logo

Project Charter for WHS Training at Lowes

   

Added on  2023-01-19

16 Pages2586 Words41 Views
P R O J E C T C H A R T E R
Project Name: Revision Date:
Customer Project Sponsor: Project Manager:
Instructions:
1. Remove all the instructions before submitting
2. Save this file using this format:
(last name)_(first name)_ProjectCharter
3. Ensure you update the table of contents (update field) so that the
pagination is accurate.
4. Your own writing should be in black
Table of Contents:
PROJECT OBJECTIVES:.............................................................................................................................2
PURPOSE:...............................................................................................................................................2
SCOPE:...................................................................................................................................................2
DELIVERABLES:.......................................................................................................................................2
PRIORITY:...............................................................................................................................................3
KEY STAKEHOLDERS (INTERNAL AND EXTERNAL):..................................................................................3
CROSS-ORGANIZATIONAL TEAM MEMBERS:..........................................................................................3
SPECIAL RESOURCES:..............................................................................................................................3
PROJECT PLAN:.......................................................................................................................................4
POTENTIAL ISSUES OR CONSTRAINTS:....................................................................................................7
COMPLETION CRITERIA:.........................................................................................................................7
APPROVALS:...........................................................................................................................................7
APPENDIX 1: BUDGET RESOURCES:........................................................................................................9
APPENDIX 2: COMMUNICATION PLAN.................................................................................................13
RISK MANAGEMENT PLAN....................................................................................................................15

PROJECT OBJECTIVES:
The focus of this project is to train the employees at Lowes regarding maintaining
workplace health and safety standards. The objectives of the project are listed as
follows.
To conduct a training sessions for the Lowes employees regarding
maintaining a safe workplace
To conduct detailed activity sessions for the Lowes employees regarding
possible actions that can be taken in the workplace during various hazards
To raise awareness among the employees regarding healthy and safe
workplace
PURPOSE:
The purpose of the project is to raise awareness regarding safe and healthy
workplace among the employees of Lowes. It has been seen in the past that there
have been some hazards in the workplace due to which, injuries were inflicted on
many employees. These problems could have been avoided if appropriate training
was provided to the employees by a group of professionals. It is very important to
maintain a safe and healthy environment at the workplace and it can only be
achieved with proper training to the employees.
SCOPE:
The primary scope of the project is to provide suitable training to the employees of
the company regarding the workplace health and safety measures. While the basic
objective to provide suitable training as specified earlier, the scope also involves
raising strong awareness among the employees to be able to undertake suitable
actions during hazards or even maintain some daily work that can ensure safety of
the workplace. In this project, there will be various layers of training that will be
provided to the employees along with some additional lecture sessions for raising
the awareness about a safe workplace. The scope also involves demonstration of
hazard situations within the office premises and evaluation of the employees’
actions against such hazards.
While these are included in the project, there are certain aspects that are excluded
from the project. For instance, development of risk management plan,
development of employee activity program for combating the hazards and other
internal matters are out of scope of the project.

DELIVERABLES:
The main deliverables and milestones of the project are shown as follows.
Deliverables Milestones
Initial Discussions and Hiring of
Training Personnel
Finalise the deal with consultant
Project Planning Go ahead with the training plan
Training Process Evaluate learnings in this module,
Evaluate the results, Evaluation of the
Learnings, Final reporting
Project Review and Closing Close the project
PRIORITY:
Priority must be given to the training process that is essential for the project. Each and
every training module is to be treat with priority and must be completed within the
specified time and budget.
KEY STAKEHOLDERS (INTERNAL AND EXTERNAL):
Two stakeholders are identified as follows.
Stakeholder type Stakeholder
Designation Role
Internal Project Manager Control and
management of
project
External Training Manager Assign trainers in the
project
CROSS-ORGANIZATIONAL TEAM MEMBERS:
Mostly, the employees of the organisation are involved in the project and the
trainers will be hired from a consultancy organisation. Internal employees can be
used as volunteers but mostly, they do not have any specific roles other than
receiving the training.

SPECIAL RESOURCES:
External consultants are required for this project for developing project roadmap
as well as supplying trainers for the project. For the purpose of training, various
training materials, audio visual devices and demonstration materials are required
during the entire project.
PROJECT PLAN:
The overall project plan is shown in the following schedule table.
WB
S Task Name Duration Start Finish
0 WHS Training for Lowes 68 days
Mon
4/15/1
9
Wed
7/17/19
1
Initial Discussions and
Hiring of Training
Personnel
14 days
Mon
4/15/1
9
Thu
5/2/19
1.1 Conduct meeting with
consultant 2 days
Mon
4/15/1
9
Tue
4/16/19
1.2
Discuss training
requirements of Workplace
Health and Safety
2 days
Wed
4/17/1
9
Thu
4/18/19
1.3
Discuss roles of
employees in combating
various hazards
2 days
Fri
4/19/1
9
Mon
4/22/19
1.4 Discuss how the training
can be executed 2 days
Tue
4/23/1
9
Wed
4/24/19
1.5 Prepare a plan for the
training 2 days
Thu
4/25/1
9
Fri
4/26/19

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Workplace Safety and Health Management: Workwell Evaluation Results and Recommendations
|6
|723
|467

Workplace Health and Safety Assessment 2
|10
|2380
|313

ASSIGNMENT l PROJECT WORK HEALTH AND SAFETY
|16
|2721
|21

Workplace Safety and Health Hazards Action Plan for Workplace Safety and Health Hazards
|7
|1213
|99

Healthy Workplaces: Providing Safe and Productive Work Environment
|5
|988
|284

The Employees Responsibilities Assignment
|3
|955
|133