Running head: PROJECT MANAGEMENT Project Management: BSBPMG522 Undertake project work Manage Meeting Name of the student: Name of the university:
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
1PROJECT MANAGEMENT a. Part 1: Project Brief 1.1 Project origin This report depicts the role of developing professional HR practices for improving the staff management approach in a large business organization called ABC Private Limited.The ABC software Development Company is comprises of 400 employees. It has been defined that the ongoing induction process used in the company is very weak and is required to be improved immediately. The purpose of the project is to implement a well structure induction process that can improve the level of satisfaction among the company associates. The newly structured induction process will be introduced to the hired new employees of the business organization. From the new induction structure the employees will become much clear about the company policy and practices. 1.2 Benefits can be obtained from this project Whenever a business hires new employees it becomes their duty to introduce the rules and policies of the company to them. The small businesses do not have any such formal policies but the large organizations always have such policies. It helps to improve the organizational culture. The induction approach is somewhere different from the actual job training. This approach helps to maintain solid organizational culture among the working employees. Strong organizational culture always helps to enhance the employee morale and teamwork at the same time. Any organization has a good orientation or training program can also increase the potential for constant development program. Impractical induction program can lead a company
2PROJECT MANAGEMENT towards failure. It is the responsibility of the company HR department to design the induction program in such a way so that all the associate employees get much familiar with the company policy and procedure. It will give positive morale to the employees. 1.3 Budget In order to design the new induction program for ABC software private Limited a feasibility study is being conducted by the project head at the project initiation phase to make sure that the project outcomes are beneficial from the business and consumers perspectives. The new budget estimated for the induction program development project is $70,000. 1.4 Deadline After analyzing the details of the project it is determined that the induction program improvement project should be accomplished within 2 months. 1.5 Signoff approval After completion of the entire project design phase the project manager and the sponsors need to approve the final project document. However, the project document needs to be followed by the project team members and the other project stakeholders. b. Project plan 2.1 Background The existing induction program of the ABC private Limited is very week and therefore, theemployeesarenotmuchfamiliarwiththecompanynormsandpolicies.Lackof understanding in norms and policies lead any company towards massive failure. In order to give a better understanding to the staffs the HR executive of the company should improve their
3PROJECT MANAGEMENT existing induction program for the newly recruited employees. It is assumed that a successful induction program will also provide a better understanding to the employees. 2.2 Aims and objectives 2.2.1 Aims Induction program is referred to as that specific approach which helps to build bidirectional relationshipbetweentheorganizationandtheirworkingemployees.Theorganizationis committed to recruit new staffs for the upcoming Information System development project. The aim of the project is to design and implement a high quality induction program to professionally let the employees know about the company policy and procedure. 2.2.2 Objectives To provide comprehensive induction regarding the roles and responsibilities of the recruited employees To let the employees familiar about the current policies and procedures To make the workplace environment much effective and employee oriented 2.3 Target group and stakeholders The stakeholders of this specific project are employees, sponsors, HR department, company finance manager and facility manager. Apart from this, the target groups for this specific project are the newly hired employees and the existing employees as well. 2.4 Methods There are different methods that are widely followed by the business organization to develop any project such as agile, scrum, waterfall etc. After analyzing the project derails it is
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
4PROJECT MANAGEMENT determined that, for this specific project the development method that has to be considered is the agile. 2.5 Task breakdown HR management plan Project initiation Understanding HR requirements HR plan designing Assigning roles and responsibilities Authority Competency analysis Developing project organizational chart Staff management plan Project planning Feasibility study Resource management plan Communication management plan Risk management plan Developing health and safety policy Stakeholder analysis and stakeholder management plan Conflict management program Project execution phase Executing details of HR management program Induction plan for the project Details session planning of induction Welcome address from the HR executives and company head Taking ntroduction from the new employees Company policy and processes discussion Discussion on company rules and regulations Discussion about person responsibilities for each of the agenda Discussion regarding the operation of the company and goals Project closure List of penalties Success staircases Future direction with ultimate incentive structure Figure 1: Task Breakdown Structure of the project (Source: created by author) 2.6 Resources Resource NameTypeMax. UnitsStd. RateBase Calendar Project managerWork100%$50.00/hrStandard HR managerWork100%$22.00/hrStandard Finance managerWork100%$35.00/hrStandard Operation managerWork100%$40.00/hrStandard SponsorsWork100%$60.00/hrStandard Business analystWork100%$48.00/hrStandard cateringMaterial$2,000.00 accommodationMaterial$4,000.00 staffingWork100%$50.00/hrStandard
5PROJECT MANAGEMENT 2.7 Record keeping In order to keep the records of confidential information the organization uses an Information management system. 2.7 Evaluation In this phase the project plan is evaluated considering all the employee and business requirements. 2.8 Approval Whether the project is successful or not is measured by the project manager and sponsors and the final project is approved by both the project manager and the sponsors. c. Budget The total budget estimated for the project is give in the below section and it is recognized that the budget should not exceed $70,000. It is not always necessary that the planned cost will be equal to actual cost. It is the responsibility of the finance manager to design the cost in such a way so that it can maintain the planned cost. If the actual cost exceeds the planned cost then it will display that the project is not successful. The variance between planned cost and the actual cost is elaborated in the below section. WB STask NameDurationResource NamesCost % Work Complet e Actual Cost 0HR management plan46 days$67,992.0 058%$60,286.4 0 1Project initiation18 days$6,544.00100%$6,544.00 1.1Understanding HR requirements2 daysProject manager$800.00100%$800.00 1.2HR plan designing3 daysHR manager$528.00100%$528.00
6PROJECT MANAGEMENT 1.3Assigning roles and responsibilities3 daysHR manager$528.00100%$528.00 1.4Authority2 daysProject manager$800.00100%$800.00 1.5Competency analysis3 daysOperation manager$960.00100%$960.00 1.6Developing project organizational chart2 daysBusiness analyst$768.00100%$768.00 1.7Staff management plan3 daysOperation manager, staffing$2,160.00100%$2,160.00 2Project planning12 days$55,128.0 073%$53,742.4 0 2.1Feasibility study3 daysFinance manager$840.00100%$840.00 2.2Resource management plan2 days Project manager, accommodation[1],c atering [1],staffing $51,600.0 0100%$51,600.0 0 2.3Communication management plan1 dayHR manager$176.00100%$176.00 2.4Risk management plan2 daysBusiness analyst$768.0050%$384.00 2.5Developing health and safety policy2 daysProject manager$800.0050%$400.00 2.6 Stakeholder analysis and stakeholder management plan 2 daysBusiness analyst$768.0040%$307.20 2.7Conflict management program1 dayHR manager$176.0020%$35.20 3Project execution phase10 days$4,560.000%$0.00 3.1 Executing details of HR management program 7 days$3,056.000%$0.00 3.1.1Induction plan for the project2 daysBusiness analyst$768.000%$0.00 3.1.2Details session planning of induction2 daysSponsors$960.000%$0.00 3.1.3 Welcome address from the HR executives and company head 3 daysHR manager$528.000%$0.00 3.1.4 Taking introduction from the new employees 2 daysProject manager$800.000%$0.00 3.2Company policy and processes 4 days$1,504.000%$0.00
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
7PROJECT MANAGEMENT discussion 3.2.1 Discussion on company rules and regulations 2 daysProject manager$800.000%$0.00 3.2.2 Discussion about person responsibilities for each of the agenda 1 dayOperation manager$320.000%$0.00 3.2.3 Discussion regarding the operation of the company and goals 1 dayBusiness analyst$384.000%$0.00 4Project closure6 days$1,760.000%$0.00 4.1List of penalties2 daysHR manager$352.000%$0.00 4.2Success staircases2 daysBusiness analyst$768.000%$0.00 4.3 Future direction with ultimate incentive structure 2 daysOperation manager$640.000%$0.00
8PROJECT MANAGEMENT Figure 1: Gantt char tracking for the project (Source: Created by author) d. Risk assessment register Risk IdName of the risk ImpactLikelihoodProbabilityMitigation approach R12Lackof knowledge amongthe projectteam Major (4)Possible (3)High 12Developing trainingand development program
9PROJECT MANAGEMENT members R14Improper estimationof budget Catastrophic (5) Highly Probable (4) Extreme (20)Feasibility study R2Inaccurate time management Moderate (3)Possible (3)Medium (9)Accuratetime management plan R10Lackof marketing managerial approaches Insignificant (1) Remote (1)Low (1)Marketing plan implementation attheproject initiation phase R25Riskswith external hazards Minor (2)Unlikely (3)Medium (6)Identification of the external hazards e. Induction plan WBSTask NameDurationStartFinish 0Detail session induction plan0.69 daysWed 1/2/19Wed 1/2/19 1Induction plan for the project30 minsWed 1/2/19Wed 1/2/19 2Details session plan for a day15 minsWed 1/2/19Wed 1/2/19 3Welcome address from the HR executives of the company30 minsWed 1/2/19Wed 1/2/19 4Introduction of the new joiners30 minsWed 1/2/19Wed 1/2/19 5Company policy and processes discussion30 minsWed 1/2/19Wed 1/2/19 6Discussion on company rules and regulations30 minsWed 1/2/19Wed 1/2/19 7Discussion about person responsibilities for each of the agenda30 minsWed 1/2/19Wed 1/2/19
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
10PROJECT MANAGEMENT 8Discussion regarding the operation of the company and goals15 minsWed 1/2/19Wed 1/2/19 9List of penalties30 minsWed 1/2/19Wed 1/2/19 10Success staircases1 hrWed 1/2/19Wed 1/2/19 11Future direction with ultimate incentive structure1 hrWed 1/2/19Wed 1/2/19 f. Communication plan WhoWhenHowRegularity of communication Project manager and projectteam members Projectinitiation phase Discussingproject overview Monthly Project manager and projectteam members Initiation phaseSharingproject outlinesMonthly Operationmanager andprojectteam members Planning phaseRegarding the project risks Monthly HRmanagerand projectteam members Projectplanning phase Discussingrolesand responsibilities of the project associates Weekly Projectmanager, sponsorsand operation manager Project manager and projectteam members About current status of the project Weekly
11PROJECT MANAGEMENT PART 2 f. According to the organizational chart I should report to the Chairperson of the company. g. 10 numbers of staff members needs to report to me. h. The two different areas that are to be informed on progress on this include team performance and team collaboration. As much collaboration the project team members will show that faster the project activities will be successfully accomplished. i. All critical issues that are occurring in the HR departments must be informed to the associate project chairperson. j. I would prefer to use open communication while communicating with the project team members regarding the changes will be implementing in the HR induction program. Organizational information k. The main objectives of the organization are as follows: To provide coaches through which the performance of the team will be improved To increase the rate of participation in sport event To make all the spots event sustainable one l.Anyprojectthatisdesignedundersurveillanceofprojectmanagerandother organizational executives must be designed considering the mission, vision and goals of the organization and operational excellence. Before pointing out target market mission, vision and goals are to be designed and aligned with project development.
12PROJECT MANAGEMENT Assessment Task 2: Short answer question Answer to question 1 While working for any project it is very much crucial to clarify all relevant project queries from the parties regarding budget, line, scope and project etc. In order to avoid overrunning budget, over allocated time and other operational issues these queries should be clarified. Even at the project initiation phase the needful additional resources are also needed to be considered by the project managers to ensure that during the ongoing period no such additional cost is needs. Sudden requirement on additional cost can turn the success of any project towards failure. Answer to question 2 It is the responsibility of the project manager to use performance measurement matrix to make sure that all the project team members are aware of their job roles and responsibilities. The scope of performance evaluation exam will make the project team members understand about how much clear the members is regarding the project requirements, aim and goals. Based on project understanding the members should design and develop the reporting requirements in terms of project status report etc. It will help the project team members become much familiar with project requirements and objectives. Answer to question 3 It is very much important to identify the relationship of the project with the other ongoing projects in the organization. If many project are at a time running in an organization then in most cases it is defined that those projects are interrelated to each other. It will provide clear guidance and direction to the project team members. Apart from this, it will help to identify the motive of
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
13PROJECT MANAGEMENT the employees and the basis of the project budget and plan as well. Once the relationship among the ongoing projects will be identified that clear the project objectives will become for the project team members. Answer to question 4 While managing any project it is crucial for the project managers and the other team members to become very clear about project management tools. Different project management tools are available in the competitive market and based on the background of the project the projectmanagershouldselectandapplythemostsuitableprojectmanagementtoolto accomplish their project. The examples of such tools include quire, Clarizen and JIRA. Answer to question 5 During the project management phase the strategies should be applied by the project manager are professional communication and meeting agenda. Apart from thisthe other strategies are as follows: Finalization details of the project Clear expectation setting Selection of correct team as well as system Defining project milestones Evaluation of project after successful completion Answer to question 6 In order to keep the project team members engaged to their roles and job responsibilities it is very much crucial to implement different employee retention strategies in terms if employee compensation, employee empowerment and employee commitment. Apart from this, direct
14PROJECT MANAGEMENT reward and motivation are the other two aspects those are required to improve the relationship between the project team members and the project objectives. The other support that can be provided to the project team members include employee satisfaction, job satisfaction, higher productivity, discipline, job dynamics etc. Answer to question 7 Risk management is referred to as one of the major facilities that help the project team members to identify the possible interruptions that may interrupt the success path of any project. Risk management can elevate communication and help the project team members to take effective project level decisions. Before identifying the project target group potential risks are to be identified and based on the priorities the risk mitigation approaches are also should be identified by the project manager. Answer to question 8 In order to assign the new job roles and responsibilities to the project team members and project manager it is mandatory to design a new Responsibility Access Matrix (RAM). In order to manage the process accurately the other aspects to be considered include this matrix is very much helpful as it will display the details of the roles and responsibilities of the project team associates. Answer to question 9 Project Budget Plan BudgetActualVariance Personal Salaries and wages23,00026750(-)3750
15PROJECT MANAGEMENT Marketing communication Advertisement355521101445 Web sites1120870250 EventsMarketing communication total 1065011125(-)475 Others Postage23022010 Telephone12010020 Travel1800180 Other total i) The item which has the biggest positive variance is website ii) The item which has the negative variance event marketing communication total iii) The total actual expenditure for the project is 41175 iv) The total budget estimated for the project is 38855 and the actual budget is 41175 . Therefore, the project come over budget in total and the amount is (38855- 41175) = (-) 2320.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
16PROJECT MANAGEMENT Answer to Question 10 a)Anti discrimination law: This law provides civil rights to the project team members regardingtheemploymentbasedoncolor,ethnicorigin,raceetc.Itprovidesantiage discrimination law for the employee who are older than 40. b)Ethical Practice: Each organization needs to consider the ethical practices in their businesses to make sure that the company is getting competitive advantages, better staff attraction, retention, legal regulatory reasons and legacy etc. c)Codes of practices: While working in a project group the project manager should use opencommunicationtomakesurethatalltheemployeesareinteractingtoeachother professionally and sharing their creativity and knowledge with others. d)Privacy law: The privacy law gives the project team members a protection guideline for individuals however in most case it represents common sense as well as best project practices. It also provides a necessary framework that allows data economy fully for developing whilst and generate power to fight against all inherent risks. e)Workplace health and safety: All working employees have the right to expect a healthy as well as safe working environment. Though, it is a matter of cost but still it is mandatory for success of any project. Most of the people will agree that accidents and death of the employees are natural priorities. The employees should always get a compensation cost to keep them secure and much engaged to the job roles. f)Environmental issues:Different project level issues are there that needs to be mitigated sooner with the immediate implementation of the projects.
17PROJECT MANAGEMENT g)Copyright:In order to manage any large project without internal employee conflict the project manager needs to design scheduling, resource management, and budget and document presentation. With the help of this legal action each and individual project task will be managed appropriately by the employees and other associates.
18PROJECT MANAGEMENT BSBWORK502 Lead and Manage Team Effectiveness Assessment task 1- Short answer questions Answer to question 1 There are different strategies that are to be implemented by the project manager while ensuring clear requirements and responsibilities to all the project team members and the strategies are as follows: Using performance measurement matrices to measure the skills and abilities of the project associates For all related project management knowledge areas using key performance metrics Establishing open clear communication by avoiding scope creep and choosing appropriate team and supporting systems Answer to question 2 In order to keep the project members engaged to their job roles and responsibilities the three supports that are to be provided are as follows: Motivation, incentives and rewards based on performance Professional leadership to govern the project towards the goals and objectives The other supports are timely employee empowerment and conpensation
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
19PROJECT MANAGEMENT Answer to question 3 The different types of communication approaches that would help the project manager to easily communicate to the project team members and stakeholders are enlisted below: Open communication Vertical communication Horizontal communication and diagonal communication Answer to question 4 In an organization there are different ways through which a project manager can ensure that he or she is considered as a role model. Firstly, the behavior and approach of the team members to their project manager will make the person understand that whether they are admiring the motivation and leadership of the person or not. The trust of the team members to their managers also reflects what they feel about the manager. Answer to question 5 Being a workplace leader different strategies are used to involve others in the decision making process. The list of strategies is as follows: The organization should conduct mandatory survey where all the members should response The organization should maintain a suggestion box where all the team members are allowed to give suggestion regarding new decision making The organization should allow the team members to choose their desired training and development program. It will let them to take part in the organizational decision making
20PROJECT MANAGEMENT Answer to question 6 The line of communication needs to be open each time for all project team members because it provides the project team members an interactive platform where they can share their point of thinking, creative ideas and innovation to the project manager. During the project ongoing phase this interaction is crucial to keep the project manager clear regarding current status of the project and how future success can be obtained from the project outcome. Answer to question 7 The stages of group development are as follows: Forming: This is the very initial meeting among the members. In this period they introduce each other by sharing information about their interest, background and experiences. The members get to know about the project on which they will be working for. They learn regarding the main objectives, aims and goals. Team leaders make them aware about the project roles and responsibilities. Storming: In this phase they start working together. The team members compete with each other for idea acceptance and status. The different opinions are all considered in this phase to design the way through which the team members will support and guide the team associates. Norming: In this phase the project team members start working as a professional team. With the implementation of this phase they start working as a team instead of individuals. The other components that are considered in this phase include confronting issues, emergence of clear roles and responsibilities, skill development, new procedure establishment etc. Performing: This is the fourth phase which finally encourages the project team members to work for their assigned job roles successfully. The performances of individual lead the project
21PROJECT MANAGEMENT towardssuccess.Theeffectiveteamperformancehelpstheprojectmanagertoleadthe preliminary objectives and goals. Adjourning: This is the last phase of team or group development in project manager. In this phase the team members start moving to different directions as soon as the project comes to an end or completion. In order to achieve next endeavor the support that are required by project managers are also offered in this last phase of team development. Answer to question 8 Differenttypesofdifficultbehavioraretherewhichcanoccurinthebusiness organization and needs to be mitigated immediately. These difficult behaviors are as follows: Downers: These types of people are also known as negative Nancy’s and Debbie downers. They can spoil any type of healthy atmosphere by saying something bad to someone inside the organization. They also always keep themselves involved in complain, critique and judge. In other words these people are not at all predictable from the common organizational thinking perspectives. Tanks: These people mostly behave like explosive, handful and bossy in nature. They generally want to follow their own direction to reach the success point. In other words, they are mainly focused to achieve their goal regardless the oath or direction they are following to reach the goal.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
22PROJECT MANAGEMENT Answer to question 9 Work allocation Responsibilities of the managers or supervisor: The project manager or supervisors are responsible to develop project implementation strategies considering the defined project goals. They should define meaningful protocols as well policies including the project execution schedules. Responsibilities of the project team members The team members should have clear understanding regarding project objectives and purposes. They need to ensure accurate balance between the non project work and project work. They must contribute maximum in positive motivation and successful open communication. After identifying project deliverables and related constraints they should identify the project risks. No, the policy and procedures does not state any requirements regarding the need for work extenders continuous period of overtime due to the work allocation. Mentoring/Coaching From monitoring and coaching the performance of each individual team members will get improved and thus the overall team performance will also get improved. Mentoring shows correct direction to project team members so that they can successfully avoid internal team conflict and communication barriers. Mentoring relationship is as follows: Developing relationship of trust
23PROJECT MANAGEMENT Defining team members roles and responsibilities Establishment of short term and long term project goals Team collaboration for solving problems Mentoring process Investigation Identification Planning Conflict resolution Clarification regarding the disagreement Establishing proper common project goal for both the parties Discussion regarding the ways through which common project goal can meet Determining project success barriers Determining responsibilities of the project team members Answer to question 10 Technique that will be used to reward a team member who does a great job is -Reward the group as a whole for completing a project ahead of schedule Part 1 a) Project plan WBSTask NameDurationStartFinishResource NamesCost 0 Organizing event planning schedule 80 daysThu 12/20/18 Wed 4/10/19$20,752.00
25PROJECT MANAGEMENT new policy and procedures3/11/193/15/19 3.3Changes plan in the event6 daysMon 3/18/19 Mon 3/25/19Project manager$1,440.00 3.4 Final design of the event program 2 daysTue 3/26/19 Wed 3/27/19operation manager$560.00 3.5Hiring host for the event3 daysThu 3/28/19 Mon 4/1/19event management team$480.00 4Project closure7 daysTue 4/2/19 Wed 4/10/19$1,520.00 4.1Stakeholder signoff2 daysTue 4/2/19 Wed 4/3/19HR manager$320.00 4.2 Final document presentation 5 daysThu 4/4/19 Wed 4/10/19Project manager$1,200.00 1.1 Project summary In order to meet the organizational objectives in terms of competitive advantages and higher revenue the project manager should focus on organizing an event where they would be able to discuss regarding the 1.2 Benefits 1.3 Target group or stakeholders Project manager or project supervisor Finance manager Operation manager HR manager Event Organizer
26PROJECT MANAGEMENT 1.4 Task Breakdown Organizing event planning schedule Project initiation Identifying project objectives Identifying current risks operational gaps Highlighting the topic to be discussed in the event Listing name of the event participants Project document outlining Distribution of roles and responsibilities Project planning Accommodation plan Catering plan Listing VIP guest list Sending invitation Organizing event details Streamline processes Project execution Developing new organizational norms Developing new policy and procedures Changes plan in the event Final design of the event program Hiring host for the event Project closure Stakeholder signoff Final document presentation Figure 3: Task Breakdown structure of the project (Source: Created by author) 1.5 Cost Task NameDurationResource NamesCost Organizing event planning schedule80 days$20,752.00 Project initiation27 days$6,640.00 Identifying project objectives5 daysProject manager, event management team, Finance manager$3,120.00 Identifying current risks operational gaps6 daysevent management team$960.00 Highlighting the topic to be discussed in the event 5 daysoperation manager$1,400.00
27PROJECT MANAGEMENT Listing name of the event participants6 daysaccommodation[1]$0.00 Project document outlining3 daysoperation manager$840.00 Distribution of roles and responsibilities2 daysHR manager$320.00 Project planning24 days$7,752.00 Accommodation plan3 daysaccommodation[1],Finance manager$672.00 Catering plan5 dayscatering [1],event management team, Finance manager$1,920.00 Listing VIP guest list6 daysHR manager$960.00 Sending invitation5 daysoperation manager$1,400.00 Organizing event details4 daysevent management team, Project manager$1,600.00 Streamline processes5 daysProject manager$1,200.00 Project execution22 days$4,840.00 Developing new organizational norms6 daysHR manager$960.00 Developing new policy and procedures5 daysoperation manager$1,400.00 Changes plan in the event6 daysProject manager$1,440.00 Final design of the event program2 daysoperation manager$560.00 Hiring host for the event3 daysevent management team$480.00 Project closure7 days$1,520.00 Stakeholder signoff2 daysHR manager$320.00 Final document presentation5 daysProject manager$1,200.00 1.6 Deadlines The task is required to be completed within 80 days and must not exceed the more than 100 days.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
28PROJECT MANAGEMENT b) Communication plan WhoWhenHowRegularity of communication Projectmanager alongwithproject team members Initiation phaseRegardingproject objectives and goals Weekly Projectteam memberswith project supervisor Planning phaseAbouttheproject progress periodWeekly Project manager and operation manager Initiation phaseDiscussionregarding project operation that are to be accomplished throughout the project period Monthly HRmanagerand team members Project initiation and planning phase Rules,policyand procedures Weekly Projectteam memberswith project manager Initiation phaseCurrentfinancial status of the project Monthly c) Team communication
29PROJECT MANAGEMENT To The project team members This is to inform you that, we are planning to improve the current status of the organization by developing the HR policies and procedures. You are required to keep in touch with all the project activities in a weekly basis. In addition to this, you should also design and develop communication strategies, new ideas, progress, feedback, decision making approaches. In each and every phase of the project development you are needed to deal with all the items. I would want you to follow all the rules and regulations to accomplish the project activates. -Project manager
30PROJECT MANAGEMENT References Awang, Z., Hashim, N. N., Yaziz, N. M., & Asmuni, N. S. (2015). Assessing customer intention towards the use of website on online air ticket booking.Editors, 686. Bowers,J.,&Khorakian,A.(2014).Integratingriskmanagementintheinnovation project.European Journal of innovation management,17(1), 25-40. Calvo-Mora, A., Navarro-García, A., & Periañez-Cristobal, R. (2015). Project to improve knowledgemanagementandkeybusinessresultsthroughtheEFQMexcellence model.International Journal of Project Management,33(8), 1638-1651. Fernandez-Cavia, J., Rovira, C., Díaz-Luque, P., & Cavaller, V. (2014). Web Quality Index (WQI)forofficialtouristdestinationwebsites.Proposalforanassessment system.Tourism management perspectives,9, 5-13. Fleming, Q. W., & Koppelman, J. M. (2016, December). Earned value project management. Project Management Institute. Ghosal, S., Chaturvedi, S., Taywade, A., & Jaisankar, N. (2015). Android application for ticket bookingand ticketcheckinginsuburbanrailways.IndianJournal ofScienceand Technology,8(S2), 171-178. Larson, E. W., & Gray, C. F. (2014). Project Management: The Managerial Process with MS Project. Laudon, K. C., & Laudon, J. P. (2016).Management information system. Pearson Education India.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
31PROJECT MANAGEMENT Mir, F. A., & Pinnington, A. H. (2014). Exploring the value of project management: linking project management performance and project success.International journal of project management,32(2), 202-217. Nicholas, J. M., & Steyn, H. (2017).Project management forengineering, business and technology. Taylor & Francis. Peppard, J., & Ward, J. (2016).The strategic management of information systems: Building a digital strategy. John Wiley & Sons. Pinto, J. K., Dawood, S., & Pinto, M. B. (2014). Project management and burnout: Implications of the Demand–Control–Support model on project-based work.International Journal of Project Management,32(4), 578-589. Ramazani, J., & Jergeas, G. (2015). Project managers and the journey from good to great: The benefitsof investment in projectmanagementtraining and education.International Journal of Project Management,33(1), 41-52. Schwalbe, K. (2015).Information technology project management. Cengage Learning. Snyder, C. S. (2014). A Guide to the Project Management Body of Knowledge: PMBOK (®) Guide. Project Management Institute. Tamizharsi, T., Suhasaria, P., Agarwal, A., Manchanda, H., & Jain, H. (2017). A Comprehensive Review of the Bookmyshow Website and System.Imperial Journal of Interdisciplinary Research,3(8).