CE 1.1 Project Information Name of the project:Power Line Communications Location of the project:Please fill Project Duration:Please fill Organization:Please fill Role and Designation during the time:Developer of project CE 1.2 Project Background CE 1.2.1 Characteristics of the project The technology of PLC or power line communication allows sending of data over the previously existing power cables. It is possible to run an electronic device with the help f power cables with the features of powering up and even controlling or retrieving the data from it within half duplex manner. A wider range of power-line communicating technologies are eventually required for various applications that range from the home-automation to the Internet access. While completion of my Bachelor’s degree, I came up with the idea to execute a project of power line communications. I made the project over low voltage grid that try in achieving high bit rates and even more reliable communication over the power lines. I have exposed the system with a load for understanding the change in communication channel qualities. I have measured few channel features within the similar grid and noise level as well as attenuation measurements undertaken was up to 16 MHz. Therefore, within this project, I have successfully and efficiently used a communication strategy, which can be utilized for transferring information on the power-line communications channel by combination of coding, diversity of frequency and utilization of the sub channels.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
CE 1.2.2 Objectives developed for the project While executing this project of power line communications, I have developed a power line communication for the betterment of the technological world. I concentrated on broad band data transferring and broad band indoor communications as well as home automation within lower voltage distribution network. Hence, for completing this project with high efficiency and accuracy, I have developed few objectives: ï‚·To efficiently develop a power line communication for providing better advantages to the technological field. ï‚·To maintain a lower voltage distributionbetween home and transformer station. ï‚·To focus on the higher frequency features of industry-based lower voltage distribution network. ï‚·To ensure that the industry-based lower voltage distribution network could be used as the major communication channel for data transferring needed by an online condition- monitoring of numerous electric motors. ï‚·To complete the work over low voltage grid that is effective for achievinghigh-bit rates as well as more reliable communications over the various power lines. ï‚·To expose the system with a load for studying the change in the communication channel quality. ï‚·To measure few channel characteristics within the same grid. CE 1.2.3 My area of work As,whilecompletingtheseworksintheproject,Icomprisedofsubsequent experiences in the field works about telecommunication project, I was recruited as the developer of the project. Previously, I have done works with various subsequent areas such as signal to noise ratio, effect of non-white Gaussian noise as well as transmitter waveforms and hence it was extremely easy for me for executing the specified project promptly and
Supervisor of the Project Team Member of the project Team Member of the project Project Developer (Me) efficiently. I also had significant leadership skills as well as problem solving skill, thus I was chosen by my respective supervisor for completing this work eventually. CE 1.2.4 Project Group Figure 1: People involved in the project CE 1.2.5 My responsibilities throughout the project Being telecommunications engineer by profession in this project, I comprised of some of the most important and significant responsibilities. My major responsibility within this project was to develop a power line communication. For this purpose at first, I had to clear my significant doubts regarding this communication. I studied about various past researches and hence gained subsequent knowledge regarding the subject. I had to concentrate on the home automation system, broad band indoor communication and even broad band data transferring within a lower voltage distribution network between transformer station and home. I checked this type of industrial lower voltage distribution network is only being used as the communication channel for data transferring after online conditions monitoring or checking of the electrical motors. I wanted to make this power line communication such
effectivethatitcouldbeusedintheexistinginfrastructureofahouse.Myother responsibilities included exposing the system with the specific load that comprise of a collection of industry based machines for the purpose of studying changes within the communicationchannelquality.I even measuredthe noiseleveland attenuationand observed the results. CE 1.3 Distinctive Activity CE 1.3.1 Comprehending the Theory of Project Regarding the theoretical studies, I have used basic telecommunication and power line communication concepts. I have modelled for having a time-varying frequency dependency SNR orsignal-to-noise ratio on the communicational bandwidth. Figure 2: Signal to Noise Ratio for the project I have checked that the power line communications is majorly utilized for tele- protection, tele-monitoring and telecommunication within electrical substations through the
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
power line at higher voltages, like 110 kV, 220 kV and 400 kV. The pilot frequency was the signal within the range of audio, which is being transmitted constantly forthe successful detection of failure. Regarding the hardware requirements of this project, I have used PCB, step down transformer 3V/500mA, voltage regulator LM7805, rectifier diodes 1N4001, LEDs, capacitors, micro controllers of IC 8870, 91214, 74154, 4049 and 4013 operational amplifier 741, RESET 100K, micro switch, PVC wires, capacitors 104PF, resistance 10K, mike, speaker 5 ohm, crystal, IC 7805, Tr. BC 548 and DPDT S/W. CE 1.3.2 Engineering knowledge and skills applied in the project To execute this project work, I had successfully applied each and every core skill and knowledge for telecommunications engineering. The specific knowledge regarding power line communication is being applied here. Moreover, I have even used by skill of circuit designing and attenuation to make this project successful. I have also used the knowledge regarding active and passive devices for signal attenuation. CE 1.3.3 Accomplishment and Task Performed I had successfully utilized each material for accomplishing the work of this project. I had designed this power line communication for using it in thehome, building, industrial, and transportation automation applications. I was successful in doing so and my power line transceivers have eventuallyearned their reputation for reliability in systems worldwide.
Figure 3: Applications of Power Line Communications I had considered the transmission of the high-frequency carrier frequencies within the significant range of 0 to +32db. Since, I got the measurement of attenuation and noise level up to 16 MHz, I gave the communication strategy, which can be utilized for the purpose of information transferring over power line communication channel. For this purpose, I had combinedcoding, diversity in frequency as well as the utilization of sub channels that were similar to OFDM. CE 1.3.4 Identified issues and their solutions 1.3.4.1 Issues The former technical difficulty, which I have faced within the project was during checking the interference from the systems. It caused major degradation in the signal since the modern did not have the ability of determining specified frequency within several signals
of similar bandwidth. The next technical difficulty that I had confronted in this project was during signal attenuation by passive devices. Since the DC to DC converters and transformers attenuate the input frequency signal completely, it caused major delays in my project. 1.3.4.2 Solutions I had the ability in finding out relevant solutions for each of these two issues within the project. For this first technical difficulty of interference, I gave the solution to make that no radio transmitters are being used here including system transmitter and wireless systems. I finally resolved the issue and allowed to come closer than 3 to 4.5 m within the wireless receiving antennas. It overloaded the receivers and hence increased the interference chances. Regardingthesecondtechnicaldifficulty,Iextendedthedynamicrangetomeasure equipment only after adjustment of signal levels and hence providing impedance matching of the amplifiers or oscillators for the core purpose of reducing improper input and output termination effects. CE 1.3.5 Plan to produce creative and innovative work I had to make a plan for my team and team members so that innovative work is being executed in the project. This type of planning was quite helpful for us to complete the project. Moreover, errors was also being identified in this process. CE 1.4 Project Review CE 1.4.1 Project Overview This complete project was executed only after consideration of few important and the subsequent characteristics of power line communication. I had successfully developed this particular communication with proper features. Since I comprised of team leadership skills, I have provided guidance to my respective team members. Moreover, I even articulated a
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
proper frame work over the basis of various types of works for achievement of the previously determined goals. CE 1.4.2 My Contribution to work I was selected as the developer of the project within the project. I had completed my task by developing a proper and effective power line communication that could bring out better efficiency and results. Moreover, I even eradicated the faults in the project and provided subsequent solutions to them.