logo

Project Design, Implementation and Evaluation TABLE OF CONTENTS Introduction 6 assignment 1 6 task 16 Setting up system to record all the events related to ERP project

23 Pages5048 Words411 Views
   

Added on  2020-02-03

About This Document

Project Design, implementation and evaluation TABLE OF CONTENTS introduction 6 assignment 1 6 task 16 Setting up system to record all the events relating to your project 6 Proposal and list of resources that will be required to complete ERP project 7 Difficulties and ways to overcome these difficulties8 Task 28 Technical specification 8 Operational specification 8 Flowchart with a set of procedures 9 Task 39 Detailed project plan for New ERP solution 9 Assignment 2 12 Task 112 Demonstrating project development throughout the project’s lifetime 12 Resources which are

Project Design, Implementation and Evaluation TABLE OF CONTENTS Introduction 6 assignment 1 6 task 16 Setting up system to record all the events related to ERP project

   Added on 2020-02-03

ShareRelated Documents
Project Design,
implementation and
evaluation
Project Design, Implementation and Evaluation TABLE OF CONTENTS Introduction 6 assignment 1 6 task 16 Setting up system to record all the events related to ERP project_1
TABLE OF CONTENTS
introduction....................................................................................................................................6
assignment 1....................................................................................................................................6
task 1................................................................................................................................................6
Setting up system to record all the events relating to your project..............................................6
Proposal and list of resources that will be required to complete ERP project.............................7
Discussion with manager and deciding a project title.................................................................7
Factors that contribute to the selection of project........................................................................7
Difficulties and ways to overcome these difficulties...................................................................8
Task 2...............................................................................................................................................8
Technical specification................................................................................................................8
Operational specification.............................................................................................................8
Flowchart with a set of procedures..............................................................................................9
Task 3...............................................................................................................................................9
Detailed project plan for New ERP solution...............................................................................9
Assignment 2.................................................................................................................................12
Task 1.............................................................................................................................................12
Demonstrating project development throughout the project’s lifetime.....................................12
Resources which are being used to develop the project............................................................12
Project timing (Gantt chart).......................................................................................................13
Risks with resources and control measures...............................................................................13
Task 2.............................................................................................................................................14
Discuss key elements of the specification.................................................................................14
Project Design, Implementation and Evaluation TABLE OF CONTENTS Introduction 6 assignment 1 6 task 16 Setting up system to record all the events related to ERP project_2
Risk at achieving specification requirements and control measures.........................................14
Task 3.............................................................................................................................................14
Review of developed solution on the basis of technical specification......................................14
Task 4.............................................................................................................................................15
Task 5.............................................................................................................................................15
ASSIGNMENT 3...........................................................................................................................16
TASK 1..........................................................................................................................................16
Three potential solutions which meet requirements of technical specifications.......................16
Selection of best ERP system for development.........................................................................16
TASK 2..........................................................................................................................................17
Interpretation and analysis the outcomes in terms of the original project specification............17
TASK 3..........................................................................................................................................17
Recommendation and justification areas for further consideration...........................................17
assignment 4..................................................................................................................................19
TASK 1..........................................................................................................................................19
Produce a record of all project procedures used........................................................................19
TASK 2..........................................................................................................................................20
2 a. Presentation of the outcomes of the project to an audience................................................20
2b. Role of project management principles in ERP project development.................................20
CONCLUSION..............................................................................................................................20
references.......................................................................................................................................21
3 | P a g e
Project Design, Implementation and Evaluation TABLE OF CONTENTS Introduction 6 assignment 1 6 task 16 Setting up system to record all the events related to ERP project_3
TABLE OF FIGURES
Figure 1: Flowchart for project planning.........................................................................................9
Figure 2: Gantt chart for ERP solution project..............................................................................13
Figure 3: Network diagram............................................................................................................13
Project Design, Implementation and Evaluation TABLE OF CONTENTS Introduction 6 assignment 1 6 task 16 Setting up system to record all the events related to ERP project_4
LIST OF TABLES
Table 1: Project plan for ERP solution............................................................................................9
5 | P a g e
Project Design, Implementation and Evaluation TABLE OF CONTENTS Introduction 6 assignment 1 6 task 16 Setting up system to record all the events related to ERP project_5
INTRODUCTION
Project design can be defined as an early phase of the project where major key features,
structure, success criteria and major deliverables are planned out. It helps in implementation and
evaluation of projects in effective manner. The current research is based on project design,
implementation and evaluation. Regarding this, project has been chosen Access Group of UK
which is a software consultancy and developer. It offers number of business software to
organizations of UK (Schenkelberg, Kieny Bianco and Koff, 2015). These software are relevant
to finance, expense, business intelligence, CRM, human resource, CRM, etc. The current study
will focus on new product development project. As per the given case study a trainee design
engineer is accountable for designing, implementation and evaluation of this project. The current
research will include a detail description of the project formulation process. Afterwards project
manager will develop an implementation plan within agreed project specification. Further, focus
will also be given on evaluation and presentation of the project outcomes. Overall, the current
study will describe a very systematic process of designing, implementation, management and
evaluation of a new ERP system for Access Group of UK.
ASSIGNMENT 1
TASK 1
Setting up system to record all the events relating to your project
At the time of development of ERP solution project manager of Access needs to develop
appropriate record of different activities which are required for completing this project.
Regarding tis, design engineer can use database management system because it is effective for
maintaining record for long term (Akalin, Huang and Willems, 2016).
Along with this, For ERP solution project design engineer will require to complete the
following events:
Market research
Determining needs and requirements of clients
Formulation of objectives of the project
Developing project plan
Deciding activities for developing new ERP solution
Arrangement of resources
6 | P a g e
Project Design, Implementation and Evaluation TABLE OF CONTENTS Introduction 6 assignment 1 6 task 16 Setting up system to record all the events related to ERP project_6

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Contemporary Software Development
|30
|4800
|255

Project Management 2022 Tasks
|9
|1014
|15

Project Planning, Analysis and Management
|26
|5706
|169

Information System Project Management
|13
|1550
|80

Project on the New Available Technology
|44
|7377
|65

Project Management Assignment Solution (Doc)
|16
|1859
|60