Running head: PROJECT MANAGEMENT ASSIGNMENT
Project Management Assignment
Name of the Student:
Student ID:
Name of the University:
Author’s note:
Project Management Assignment
Name of the Student:
Student ID:
Name of the University:
Author’s note:
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
2PROJECT MANAGEMENT ASSIGNMENT
Section 1
1. Why are accurate estimates critical to effective project management?
The accurate estimates in project management are helpful for the execution of the improved
project planning and developing the proper project execution for Advantage Energy Technology
Data Center Migration. The implication of the accurate measurement not only helps in
scheduling the project but also helps in calculating the project estimates. The alignment would
also be helpful for aligning the utilization of the improved communication process. The
completion of the project plan would be based on the accurate estimates done.
2. What are the differences between bottom-up and top-down estimating approaches? Under
what conditions would you prefer one over the other?
The differences between the bottom up and top down estimation are helpful for forming the
major alignment of the activities and utilization of the improved estimation methods. The top
down approach defines task that have direct impact on project and it form clear insights while
defining the operations for Advantage Energy Technology Data Center Migration. The bottom
up approach is dependent on the calculation of the activities. The utilization would be helpful for
forming the successive implication of the operations and it would also successful formation of
the operations. The bottom up and top down estimation would also be formed for considering the
alignment of the information related to the development of the specific information processing.
The development of the activities had supported the utilization of the effective implication of the
activities so that the operations can be adjusted with the cost estimation for Advantage Energy
Technology Data Center Migration.
3. What are the major types of costs? Which costs are controllable by the project manager?
Section 1
1. Why are accurate estimates critical to effective project management?
The accurate estimates in project management are helpful for the execution of the improved
project planning and developing the proper project execution for Advantage Energy Technology
Data Center Migration. The implication of the accurate measurement not only helps in
scheduling the project but also helps in calculating the project estimates. The alignment would
also be helpful for aligning the utilization of the improved communication process. The
completion of the project plan would be based on the accurate estimates done.
2. What are the differences between bottom-up and top-down estimating approaches? Under
what conditions would you prefer one over the other?
The differences between the bottom up and top down estimation are helpful for forming the
major alignment of the activities and utilization of the improved estimation methods. The top
down approach defines task that have direct impact on project and it form clear insights while
defining the operations for Advantage Energy Technology Data Center Migration. The bottom
up approach is dependent on the calculation of the activities. The utilization would be helpful for
forming the successive implication of the operations and it would also successful formation of
the operations. The bottom up and top down estimation would also be formed for considering the
alignment of the information related to the development of the specific information processing.
The development of the activities had supported the utilization of the effective implication of the
activities so that the operations can be adjusted with the cost estimation for Advantage Energy
Technology Data Center Migration.
3. What are the major types of costs? Which costs are controllable by the project manager?
3PROJECT MANAGEMENT ASSIGNMENT
The major cost estimation for the project of Advantage Energy Technology Data Center
Migration for the alignment of the improved functional development. The various cost factors for
the project are listed for the development of the activities like,
Estimation of the project budget for the development of the accurate and estimated
project budget
Labour Cost for the project implementation management and alignment would be
deployed for forming the development
Estimation of the non labour costs for the work in alignment of the activities
4. Define what a “white elephant” is in project management? Provide a real-life example.
White Elephant is a term used for the representation of the loss in business developing the
improved activities for the profit development and utilization for the deployment of the activities.
The white elephant for the projects are required for listing the utilization of the assigned
development methodology forming successively and aligning the implication of the operations.
5. How are WBS and project networks linked?
The WBS and project networks are related to the deployment of the effective diagram in a
sequential network. The project network development would be employed for the alignment of
the improved successive development of the operations and it would help in easing the phase
development of the listing. The WBS and project networks would be helpful for aligning with
the utilization of the specific organization.
The major cost estimation for the project of Advantage Energy Technology Data Center
Migration for the alignment of the improved functional development. The various cost factors for
the project are listed for the development of the activities like,
Estimation of the project budget for the development of the accurate and estimated
project budget
Labour Cost for the project implementation management and alignment would be
deployed for forming the development
Estimation of the non labour costs for the work in alignment of the activities
4. Define what a “white elephant” is in project management? Provide a real-life example.
White Elephant is a term used for the representation of the loss in business developing the
improved activities for the profit development and utilization for the deployment of the activities.
The white elephant for the projects are required for listing the utilization of the assigned
development methodology forming successively and aligning the implication of the operations.
5. How are WBS and project networks linked?
The WBS and project networks are related to the deployment of the effective diagram in a
sequential network. The project network development would be employed for the alignment of
the improved successive development of the operations and it would help in easing the phase
development of the listing. The WBS and project networks would be helpful for aligning with
the utilization of the specific organization.
4PROJECT MANAGEMENT ASSIGNMENT
Ta
sk
Na
m
e
Re
cru
it
me
nt
of
Bri
an
Hi
rin
g
of
Co
ntr
act
or
Or
der
ing
Ne
w
Ra
ck
s
Or
der
ing
Ne
w
Ca
ble
s
De
liv
ery
of
the
rac
ks
Pro
jec
t
Bo
ard
Me
eti
ng
Proj
ect
Sco
pe
Pre
sent
atio
n
Pro
ject
tea
m
Rec
ruit
me
nt
Pro
jec
t
Te
am
Me
eti
ng
Ne
tw
ork
De
sig
nin
g
De
velop
ment
of
Venti
lation
Syste
m
Repla
cing all
old
power
supplie
s and
data
center
Ins
tallin
g the
venti
latio
n
syste
m
I
nst
alli
ng
the
rac
ks
R
eno
vati
on
of
data
cent
er
App
roval
of
constr
uction
of
raised
floor
In
stall
ing
po
wer
sup
plie
s
In
stall
ing
run
nin
g
cabl
es
S
wit
cho
ver
Ap
pro
val
Pow
er
check
of
racks
for
suffici
ent
voltag
e
I
nst
alli
ng
test
ser
ver
s
Testin
g all
primary
network
functio
ns in
the
server
Ne
tw
ork
is
tak
en
off
C
har
gin
g
of
bat
teri
es
I
nst
alli
ng
ve
ntil
ati
on
Te
st
serv
ers
are
up
and
runn
ing
Sign
ing
off
the
Prima
ry
Syste
m
Check
s
Da
te is
set
for
netw
ork
trans
fer
Ne
tw
ork
M
ov
eo
ver
Pr
oj
ect
is
Cl
os
ed
Pr
oj
ect
M
an
ag
er
I R I R I A I I R I R I I
Fa
cil
ity
C R C R R R R R C R R R C R R R
O
pe
rat
or
I I I I
Te
lec
o
m
m
un
ica
tor
A C A A A C A A A A A A A A A A A A A A
Sy
ste
m
De
ve
lo
pe
r
I C C R C R C C C R C C R C C C A
Co
ntr
act
or
C I C I C R A A C C I C A A I C C
Ve
nd
R
Ta
sk
Na
m
e
Re
cru
it
me
nt
of
Bri
an
Hi
rin
g
of
Co
ntr
act
or
Or
der
ing
Ne
w
Ra
ck
s
Or
der
ing
Ne
w
Ca
ble
s
De
liv
ery
of
the
rac
ks
Pro
jec
t
Bo
ard
Me
eti
ng
Proj
ect
Sco
pe
Pre
sent
atio
n
Pro
ject
tea
m
Rec
ruit
me
nt
Pro
jec
t
Te
am
Me
eti
ng
Ne
tw
ork
De
sig
nin
g
De
velop
ment
of
Venti
lation
Syste
m
Repla
cing all
old
power
supplie
s and
data
center
Ins
tallin
g the
venti
latio
n
syste
m
I
nst
alli
ng
the
rac
ks
R
eno
vati
on
of
data
cent
er
App
roval
of
constr
uction
of
raised
floor
In
stall
ing
po
wer
sup
plie
s
In
stall
ing
run
nin
g
cabl
es
S
wit
cho
ver
Ap
pro
val
Pow
er
check
of
racks
for
suffici
ent
voltag
e
I
nst
alli
ng
test
ser
ver
s
Testin
g all
primary
network
functio
ns in
the
server
Ne
tw
ork
is
tak
en
off
C
har
gin
g
of
bat
teri
es
I
nst
alli
ng
ve
ntil
ati
on
Te
st
serv
ers
are
up
and
runn
ing
Sign
ing
off
the
Prima
ry
Syste
m
Check
s
Da
te is
set
for
netw
ork
trans
fer
Ne
tw
ork
M
ov
eo
ver
Pr
oj
ect
is
Cl
os
ed
Pr
oj
ect
M
an
ag
er
I R I R I A I I R I R I I
Fa
cil
ity
C R C R R R R R C R R R C R R R
O
pe
rat
or
I I I I
Te
lec
o
m
m
un
ica
tor
A C A A A C A A A A A A A A A A A A A A
Sy
ste
m
De
ve
lo
pe
r
I C C R C R C C C R C C R C C C A
Co
ntr
act
or
C I C I C R A A C C I C A A I C C
Ve
nd
R
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
5PROJECT MANAGEMENT ASSIGNMENT
or
Ci
ty
In
sp
ect
or
I A I C I C I I I C I I C I I I
Cl
ie
nt
R A A R R R R R R
or
Ci
ty
In
sp
ect
or
I A I C I C I I I C I I C I I I
Cl
ie
nt
R A A R R R R R R
6PROJECT MANAGEMENT ASSIGNMENT
6. Why bother creating a WBS? Why not go straight to a project network and forget the WBS?
Work Breakdown Structure is developed using an effective task alignment using the improved
development of the alignment methods for successful alignment of the documentation. The
development of the WBS is helpful for the alignment of the improved functional development
model. The work breakdown structure is helpful for forming the specific work packages that
would be helpful for the utilization and the alignment would be deployed for forming the listing
of the specific development of the activities.
If no WBS would be included it would be aligned with the improvisation of the effective
implication and deployment of the effective project listing and deployment. The alignment of the
effective utilization would be aligned for forming the effective listing of the WBS network.
7. Why is slack important to the project manager?
The slack helps the project manager for the calculation of the delay in the project and it would
allow the specific project operations for forming the block diagram for aligning with the
development of the specific tools for integrating the formation and it would be formed for listing
the utilization of the effective development models.
8. What is the difference between free slack and total slack?
The free slack does not form any specific influence in the project activities and it results in
forming the specific alignment of the operations. The total slack cause the impacts on the
preceding activities of the project and not on the effective operations for the project.
9. Why are lags used in developing project networks?
6. Why bother creating a WBS? Why not go straight to a project network and forget the WBS?
Work Breakdown Structure is developed using an effective task alignment using the improved
development of the alignment methods for successful alignment of the documentation. The
development of the WBS is helpful for the alignment of the improved functional development
model. The work breakdown structure is helpful for forming the specific work packages that
would be helpful for the utilization and the alignment would be deployed for forming the listing
of the specific development of the activities.
If no WBS would be included it would be aligned with the improvisation of the effective
implication and deployment of the effective project listing and deployment. The alignment of the
effective utilization would be aligned for forming the effective listing of the WBS network.
7. Why is slack important to the project manager?
The slack helps the project manager for the calculation of the delay in the project and it would
allow the specific project operations for forming the block diagram for aligning with the
development of the specific tools for integrating the formation and it would be formed for listing
the utilization of the effective development models.
8. What is the difference between free slack and total slack?
The free slack does not form any specific influence in the project activities and it results in
forming the specific alignment of the operations. The total slack cause the impacts on the
preceding activities of the project and not on the effective operations for the project.
9. Why are lags used in developing project networks?
7PROJECT MANAGEMENT ASSIGNMENT
The lags are responsible for the change in duration of the activities and formation of the specific
development model. The increase and decrease in schedule would show the direct formation of
the activities. The lags would result in forming the utilization of the specific development of
operations.
10. What is a hammock activity, and when is it used?
Hammock activity would be helpful for aligning the utilization of the two tasks and grouping
them in dates. It helps in forming the project activities and running of the formative utilization.
Section 2
Implementation plan
The implementation plan is developed for implementing the utilization of the effective plan
development and utilization of the project activities. The following work breakdown structure
would be developed using the effective plan implementation. The alignment would be implied
for lining the project plan development. The alignment would be deployed for lining the
utilization of the effective implication and development formation. The implementation would be
deployed and it would be formed for listing the implication development.
The lags are responsible for the change in duration of the activities and formation of the specific
development model. The increase and decrease in schedule would show the direct formation of
the activities. The lags would result in forming the utilization of the specific development of
operations.
10. What is a hammock activity, and when is it used?
Hammock activity would be helpful for aligning the utilization of the two tasks and grouping
them in dates. It helps in forming the project activities and running of the formative utilization.
Section 2
Implementation plan
The implementation plan is developed for implementing the utilization of the effective plan
development and utilization of the project activities. The following work breakdown structure
would be developed using the effective plan implementation. The alignment would be implied
for lining the project plan development. The alignment would be deployed for lining the
utilization of the effective implication and development formation. The implementation would be
deployed and it would be formed for listing the implication development.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
8PROJECT MANAGEMENT ASSIGNMENT
Advantage Energy
Technology Data Center
Migration
Resource Plan
Requirment Analysis
Hiring Brian
New Racks are
ordered
New Cables are
ordered
Rack Delivery
Initialization
Board Meeting
Presentation Scope
Recruitment Team
Team Meeting
Construction Phase
Renovation data
centers
Constructing raised
floor
Installing Power
Supplies
Running Cables are
wired
Approval of
sw itchover
Development Phase
Design of network
Ventilation system is
developed
Old power supplies
are replaced
Ventilation system is
deployed
Racks are installed
Testing Phase
Checking for
required voltage in
the power racks
Test Servers are
installed
Network Functions
are installed
Battery change
Ventallation
Closure Phase
Sign off documents
Network Transfer is
set
Migration of network
Closed
Project budget estimates labour and non-labour
Resource Name Work Standard Rate Cost
Project Manager 160 hrs $100.00/hr $16,000.00
Facility 88 hrs $60.00/hr $5,280.00
Operator 80 hrs $80.00/hr $6,400.00
System Developer 256 hrs $95.00/hr $24,320.00
Contractor 40 hrs $90.00/hr $3,600.00
Vendor 56 hrs $75.00/hr $4,200.00
City Inspector 80 hrs $50.00/hr $4,000.00
Racks 1 $1,680.00 $1,680.00
Cables 1 $2,500.00 $2,500.00
Building Materials 1 $3,060.00 $3,060.00
Client 16 hrs $0.00/hr $0.00
Advantage Energy
Technology Data Center
Migration
Resource Plan
Requirment Analysis
Hiring Brian
New Racks are
ordered
New Cables are
ordered
Rack Delivery
Initialization
Board Meeting
Presentation Scope
Recruitment Team
Team Meeting
Construction Phase
Renovation data
centers
Constructing raised
floor
Installing Power
Supplies
Running Cables are
wired
Approval of
sw itchover
Development Phase
Design of network
Ventilation system is
developed
Old power supplies
are replaced
Ventilation system is
deployed
Racks are installed
Testing Phase
Checking for
required voltage in
the power racks
Test Servers are
installed
Network Functions
are installed
Battery change
Ventallation
Closure Phase
Sign off documents
Network Transfer is
set
Migration of network
Closed
Project budget estimates labour and non-labour
Resource Name Work Standard Rate Cost
Project Manager 160 hrs $100.00/hr $16,000.00
Facility 88 hrs $60.00/hr $5,280.00
Operator 80 hrs $80.00/hr $6,400.00
System Developer 256 hrs $95.00/hr $24,320.00
Contractor 40 hrs $90.00/hr $3,600.00
Vendor 56 hrs $75.00/hr $4,200.00
City Inspector 80 hrs $50.00/hr $4,000.00
Racks 1 $1,680.00 $1,680.00
Cables 1 $2,500.00 $2,500.00
Building Materials 1 $3,060.00 $3,060.00
Client 16 hrs $0.00/hr $0.00
9PROJECT MANAGEMENT ASSIGNMENT
Tele-communicator 112 hrs $80.00/hr $8,960.00
Priority Matrix
The priority matrix is developed for listing the alignment of the activities that would be
aligned for forming the utilization of the effective project development. The priority matrix
would be developed for easing the formation of the effective development method.
Time Performance Cost
Constraint
Enhance
Accept
Network Diagram
The network diagram is developed for aligning with the utilization of the effective
formation of the improved alignment of the formation development. The following diagram
would be developed for the alignment of the specific listing of the operations.
Tele-communicator 112 hrs $80.00/hr $8,960.00
Priority Matrix
The priority matrix is developed for listing the alignment of the activities that would be
aligned for forming the utilization of the effective project development. The priority matrix
would be developed for easing the formation of the effective development method.
Time Performance Cost
Constraint
Enhance
Accept
Network Diagram
The network diagram is developed for aligning with the utilization of the effective
formation of the improved alignment of the formation development. The following diagram
would be developed for the alignment of the specific listing of the operations.
10PROJECT MANAGEMENT ASSIGNMENT
0
Advantage Energy
Technology Data
Center Migration
1
Resource Plan
1.1
Requirment Analysis
1.2
Hiring Brian
1.3
New Racks are ordered
1.4
New Cables are
ordered
1.5
Rack Delivery
2
Initialization
2.1
Board Meeting
2.2
Presentation Scope
2.3
Recruitment Team
2.4
Team Meeting
3
Construction Phase
3.1
Renovation data
centers
3.2
Constructing raised
floor
3.3
Installing Power
Supplies
3.4
Running Cables are
wired
3.5
Approval of switchover
4
Development Phase
4.1
Design of network
4.2
Ventilation system is
developed
4.3
Old power supplies are
replaced
4.4
Ventilation system is
deployed
4.5
Racks are installed
5
Testing Phase
5.1
Checking for required
voltage in the power
racks
5.2
Test Servers are
installed
5.3
Network Functions are
installed
5.4
Battery change
5.5
Ventallation
6
Closure Phase
6.1
Sign off documents
6.2
Network Transfer is set
6.3
Migration of network
6.4
Closed
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
120 days 0%
6/1/18 11/15/18
21 days 0%
6/1/18 6/29/18
2 days 0%
6/1/18 6/4/18
3 days 0%
6/5/18 6/7/18
4 days 0%
6/8/18 6/13/18 5 days 0%
6/14/18 6/20/18
7 days 0%
6/21/18 6/29/18
11 days 0%
7/2/18 7/16/18
2 days 0%
7/2/18 7/3/18
3 days 0%
7/4/18 7/6/18
4 days 0%
7/9/18 7/12/18
2 days 0%
7/13/18 7/16/18
35 days 0%
7/17/18 9/3/18
7 days 0%
7/17/18 7/25/18
7 days 0%
7/26/18 8/3/18
7 days 0%
8/6/18 8/14/18
7 days 0%
8/15/18 8/23/18
7 days 0%
8/24/18 9/3/18
25 days 0%
9/4/18 10/8/18
5 days 0%
9/4/18 9/10/18 5 days 0%
9/11/18 9/17/18
5 days 0%
9/18/18 9/24/18
5 days 0%
9/25/18 10/1/18
5 days 0%
10/2/18 10/8/18
20 days 0%
10/9/18 11/5/18
4 days 0%
10/9/18 10/12/18
4 days 0%
10/15/18 10/18/18
4 days 0%
10/19/18 10/24/18
4 days 0%
10/25/18 10/30/18
4 days 0%
10/31/18 11/5/18
8 days 0%
11/6/18 11/15/18
2 days 0%
11/6/18 11/7/18
2 days 0%
11/8/18 11/9/18
2 days 0%
11/12/18 11/13/18
2 days 0%
11/14/18 11/15/18
Describe the estimated techniques
The project Gantt chart and the network diagram are used for the alignment of the
specific development of the activities. The top down approach defines task that have direct
impact on project and it form clear insights while defining the operations for Advantage Energy
Technology Data Center Migration. The bottom up approach is dependent on the calculation of
the activities. The utilization would be helpful for forming the successive implication of the
operations and it would also successful formation of the operations. The bottom up and top down
estimation would also be formed for considering the alignment of the information related to the
development of the specific information processing. The development of the activities had
0
Advantage Energy
Technology Data
Center Migration
1
Resource Plan
1.1
Requirment Analysis
1.2
Hiring Brian
1.3
New Racks are ordered
1.4
New Cables are
ordered
1.5
Rack Delivery
2
Initialization
2.1
Board Meeting
2.2
Presentation Scope
2.3
Recruitment Team
2.4
Team Meeting
3
Construction Phase
3.1
Renovation data
centers
3.2
Constructing raised
floor
3.3
Installing Power
Supplies
3.4
Running Cables are
wired
3.5
Approval of switchover
4
Development Phase
4.1
Design of network
4.2
Ventilation system is
developed
4.3
Old power supplies are
replaced
4.4
Ventilation system is
deployed
4.5
Racks are installed
5
Testing Phase
5.1
Checking for required
voltage in the power
racks
5.2
Test Servers are
installed
5.3
Network Functions are
installed
5.4
Battery change
5.5
Ventallation
6
Closure Phase
6.1
Sign off documents
6.2
Network Transfer is set
6.3
Migration of network
6.4
Closed
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
120 days 0%
6/1/18 11/15/18
21 days 0%
6/1/18 6/29/18
2 days 0%
6/1/18 6/4/18
3 days 0%
6/5/18 6/7/18
4 days 0%
6/8/18 6/13/18 5 days 0%
6/14/18 6/20/18
7 days 0%
6/21/18 6/29/18
11 days 0%
7/2/18 7/16/18
2 days 0%
7/2/18 7/3/18
3 days 0%
7/4/18 7/6/18
4 days 0%
7/9/18 7/12/18
2 days 0%
7/13/18 7/16/18
35 days 0%
7/17/18 9/3/18
7 days 0%
7/17/18 7/25/18
7 days 0%
7/26/18 8/3/18
7 days 0%
8/6/18 8/14/18
7 days 0%
8/15/18 8/23/18
7 days 0%
8/24/18 9/3/18
25 days 0%
9/4/18 10/8/18
5 days 0%
9/4/18 9/10/18 5 days 0%
9/11/18 9/17/18
5 days 0%
9/18/18 9/24/18
5 days 0%
9/25/18 10/1/18
5 days 0%
10/2/18 10/8/18
20 days 0%
10/9/18 11/5/18
4 days 0%
10/9/18 10/12/18
4 days 0%
10/15/18 10/18/18
4 days 0%
10/19/18 10/24/18
4 days 0%
10/25/18 10/30/18
4 days 0%
10/31/18 11/5/18
8 days 0%
11/6/18 11/15/18
2 days 0%
11/6/18 11/7/18
2 days 0%
11/8/18 11/9/18
2 days 0%
11/12/18 11/13/18
2 days 0%
11/14/18 11/15/18
Describe the estimated techniques
The project Gantt chart and the network diagram are used for the alignment of the
specific development of the activities. The top down approach defines task that have direct
impact on project and it form clear insights while defining the operations for Advantage Energy
Technology Data Center Migration. The bottom up approach is dependent on the calculation of
the activities. The utilization would be helpful for forming the successive implication of the
operations and it would also successful formation of the operations. The bottom up and top down
estimation would also be formed for considering the alignment of the information related to the
development of the specific information processing. The development of the activities had
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
11PROJECT MANAGEMENT ASSIGNMENT
supported the utilization of the effective implication of the activities so that the operations can be
adjusted with the cost estimation for Advantage Energy Technology Data Center Migration.
Project Timeline/Schedule
WBS Task Name Duration Start Finish
1 Resource Plan 21 days Fri 6/1/18 Fri 6/29/18
1.1 Requirement Analysis 2 days Fri 6/1/18 Mon 6/4/18
1.2 Hiring Brian 3 days Tue 6/5/18 Thu 6/7/18
1.3 New Racks are ordered 4 days Fri 6/8/18 Wed 6/13/18
1.4 New Cables are ordered 5 days Thu 6/14/18 Wed 6/20/18
1.5 Rack Delivery 7 days Thu 6/21/18 Fri 6/29/18
2 Initialization 11 days Mon 7/2/18 Mon 7/16/18
2.1 Board Meeting 2 days Mon 7/2/18 Tue 7/3/18
2.2 Presentation Scope 3 days Wed 7/4/18 Fri 7/6/18
2.3 Recruitment Team 4 days Mon 7/9/18 Thu 7/12/18
2.4 Team Meeting 2 days Fri 7/13/18 Mon 7/16/18
3 Construction Phase 35 days Tue 7/17/18 Mon 9/3/18
3.1 Renovation data centers 7 days Tue 7/17/18 Wed 7/25/18
3.2 Constructing raised floor 7 days Thu 7/26/18 Fri 8/3/18
3.3 Installing Power Supplies 7 days Mon 8/6/18 Tue 8/14/18
3.4 Running Cables are wired 7 days Wed 8/15/18 Thu 8/23/18
3.5 Approval of switchover 7 days Fri 8/24/18 Mon 9/3/18
4 Development Phase 25 days Tue 9/4/18 Mon 10/8/18
4.1 Design of network 5 days Tue 9/4/18 Mon 9/10/18
4.2 Ventilation system is developed 5 days Tue 9/11/18 Mon 9/17/18
supported the utilization of the effective implication of the activities so that the operations can be
adjusted with the cost estimation for Advantage Energy Technology Data Center Migration.
Project Timeline/Schedule
WBS Task Name Duration Start Finish
1 Resource Plan 21 days Fri 6/1/18 Fri 6/29/18
1.1 Requirement Analysis 2 days Fri 6/1/18 Mon 6/4/18
1.2 Hiring Brian 3 days Tue 6/5/18 Thu 6/7/18
1.3 New Racks are ordered 4 days Fri 6/8/18 Wed 6/13/18
1.4 New Cables are ordered 5 days Thu 6/14/18 Wed 6/20/18
1.5 Rack Delivery 7 days Thu 6/21/18 Fri 6/29/18
2 Initialization 11 days Mon 7/2/18 Mon 7/16/18
2.1 Board Meeting 2 days Mon 7/2/18 Tue 7/3/18
2.2 Presentation Scope 3 days Wed 7/4/18 Fri 7/6/18
2.3 Recruitment Team 4 days Mon 7/9/18 Thu 7/12/18
2.4 Team Meeting 2 days Fri 7/13/18 Mon 7/16/18
3 Construction Phase 35 days Tue 7/17/18 Mon 9/3/18
3.1 Renovation data centers 7 days Tue 7/17/18 Wed 7/25/18
3.2 Constructing raised floor 7 days Thu 7/26/18 Fri 8/3/18
3.3 Installing Power Supplies 7 days Mon 8/6/18 Tue 8/14/18
3.4 Running Cables are wired 7 days Wed 8/15/18 Thu 8/23/18
3.5 Approval of switchover 7 days Fri 8/24/18 Mon 9/3/18
4 Development Phase 25 days Tue 9/4/18 Mon 10/8/18
4.1 Design of network 5 days Tue 9/4/18 Mon 9/10/18
4.2 Ventilation system is developed 5 days Tue 9/11/18 Mon 9/17/18
12PROJECT MANAGEMENT ASSIGNMENT
4.3 Old power supplies are replaced 5 days Tue 9/18/18 Mon 9/24/18
4.4 Ventilation system is deployed 5 days Tue 9/25/18 Mon 10/1/18
4.5 Racks are installed 5 days Tue 10/2/18 Mon 10/8/18
5 Testing Phase 20 days Tue 10/9/18 Mon 11/5/18
5.1 Checking for required voltage in the power racks 4 days Tue 10/9/18 Fri 10/12/18
5.2 Test Servers are installed 4 days Mon 10/15/18 Thu 10/18/18
5.3 Network Functions are installed 4 days Fri 10/19/18 Wed 10/24/18
5.4 Battery change 4 days Thu 10/25/18 Tue 10/30/18
5.5 Ventilation 4 days Wed 10/31/18 Mon 11/5/18
6 Closure Phase 8 days Tue 11/6/18 Thu 11/15/18
6.1 Sign off documents 2 days Tue 11/6/18 Wed 11/7/18
6.2 Network Transfer is set 2 days Thu 11/8/18 Fri 11/9/18
6.3 Migration of network 2 days Mon 11/12/18 Tue 11/13/18
6.4 Closed 2 days Wed 11/14/18 Thu 11/15/18
4.3 Old power supplies are replaced 5 days Tue 9/18/18 Mon 9/24/18
4.4 Ventilation system is deployed 5 days Tue 9/25/18 Mon 10/1/18
4.5 Racks are installed 5 days Tue 10/2/18 Mon 10/8/18
5 Testing Phase 20 days Tue 10/9/18 Mon 11/5/18
5.1 Checking for required voltage in the power racks 4 days Tue 10/9/18 Fri 10/12/18
5.2 Test Servers are installed 4 days Mon 10/15/18 Thu 10/18/18
5.3 Network Functions are installed 4 days Fri 10/19/18 Wed 10/24/18
5.4 Battery change 4 days Thu 10/25/18 Tue 10/30/18
5.5 Ventilation 4 days Wed 10/31/18 Mon 11/5/18
6 Closure Phase 8 days Tue 11/6/18 Thu 11/15/18
6.1 Sign off documents 2 days Tue 11/6/18 Wed 11/7/18
6.2 Network Transfer is set 2 days Thu 11/8/18 Fri 11/9/18
6.3 Migration of network 2 days Mon 11/12/18 Tue 11/13/18
6.4 Closed 2 days Wed 11/14/18 Thu 11/15/18
13PROJECT MANAGEMENT ASSIGNMENT
Bibliography
Kerzner, H., (2017). Project management metrics, KPIs, and dashboards: a guide to measuring
and monitoring project performance. John Wiley & Sons.
Martinelli, R.J. and Milosevic, D.Z., (2016). Project management toolbox: tools and techniques
for the practicing project manager. John Wiley & Sons.
Nicholas, J.M. and Steyn, H., (2017). Project management for engineering, business and
technology. Taylor & Francis.
Schwalbe, K., (2015). Information technology project management. Cengage Learning.
Sears, S.K., Sears, G.A., Clough, R.H., Rounds, J.L. and Segner, R.O., (2015). Construction
project management. John Wiley & Sons.
Serra, C.E.M. and Kunc, M., 2015. Benefits realisation management and its influence on project
success and on the execution of business strategies. International Journal of Project
Management, 33(1), pp.53-66.
Snyder, C.S., (2014). A guide to the project management body of knowledge: PMBOK (®)
guide. Project Management Institute: Newtown Square, PA, USA.
Svejvig, P. and Andersen, P., (2015). Rethinking project management: A structured literature
review with a critical look at the brave new world. International Journal of Project
Management, 33(2), pp.278-290.
Bibliography
Kerzner, H., (2017). Project management metrics, KPIs, and dashboards: a guide to measuring
and monitoring project performance. John Wiley & Sons.
Martinelli, R.J. and Milosevic, D.Z., (2016). Project management toolbox: tools and techniques
for the practicing project manager. John Wiley & Sons.
Nicholas, J.M. and Steyn, H., (2017). Project management for engineering, business and
technology. Taylor & Francis.
Schwalbe, K., (2015). Information technology project management. Cengage Learning.
Sears, S.K., Sears, G.A., Clough, R.H., Rounds, J.L. and Segner, R.O., (2015). Construction
project management. John Wiley & Sons.
Serra, C.E.M. and Kunc, M., 2015. Benefits realisation management and its influence on project
success and on the execution of business strategies. International Journal of Project
Management, 33(1), pp.53-66.
Snyder, C.S., (2014). A guide to the project management body of knowledge: PMBOK (®)
guide. Project Management Institute: Newtown Square, PA, USA.
Svejvig, P. and Andersen, P., (2015). Rethinking project management: A structured literature
review with a critical look at the brave new world. International Journal of Project
Management, 33(2), pp.278-290.
1 out of 13
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.