotel in London, and all their business
operations are well managed by different departments. In order to formulate any new strategy as
12
Document Page
well as development of any new project, it is essential to communicate all the objectives to the
different departments (Nienaber, 2010). At the time of project finalization, financial resources
should be reviewed so that implementation can be improved. An appropriate budget for the
project is necessary to be determined so that sound monitoring can be done. Cost- benefit and
critical path analyses are effective ways that set project plans. Critical path analysis is the best
project management tools that help the project manager handle time- sensitive business
operations as well as complex processes (Thomas, 2000).. Benchmarks were set for the kitchen
equipment upgrade so that the required results can be attained within the stipulated time.
Moreover, there are various critical situations that may arise in the pathway of the program. In
order to manage this situation, alterations within several business practices are required.
Further monitoring for the above program can also be prepared by the researcher in terms of:
Follow up - Evaluation of all the tasks involved in the project
Focus on Objectives - complete focusing on ultimate aims of the project and monitoring
each and every activity properly.
Regular analysis of Review Reports - It is necessary for the manager to review the
complete project reports that provide the basis for the analysis
Mechanism - A monitoring mechanism can be established to ensure commitment,
feedbacks, and proper direction through regular meetings with all stakeholders of the
company. Checklist can be incorporated in order to review the progress of the program.
This will help in taking corrective actions as well.
2.4 Reporting the Programme progress and Results to Stakeholders
The project should be properly finalized, and the progress of these programmes needs to
be evaluated on different basis such as timely, resource, and quality dimensions. There are
different techniques such as and the Gantt chart that demonstrate the time frame to accomplish
the activities in the programme relating to each individual project. However, such tools need to
gain very clear information regarding the project and time frame required. Furthermore, publicity
and promotion are also important parts of the project. Different types of reporting can be done:
STAKEHOLDERS REPORTING TO BE DONE
Board of directors Reporting is properly done in order to
inform the board of directors so that they
13
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
can understand how the activities have
proceeded. Issues and their impacts can
also be indicated.
Project manager Reporting needs to be done in order to
inform the project manager about the
record of all activities in the project
execution. It allows the manager to access
and identify the performance in terms of
time and quality
Local Community Press release in order to identify the work
needs to be done.
Employees It is essential for all the workers to report to
their high authorities. They should update their
higher authorities on the basis of work done by
them. Further, they can provide appropriate
feedbacks to employees through which overall
performance can be improved. It is essential
for the individual to report to the manager so
that project can be accomplished effectively.
Thus, through giving proper feedback to
individuals the desired results can be attained.
Thus, it can be stated that it is the best way
through which the project can be completed
and results can be attained.
2.5 Closing the program and projects
It can be evaluated that by going through the closing of the program and projects the total
outcome obtained from the process can be offered to different stakeholders of the firm. However,
it is essential for the firm to go through the program and support the stakeholders so that no
conflicts happen at the time of ending the process. Thus, closing the process can be done through
14
Document Page
managing and carrying out the auditing process effectively. It helps to gain ideas about the flow
of capital. Through ensuring the appropriate closing of the project it supports in reviewing the
success of the program. Thus, it is essential to sign up a contract with a construction company
(Lock, 2007). The project manager need to set the time frame so that the assigned task can be
accomplished effectively. Thus, it is quite essential to go through the total outcome of the
program that is offered to different stakeholders. They can verify their support as well as their
interest in the particular program. However, the project closure phase involves different steps by
which the management team can release the final outcomes to the customers as well as
communicate project closure to all the stakeholders. In this way, appropriate evaluation can take
place regarding how the project performed against each of its target. In this way, initiation and
planning phases of the project should be set. In order to go through this, the project closure model
can be adopted by the business. Some of the procedures that are being adopted at the time of
closure are:
Project Closure Meeting - It is important for project managers to hold meetings with
stakeholders so that common conclusions can be drawn from meetings. At this meeting,
everything from project start up to the final phase will be discussed in details: how the
plan started, how it was executed, issues, conflicts, strengths, weaknesses, methods,
techniques, etc. are discussed in details. The main aim of this meeting is to find that
everything planned at the beginning has been covered.
Define Success - It is essential to define whether the project team was able to deliver the
project in appropriate quality and timeframe
Closing Contacts- - It is essential for the company to have good relationship with all
individuals who are also involved in closing contract. This meeting is also executed in
order to update all the records from these people
TASK 4
3.1 Assessing the success of projects with project managers
Success of projects can be assessed with a balanced scorecard which tracks various
activities measuring effectiveness (Kaplan, R., S. & Norton, D., P. 1996).. Balance scorecard is a
strategic planning and management system tool that is used by various business firms as well as
government. It retains traditional financial measures and also helps in measuring financial
15
Document Page
performance. It balances between internal and external measures as well as performance results
and the drivers of future results. At the end, a complete summary of the project is prepared which
reveals the actual plans and deviations from them.
Figures 21: Kaplan and Norton, 1996
Project manager can easily evaluate the success of this project by measuring its performance. It
not only considers financial measures but also look for the customer, business process, and
learning measures. Applying balance scorecard contains various steps such as:
Identify vision: Create a balance scorecard
Identify perspectives: Organization’s future
Identify CSF’s: Identification of strengths and how to get there
Identify measures: Find out the critical success factors
Evaluation: Measurement that everything is going in a right way
Identify strengths: It is essential to consider that right things are measured
16
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Create action plan: Based on the whole work create appropriate action plan and operation
of the scorecard
Follow up and manage: Setting up the criteria that how scorecard will be manage and
which person sis authorized for the same.
3.2 Review of the success of the Program
It is the last and most important stage in which whole program is evaluated in order to measure
the success. It is done with the help of proper evaluation and reviewing the success of program. It
can be determines on the basis of how much objectives are achieved by the projects. The
evaluation of fund which is utilized by different sources or how much effective it was is being
measured by the company. With the help of taking several feedbacks from the stakeholders
project manager can go through the changes which are required to be attain. They can also justify
the effort, cost, time, and support from different stakeholders. Further, it offers information how
reviewing can be managed.. There are several inadequacies that take place at the time of
implementation as well as monitoring. In order to overcome these, it is essential to go through the
reviewing process. With the help of this, they can better plan so that attainment of their goals can
be ensured. Each and every project manager should submit a project report that includes the time
required to accomplish the project and the cost associated with the plan. In addition to this, it
would also include the benefits of implementing the plan (Reiss, 2007). After submission of this
report, it must be evaluated on the basis of the success of the project and its impact on the
programme. Construction projects take a lot of time, so it is better to take precautions and
measure the time for each work phase. It may lead to decreasing in the quality of services and
several other reasons such as poor availability of labor force in the region, unfavorable working
environment, and other related issues.. With the help of proper alignment of resources the
company can enhance their sales as well as attract a huge customer base.
3.3 Areas for Improvement in Future Program Management and Leadership
There is a huge improvement required in future management programme as well as
leadership. Leaders have to focus on the several aspects that assist in influencing the behavior of
others. For future development, they need to improve their communication skills as it will help
them better communicate the plan with their coordinators. It is essential at the time of explaining
the benefits and objectives of the plan that must be clear to the stakeholders (Thomas, 2000).The
overall kitchen up gradation needs a huge fund so the area which should be improved is to make
the project more cost efficient. It is necessary to select all those resources which would be less
17
Document Page
costly comparative to other resources. Further, the employees should be ready to accept new
challenges and adopt best training for the new and advanced up graded kitchen equipment’s.
Further, employees should always be ready for change and management needs to assure them that
change will be beneficial for them. In order to avoid variance at the end there should be proper
monitoring of the project. It should be ensure that variances will not occur in further project. By
selecting effective leadership and including team members in the decision making, they feel
motivated and encouraged. It is an appropriate manner through which they can easily achieve
their target. In order to go through the above mentioned improvements the program leader has to
gain knowledge about the proper project management and risk management techniques. This
would assist the program leader in managing tasks in accordance with the time specified for
project accomplishment.
CONCLUSION
It can be concluded from the study that the role of programme leadership is crucial for
any organization. The whole report was based on the Jurys Inn Islington London and their new
project that was opening a new roof top restaurant. From the above report it can be articulated
that the best resources of fund should be selected in order to make the overall project cost
efficient. Whole strategy must be planned carefully and further several points must be covered for
the future improvements. Moreover, program leadership is the best practice through which every
project can be completed within specified time, and further organization can attain its quality
objectives as well.
18
Document Page
19
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
REFERENCES
Black, C. Akintoye, A. and Fitzgerald, E., (2000). An analysis of success factors and benefits of
partnering in construction. International Journal of Project Management. 18(6).
Brewer, G. and Strahorn, S., (2012). Trust and the Project Management Body of Knowledge.
Engineering, Construction and Architectural Management. 19(3).
Bryde, J. D., (2003). Modelling project management performance. International Journal of
Quality & Reliability Management. 20(2).
Carlisle, P. and Loveday, B., (2007). Performance Management and the Demise of Leadership.
International Journal of Leadership in Public Services. 3(2).
Coleman, M. and Glover, D., (2010). Educational Leadership and Management: Developing
Insights and Skills. Maidenhead: Open University Press and McGraw-Hill International
Education
Eve, A., (2007). Development of project management systems. Industrial and Commercial
Training. 39(2).
Hamilton, A., (2010). Art and Practice of Managing Projects. London: Thomas Telford.
Hansen, K. L. and Kræmmergaard, P., (2013). Transforming local government by project
portfolio management: Identifying and overcoming control problems. Transforming
Government: People, Process and Policy. 7(1).
Kaplan, R., S. & Norton, D., P. (1996), Using the Balanced Scorecard as a strategic management
system, Harvard Business Review, January-February, 1996.
Kerzner, H., (2009). Project Management: A Systems Approach to Planning, Scheduling, and
Controlling. 10th ed. John Wiley & Sons.
Knutson, J., (2002). Project Management for Business Professionals: A Comprehensive Guide.
Wiley.
Kousholt, B., (2007). Project Management. Nyt Teknisk Forlag.
Lewis, P. J., (2007). Fundamentals of Project Management. 3rd ed. AMACOM Div American
Mgmt Assn.
Lock, D., (2007). The Essentials of Project Management. 3rd ed. Gower Publishing
Meredith, J. R. and Mantel, S. J., 2011. Project Management: A Managerial Approach. 8th ed.
John Wiley & Sons.
Nicholas, J. M. and Steyn, H., 2008. Project Management for Business, Engineering, and
Technology: Principles and Practice. 3rd ed. Taylor & Francis Group.
20
Document Page
Nienaber, H., (2010). Conceptualisation of management and leadership. Management Decision.
48(5).
Pines, M. A., Dvir, D. and Sadeh, A., (2009). Project manager-project (PM-P) fit and project
success. International Journal of Operations & Production Management. 29(3).
Project Management Institute, (2009). A Guide to the Project Management Body of Knowledge:
PMBOK Guide. 4th Ed. Project Management Institute.
Reiss, G., (2007). Project Management Demystified. 3rd ed. USA: Routledge.
Roberts, P., (2011). Effective Project Management: Identify and Manage Risks Plan and Budget
Keep Projects Under Control. London: Kogan Page Publishers
Seong, F. N., (2013). Assessing leadership knowledge in a principal ship preparation programme.
International Journal of Educational Management. 27(4).
Thomas, C. C., (2000). Project Management: A Necessary Skill? Industrial Management & Data
Systems. 90(6).
Zou, W. X. P. Zhang, G. and Wang, J., 2007. Understanding the key risks in construction projects
in China. International Journal of Project Management. 25(6).
21
chevron_up_icon
1 out of 21
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]