Running head: PROJECT MANAGEMENT
Project Management: Information System Implementation Plan in Woolworths Limited
Name of the student:
Name of the university:
Project Management: Information System Implementation Plan in Woolworths Limited
Name of the student:
Name of the university:
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
1PROJECT MANAGEMENT
Executive summary
This report reflects how an Information System can improve the quality of services and products
of any organization. Not only this but also how the overall operational and functional efficiency
and effectiveness of the nominated organization Woolworths limited has been improved with the
implementation of Information system. The details information system implementation
processes and phases are elaborated in this report, In fact during planning and implementation of
the project the major knowledge areas of concern are also highlighted and discussed in this
report.
Executive summary
This report reflects how an Information System can improve the quality of services and products
of any organization. Not only this but also how the overall operational and functional efficiency
and effectiveness of the nominated organization Woolworths limited has been improved with the
implementation of Information system. The details information system implementation
processes and phases are elaborated in this report, In fact during planning and implementation of
the project the major knowledge areas of concern are also highlighted and discussed in this
report.
2PROJECT MANAGEMENT
Table of Contents
Introduction......................................................................................................................................3
Background of the project...............................................................................................................3
Details project management plan.....................................................................................................4
Project tools and techniques........................................................................................................8
Conclusion.......................................................................................................................................9
Recommendations..........................................................................................................................10
References......................................................................................................................................11
Appendix........................................................................................................................................14
Table of Contents
Introduction......................................................................................................................................3
Background of the project...............................................................................................................3
Details project management plan.....................................................................................................4
Project tools and techniques........................................................................................................8
Conclusion.......................................................................................................................................9
Recommendations..........................................................................................................................10
References......................................................................................................................................11
Appendix........................................................................................................................................14
3PROJECT MANAGEMENT
Introduction
This report depicts the positive impacts, competitive advantages and structured revenues
that an organization can obtain with the planning and implementation of an Information System.
The company which is nominated for producing this project includes an Australia based retail
company Woolworths Limited. Project management plan is referred to as one of the most
important and crucial operational practice that is required to be implemented by every business
organization to increase the scope of their future success and confirm their sustainability.
The list of challenges which the company is continuously facing and needed to be
resolved soon for future growth are elaborated in this report. It is determined that implementation
of Information System will increase the overall effectiveness and efficiency of the business
organization. Apart from this, each project based Knowledge areas should be individually
analyzed to ensure that no such operational issues are occurring in the company that can disrupt
the regular success of the project.
Background of the project
The company nominated for the report is Woolworths Limited, it’s headquarter is located
in New South Wales, Belle Vista, Australia. This retail company offers their services to
throughout Australia and New Zealand. Woolworths limited is one of the largest retail
companies in Australia. The company considers their consumers as the most important asset and
focuses on retain their consumers (Dos Santos, Svensson and Padin 2013). In the past few years
the company has opened around 3,000 stores all around Australia and New Zealand and
employed approximately 2021,000 team members who are serving their services to around 29
Introduction
This report depicts the positive impacts, competitive advantages and structured revenues
that an organization can obtain with the planning and implementation of an Information System.
The company which is nominated for producing this project includes an Australia based retail
company Woolworths Limited. Project management plan is referred to as one of the most
important and crucial operational practice that is required to be implemented by every business
organization to increase the scope of their future success and confirm their sustainability.
The list of challenges which the company is continuously facing and needed to be
resolved soon for future growth are elaborated in this report. It is determined that implementation
of Information System will increase the overall effectiveness and efficiency of the business
organization. Apart from this, each project based Knowledge areas should be individually
analyzed to ensure that no such operational issues are occurring in the company that can disrupt
the regular success of the project.
Background of the project
The company nominated for the report is Woolworths Limited, it’s headquarter is located
in New South Wales, Belle Vista, Australia. This retail company offers their services to
throughout Australia and New Zealand. Woolworths limited is one of the largest retail
companies in Australia. The company considers their consumers as the most important asset and
focuses on retain their consumers (Dos Santos, Svensson and Padin 2013). In the past few years
the company has opened around 3,000 stores all around Australia and New Zealand and
employed approximately 2021,000 team members who are serving their services to around 29
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
4PROJECT MANAGEMENT
Million consumers all over. Initially the company was not capable of providing online services to
their consumers but with timely technical advancements they started developed new offers and
services for their consumers.
However, due to the frequently increasing numbers of consumers, data management has
become a major issue which is required to be resolved by the operation owner of the company. It
is determined that implementation of the new system and its effective service can improve the
overall operation and functional activities of the organization (Havranek 2017). The aim of the
company is to help their members a financial security and affordable, competitive price savings
opportunities for any of those products they will buy. They are much focused to their brand
values and it include trust, excellent services, moral integrity, consistency, security and on time
response with affordable price for quality products.
Details project management plan
The project management lifecycle is comprises of different phases and based on the
project type, size and its complexity the project manager requires to select the most suitable
project development method. The project development methodologies that are widely considered
and applied by the project managers include Prince2, PMBOK, waterfall, Agile etc. Each of the
development methodologies is suitable for separate projects. For the software development
project the most suitable development methodology is Agile (Neves et al. 2014). However, for
this specific Information System design and Implementation project for Woolworths limited the
methodology that is chosen and applied is PMBOK (Project Management Body of Knowledge).
In order to implement the Information System project in Woolworths limited firstly the current
situation of the company is required to be analyzed and then possible changes should be
Million consumers all over. Initially the company was not capable of providing online services to
their consumers but with timely technical advancements they started developed new offers and
services for their consumers.
However, due to the frequently increasing numbers of consumers, data management has
become a major issue which is required to be resolved by the operation owner of the company. It
is determined that implementation of the new system and its effective service can improve the
overall operation and functional activities of the organization (Havranek 2017). The aim of the
company is to help their members a financial security and affordable, competitive price savings
opportunities for any of those products they will buy. They are much focused to their brand
values and it include trust, excellent services, moral integrity, consistency, security and on time
response with affordable price for quality products.
Details project management plan
The project management lifecycle is comprises of different phases and based on the
project type, size and its complexity the project manager requires to select the most suitable
project development method. The project development methodologies that are widely considered
and applied by the project managers include Prince2, PMBOK, waterfall, Agile etc. Each of the
development methodologies is suitable for separate projects. For the software development
project the most suitable development methodology is Agile (Neves et al. 2014). However, for
this specific Information System design and Implementation project for Woolworths limited the
methodology that is chosen and applied is PMBOK (Project Management Body of Knowledge).
In order to implement the Information System project in Woolworths limited firstly the current
situation of the company is required to be analyzed and then possible changes should be
5PROJECT MANAGEMENT
incorporate based on that. While implementing the project PMBOK phases that are o be
followed by the assigned project manager are as follows:
Project initiation: Project initiation is referred to as the first phase to be undertaken by
the project manager before planning the project. The goals of this project are to design and
develop an Information System to improve the current functional and operational activities. In
this phase, the goals, objectives and scope statement for the project are developed (Kaiser, El
Arbi and Ahlemann 2015). The feasibility and overall project values are successfully measured
in this phase. Not only this but also, the tools and techniques those are to be applied by the
project manager and team members are identified in this phase. According to Leveson (2015)
this specific phase incorporates the initial work crucial for creating as well as authorizing any
project. As per PMBOK the project manager must develop a project charter and identify the
required stakeholders in this phase. The project charter is an outline of a project which is
comprises of scope statement, initial project budget and primary stakeholders list.
Not only this but also the project manager should develop a business document that can
justify the project needs professionally (Scott et al. 2017). This includes potential financial
benefit estimation that is expected to be obtained from the successful implementation of the
Information System. The project enters to the project planning phase as soon as the initiation
phase is completed.
Project planning phase: It has been determined that, the project development phase are
inter connected to each other. It means that output of a previous phase acts as input to next phase.
In other words, if the output of any phase is determined as wrong then both the inputs and the
output of the next phase will be interrupted (McNeil, Frey and Embrechts 2015). The project
incorporate based on that. While implementing the project PMBOK phases that are o be
followed by the assigned project manager are as follows:
Project initiation: Project initiation is referred to as the first phase to be undertaken by
the project manager before planning the project. The goals of this project are to design and
develop an Information System to improve the current functional and operational activities. In
this phase, the goals, objectives and scope statement for the project are developed (Kaiser, El
Arbi and Ahlemann 2015). The feasibility and overall project values are successfully measured
in this phase. Not only this but also, the tools and techniques those are to be applied by the
project manager and team members are identified in this phase. According to Leveson (2015)
this specific phase incorporates the initial work crucial for creating as well as authorizing any
project. As per PMBOK the project manager must develop a project charter and identify the
required stakeholders in this phase. The project charter is an outline of a project which is
comprises of scope statement, initial project budget and primary stakeholders list.
Not only this but also the project manager should develop a business document that can
justify the project needs professionally (Scott et al. 2017). This includes potential financial
benefit estimation that is expected to be obtained from the successful implementation of the
Information System. The project enters to the project planning phase as soon as the initiation
phase is completed.
Project planning phase: It has been determined that, the project development phase are
inter connected to each other. It means that output of a previous phase acts as input to next phase.
In other words, if the output of any phase is determined as wrong then both the inputs and the
output of the next phase will be interrupted (McNeil, Frey and Embrechts 2015). The project
6PROJECT MANAGEMENT
planning phase is always underestimated. There are 10 different knowledge areas such as
(communication, risk, procurement, resource, stakeholders, quality, schedule, scope, time,
change) those are to be analyzed by the project managers and maintained by the project team
members at this phase.
The primary project management document is created in this phase which is known as
project management plan (Matyas and Pelling 2015). The instances of the project documents are
success factors, scope statement deliverables, schedules, budget estimation details, project
schedule, project time, Human Resource management plan, Quality management plan etc. In
this phase, the project success criteria and assumptions are also considered based on the scope
statement. The Information System implementation project is subdivided in this phase. The
project manager needs to assign distributive job roles for different team members considering
their skills and knowledge in managing projects (Kaiser, El Arbi and Ahlemann 2015). Before,
identification of the target customer project manager should identify the potential risks that may
interrupt the regular success of the project. While planning for the procurement management
plan proper external vendors should be identified and established to control the process.
Project execution phase: The project execution phase deals with bulk of project
activities. In this phase the project manager defines the progress and a project deliverable s
developed and completed stick to a complete mapped out planning. There are many tasks
associated to this phase which captures certain project metrics such as performance measurement
matrix, RACI matrix, .stakeholder matrix, Risk management Matrix etc (Bromiley et al. 2015).
At the end of this phase a performance report is produced by the project manager which defines
the additional project needs accordingly. This is referred to as one of te most crucial phase of
planning phase is always underestimated. There are 10 different knowledge areas such as
(communication, risk, procurement, resource, stakeholders, quality, schedule, scope, time,
change) those are to be analyzed by the project managers and maintained by the project team
members at this phase.
The primary project management document is created in this phase which is known as
project management plan (Matyas and Pelling 2015). The instances of the project documents are
success factors, scope statement deliverables, schedules, budget estimation details, project
schedule, project time, Human Resource management plan, Quality management plan etc. In
this phase, the project success criteria and assumptions are also considered based on the scope
statement. The Information System implementation project is subdivided in this phase. The
project manager needs to assign distributive job roles for different team members considering
their skills and knowledge in managing projects (Kaiser, El Arbi and Ahlemann 2015). Before,
identification of the target customer project manager should identify the potential risks that may
interrupt the regular success of the project. While planning for the procurement management
plan proper external vendors should be identified and established to control the process.
Project execution phase: The project execution phase deals with bulk of project
activities. In this phase the project manager defines the progress and a project deliverable s
developed and completed stick to a complete mapped out planning. There are many tasks
associated to this phase which captures certain project metrics such as performance measurement
matrix, RACI matrix, .stakeholder matrix, Risk management Matrix etc (Bromiley et al. 2015).
At the end of this phase a performance report is produced by the project manager which defines
the additional project needs accordingly. This is referred to as one of te most crucial phase of
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
7PROJECT MANAGEMENT
project management because in this phase the project manager gets the opportunity to understand
whether the project is going to be commercially successful for the project owners or not.
Project monitoring and control phase: After execution of the project the project manager
requires to monitor the project ad control accordingly. In this phase the actual project plan is
compared to the current status of the project. If differences are identified then those are also
measured in this phase. However, this phase is not next phase of project execution rather this
runs simultaneously with the project execution phase (Elzamly and Hussin 2015). The project
manager requites to perform enough amount of project monitoring as well as control to make
sure that project deliverables are all being produced on estimated time and within the budget
also. This phase takes 40% of the total project lifecycle period. Based on two different project
standpoints such as schedule and budget the project manager needs to calculate the status of the
project. The project monitoring can be done at any time and successful project monitoring
approach provides excellent and advanced project progress.
The different measurable variables that are calculated in this phase include planned value,
earned value, actual cost, cost variance, cost performance index, variance at project completion
etc. While developing and implementing the Information System implementation project for
Woolworths Limited it is determined that, the input ranges of the project are beneficial enough
for the company environment and can deliver positive Return on Investment (ROI) to the
company (Glendon, Clarke and McKenna 2016). The Earned Value Analysis (EVM) is very
much instantaneous and it gives an accurate project status details to the project manager who is
assigned to the IS implementation project in Woolworths Limited. From the analysis results all
needful changes are also identified. It is determined that, the changes are required to be
project management because in this phase the project manager gets the opportunity to understand
whether the project is going to be commercially successful for the project owners or not.
Project monitoring and control phase: After execution of the project the project manager
requires to monitor the project ad control accordingly. In this phase the actual project plan is
compared to the current status of the project. If differences are identified then those are also
measured in this phase. However, this phase is not next phase of project execution rather this
runs simultaneously with the project execution phase (Elzamly and Hussin 2015). The project
manager requites to perform enough amount of project monitoring as well as control to make
sure that project deliverables are all being produced on estimated time and within the budget
also. This phase takes 40% of the total project lifecycle period. Based on two different project
standpoints such as schedule and budget the project manager needs to calculate the status of the
project. The project monitoring can be done at any time and successful project monitoring
approach provides excellent and advanced project progress.
The different measurable variables that are calculated in this phase include planned value,
earned value, actual cost, cost variance, cost performance index, variance at project completion
etc. While developing and implementing the Information System implementation project for
Woolworths Limited it is determined that, the input ranges of the project are beneficial enough
for the company environment and can deliver positive Return on Investment (ROI) to the
company (Glendon, Clarke and McKenna 2016). The Earned Value Analysis (EVM) is very
much instantaneous and it gives an accurate project status details to the project manager who is
assigned to the IS implementation project in Woolworths Limited. From the analysis results all
needful changes are also identified. It is determined that, the changes are required to be
8PROJECT MANAGEMENT
incorporated in this phase as soon as required change requests are enlisted. Apart from this, the
schedule performance index is also calculated in this phase.
Project closure phase: This is the last phase of PMBOK project management prcatices.
However, project closing is referred to as the phase which is mostly ignored by the project
managers during the implementation of any project. For the Information System implementation
project also, this phase was little ignore initially (Cagliano, Grimaldi and Rafele 2015). Whether
the project is accomplished or not is analyzed at this after comparing the final project draft and
the project objectives. Formal closure, Funding, procurement, final details, liabilities, resource
release ad lesson learned are the parts obtained from the project closure phase.
Project tools and techniques
For successfully implementing the Information System project in Woolworths Limited,
different tools and techniques are also should be used by the assigned project manager and team
members. Gantt chart, Critical Path Method, PERT chart and Work Breakdown Structure (WBS)
are the different measuring tools and techniques those are widely applied by the project
managers while implementing this project. In order to breakdown the large IS implementation
project into small segments the project manager requires to use WBS. It helps to segment a large
project in smaller work packages. For each of the segments again different timeframe is allowed
and it becomes the responsibility of the project manager to accomplish the activity within
estimated timeframe only. It also helps the project manager to visualize the issues and its impact
mush easily.
The optimized work path and shows the shortest path to accomplish the project. In other
words, it helps the project manager to visualize the project activities and their respective
incorporated in this phase as soon as required change requests are enlisted. Apart from this, the
schedule performance index is also calculated in this phase.
Project closure phase: This is the last phase of PMBOK project management prcatices.
However, project closing is referred to as the phase which is mostly ignored by the project
managers during the implementation of any project. For the Information System implementation
project also, this phase was little ignore initially (Cagliano, Grimaldi and Rafele 2015). Whether
the project is accomplished or not is analyzed at this after comparing the final project draft and
the project objectives. Formal closure, Funding, procurement, final details, liabilities, resource
release ad lesson learned are the parts obtained from the project closure phase.
Project tools and techniques
For successfully implementing the Information System project in Woolworths Limited,
different tools and techniques are also should be used by the assigned project manager and team
members. Gantt chart, Critical Path Method, PERT chart and Work Breakdown Structure (WBS)
are the different measuring tools and techniques those are widely applied by the project
managers while implementing this project. In order to breakdown the large IS implementation
project into small segments the project manager requires to use WBS. It helps to segment a large
project in smaller work packages. For each of the segments again different timeframe is allowed
and it becomes the responsibility of the project manager to accomplish the activity within
estimated timeframe only. It also helps the project manager to visualize the issues and its impact
mush easily.
The optimized work path and shows the shortest path to accomplish the project. In other
words, it helps the project manager to visualize the project activities and their respective
9PROJECT MANAGEMENT
timeframes. On the Critical Path Method shows how the project can be accomplished by
simultaneous progress of more than one activity (Ariyawardana, Ganegodage and Mortlock
2017). It is not mandatory that always a new task can be initiated with the completion of the
previous phase. The other knowledge areas those are analyzed while implementing this project
include proper communication (open communication), risk management strategies, Stakeholders
matrix, RACI matrix etc. The project team members should interact with each other suing open
communication approach to avoid intra team conflict.
Conclusion
From the entire discussion it is concluded that implementation of Information System
gives tangible benefits to the owners. Information System gives all the users ability to access
needful information whenever required. In order to accomplish any task within estimated time
and budget it is mandatory for both project manager and project team members to provide and
access needful data from the system. The Information System gives high level security to the
users which mean that no unauthorized users will be able to access information from the server
without authentication and permission. Regarding each of the user’s, Information System
provides accurate data those are best suited. It helps to present archived and real time data as per
the requirements. The information can be inserted, deleted and updated accordingly. The
updated information system also helps to provide effective organization level decisions. The
company offers their products and services to New Zealand and Australia and due to the
increasing numbers of consumers the issues that the company was facing regarding their data
management also gets resolved with the implementation of the Information System. As
customers are important assets to any organization therefore satisfaction of the consumers are
timeframes. On the Critical Path Method shows how the project can be accomplished by
simultaneous progress of more than one activity (Ariyawardana, Ganegodage and Mortlock
2017). It is not mandatory that always a new task can be initiated with the completion of the
previous phase. The other knowledge areas those are analyzed while implementing this project
include proper communication (open communication), risk management strategies, Stakeholders
matrix, RACI matrix etc. The project team members should interact with each other suing open
communication approach to avoid intra team conflict.
Conclusion
From the entire discussion it is concluded that implementation of Information System
gives tangible benefits to the owners. Information System gives all the users ability to access
needful information whenever required. In order to accomplish any task within estimated time
and budget it is mandatory for both project manager and project team members to provide and
access needful data from the system. The Information System gives high level security to the
users which mean that no unauthorized users will be able to access information from the server
without authentication and permission. Regarding each of the user’s, Information System
provides accurate data those are best suited. It helps to present archived and real time data as per
the requirements. The information can be inserted, deleted and updated accordingly. The
updated information system also helps to provide effective organization level decisions. The
company offers their products and services to New Zealand and Australia and due to the
increasing numbers of consumers the issues that the company was facing regarding their data
management also gets resolved with the implementation of the Information System. As
customers are important assets to any organization therefore satisfaction of the consumers are
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
10PROJECT MANAGEMENT
very much crucial. The communication level issues and the internal team conflicts also get
resolved with the implementation of Information system in Woolworths Limited.
Recommendations
Development of training and development program: The Human Resource department is
required to develop and design professional training and development program to make ensure
that all the members are aware of the project objectives
Improvement in the security: The Company requires focusing on their security
improvement strategies in terms of developing firewall and encryption technologies.
Selection of appropriate tools and techniques: Before proceeding to project planning
and development phase, the project manager should choose and apply the most suitable tools and
techniques.
very much crucial. The communication level issues and the internal team conflicts also get
resolved with the implementation of Information system in Woolworths Limited.
Recommendations
Development of training and development program: The Human Resource department is
required to develop and design professional training and development program to make ensure
that all the members are aware of the project objectives
Improvement in the security: The Company requires focusing on their security
improvement strategies in terms of developing firewall and encryption technologies.
Selection of appropriate tools and techniques: Before proceeding to project planning
and development phase, the project manager should choose and apply the most suitable tools and
techniques.
11PROJECT MANAGEMENT
References
Ariyawardana, A., Ganegodage, K. and Mortlock, M.Y., 2017. Consumers' trust in vegetable
supply chain members and their behavioural responses: A study based in Queensland,
Australia. Food Control, 73, pp.193-201.
Beare, H., Caldwell, B.J. and Millikan, R.H., 2018. Creating an excellent school: Some new
management techniques. Routledge.
Bromiley, P., McShane, M., Nair, A. and Rustambekov, E., 2015. Enterprise risk management:
Review, critique, and research directions. Long range planning, 48(4), pp.265-276.
Cagliano, A.C., Grimaldi, S. and Rafele, C., 2015. Choosing project risk management
techniques. A theoretical framework. Journal of Risk Research, 18(2), pp.232-248.
Cenci, L., Disperati, L., Persichillo, M.G., Oliveira, E.R., Alves, F.L. and Phillips, M., 2018.
Integrating remote sensing and GIS techniques for monitoring and modeling shoreline evolution
to support coastal risk management. GIScience & Remote Sensing, 55(3), pp.355-375.
Dos Santos, M.A., Svensson, G. and Padin, C., 2013. Indicators of sustainable business
practices: Woolworths in South Africa. Supply Chain Management: An International
Journal, 18(1), pp.104-108.
Elzamly, A. and Hussin, B., 2015. Classification and identification of risk management
techniques for mitigating risks with factor analysis technique in software risk management. Rev.
Comput. Eng. Res, 2(1), pp.22-38.
References
Ariyawardana, A., Ganegodage, K. and Mortlock, M.Y., 2017. Consumers' trust in vegetable
supply chain members and their behavioural responses: A study based in Queensland,
Australia. Food Control, 73, pp.193-201.
Beare, H., Caldwell, B.J. and Millikan, R.H., 2018. Creating an excellent school: Some new
management techniques. Routledge.
Bromiley, P., McShane, M., Nair, A. and Rustambekov, E., 2015. Enterprise risk management:
Review, critique, and research directions. Long range planning, 48(4), pp.265-276.
Cagliano, A.C., Grimaldi, S. and Rafele, C., 2015. Choosing project risk management
techniques. A theoretical framework. Journal of Risk Research, 18(2), pp.232-248.
Cenci, L., Disperati, L., Persichillo, M.G., Oliveira, E.R., Alves, F.L. and Phillips, M., 2018.
Integrating remote sensing and GIS techniques for monitoring and modeling shoreline evolution
to support coastal risk management. GIScience & Remote Sensing, 55(3), pp.355-375.
Dos Santos, M.A., Svensson, G. and Padin, C., 2013. Indicators of sustainable business
practices: Woolworths in South Africa. Supply Chain Management: An International
Journal, 18(1), pp.104-108.
Elzamly, A. and Hussin, B., 2015. Classification and identification of risk management
techniques for mitigating risks with factor analysis technique in software risk management. Rev.
Comput. Eng. Res, 2(1), pp.22-38.
12PROJECT MANAGEMENT
Glendon, A.I., Clarke, S. and McKenna, E., 2016. Human safety and risk management. Crc
Press.
Havranek, T., 2017. Modern project management techniques for the environmental remediation
industry. Routledge.
Hopkin, P., 2017. Fundamentals of risk management: understanding, evaluating and
implementing effective risk management. Kogan Page Publishers.
Kaiser, M.G., El Arbi, F. and Ahlemann, F., 2015. Successful project portfolio management
beyond project selection techniques: Understanding the role of structural
alignment. International Journal of Project Management, 33(1), pp.126-139.
Leveson, N., 2015. A systems approach to risk management through leading safety
indicators. Reliability Engineering & System Safety, 136, pp.17-34.
Marcelino-Sádaba, S., Pérez-Ezcurdia, A., Lazcano, A.M.E. and Villanueva, P., 2014. Project
risk management methodology for small firms. International journal of project
management, 32(2), pp.327-340.
Martinelli, R.J. and Milosevic, D.Z., 2016. Project management toolbox: tools and techniques
for the practicing project manager. John Wiley & Sons.
Matyas, D. and Pelling, M., 2015. Positioning resilience for 2015: the role of resistance,
incremental adjustment and transformation in disaster risk management policy. Disasters, 39(s1),
pp.s1-s18.
McNeil, A.J., Frey, R. and Embrechts, P., 2015. Quantitative Risk Management: Concepts,
Techniques and Tools-revised edition. Princeton university press.
Glendon, A.I., Clarke, S. and McKenna, E., 2016. Human safety and risk management. Crc
Press.
Havranek, T., 2017. Modern project management techniques for the environmental remediation
industry. Routledge.
Hopkin, P., 2017. Fundamentals of risk management: understanding, evaluating and
implementing effective risk management. Kogan Page Publishers.
Kaiser, M.G., El Arbi, F. and Ahlemann, F., 2015. Successful project portfolio management
beyond project selection techniques: Understanding the role of structural
alignment. International Journal of Project Management, 33(1), pp.126-139.
Leveson, N., 2015. A systems approach to risk management through leading safety
indicators. Reliability Engineering & System Safety, 136, pp.17-34.
Marcelino-Sádaba, S., Pérez-Ezcurdia, A., Lazcano, A.M.E. and Villanueva, P., 2014. Project
risk management methodology for small firms. International journal of project
management, 32(2), pp.327-340.
Martinelli, R.J. and Milosevic, D.Z., 2016. Project management toolbox: tools and techniques
for the practicing project manager. John Wiley & Sons.
Matyas, D. and Pelling, M., 2015. Positioning resilience for 2015: the role of resistance,
incremental adjustment and transformation in disaster risk management policy. Disasters, 39(s1),
pp.s1-s18.
McNeil, A.J., Frey, R. and Embrechts, P., 2015. Quantitative Risk Management: Concepts,
Techniques and Tools-revised edition. Princeton university press.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
13PROJECT MANAGEMENT
Modarres, M., 2016. Risk analysis in engineering: techniques, tools, and trends. CRC press.
Neves, S.M., da Silva, C.E.S., Salomon, V.A.P., da Silva, A.F. and Sotomonte, B.E.P., 2014.
Risk management in software projects through knowledge management techniques: cases in
Brazilian incubated technology-based firms. International Journal of Project
Management, 32(1), pp.125-138.
Olson, D.L. and Wu, D.D., 2015. Enterprise risk management(Vol. 3). World Scientific
Publishing Company.
Scott, A.B., Singh, M., Toribio, J.A., Hernandez-Jover, M., Barnes, B., Glass, K., Moloney, B.,
Lee, A. and Groves, P., 2017. Comparisons of management practices and farm design on
Australian commercial layer and meat chicken farms: Cage, barn and free range. PloS
one, 12(11), p.e0188505.
Modarres, M., 2016. Risk analysis in engineering: techniques, tools, and trends. CRC press.
Neves, S.M., da Silva, C.E.S., Salomon, V.A.P., da Silva, A.F. and Sotomonte, B.E.P., 2014.
Risk management in software projects through knowledge management techniques: cases in
Brazilian incubated technology-based firms. International Journal of Project
Management, 32(1), pp.125-138.
Olson, D.L. and Wu, D.D., 2015. Enterprise risk management(Vol. 3). World Scientific
Publishing Company.
Scott, A.B., Singh, M., Toribio, J.A., Hernandez-Jover, M., Barnes, B., Glass, K., Moloney, B.,
Lee, A. and Groves, P., 2017. Comparisons of management practices and farm design on
Australian commercial layer and meat chicken farms: Cage, barn and free range. PloS
one, 12(11), p.e0188505.
14PROJECT MANAGEMENT
Appendix
WBS Task Name Duration Start Finish Predecessors
0 IS project for ABC
software Company 253 days Wed 1/24/18 Fri 1/11/19
1 Project initiation
phase 50 days Wed 1/24/18 Tue 4/3/18
1.1 Development of
project budget 8 days Wed 1/24/18 Fri 2/2/18
1.2 Project time schedule
management 10 days Mon 2/5/18 Fri 2/16/18 2
1.3 Building contract to
project sponsors 10 days Mon 2/19/18 Fri 3/2/18 3,2
1.4 Contact to project
suppliers 9 days Mon 3/5/18 Thu 3/15/18 4
1.5 Developing
communication plan 8 days Fri 3/16/18 Tue 3/27/18 5
1.6 Developing risk
management strategies 5 days Wed 3/28/18 Tue 4/3/18 6
2 Project planning and
designing 62 days Wed 4/4/18 Thu 6/28/18
2.1 Designing project
documentation 11 days Wed 4/4/18 Wed 4/18/18 7
2.2 Developing project
schedule 10 days Thu 4/19/18 Wed 5/2/18 9
2.3 Legal constraints
development 10 days Thu 5/3/18 Wed 5/16/18 10,5
2.4 Project quality and
planning development 10 days Thu 5/17/18 Wed 5/30/18 11
2.5 Developing project
change control log 21 days Thu 5/31/18 Thu 6/28/18 12
3 Project development,
integration and testing 131 days Fri 6/29/18 Fri 12/28/18
3.1
Documentation of
functional and non
functional specification
18 days Fri 6/29/18 Tue 7/24/18 13,2
3.2 Documenting
technical specification 23 days Wed 7/25/18 Fri 8/24/18 15
3.3 Prototype
development 20 days Mon 8/27/18 Fri 9/21/18 16
3.4 Prototype testing 19 days Mon 9/24/18 Thu 10/18/18 17
Appendix
WBS Task Name Duration Start Finish Predecessors
0 IS project for ABC
software Company 253 days Wed 1/24/18 Fri 1/11/19
1 Project initiation
phase 50 days Wed 1/24/18 Tue 4/3/18
1.1 Development of
project budget 8 days Wed 1/24/18 Fri 2/2/18
1.2 Project time schedule
management 10 days Mon 2/5/18 Fri 2/16/18 2
1.3 Building contract to
project sponsors 10 days Mon 2/19/18 Fri 3/2/18 3,2
1.4 Contact to project
suppliers 9 days Mon 3/5/18 Thu 3/15/18 4
1.5 Developing
communication plan 8 days Fri 3/16/18 Tue 3/27/18 5
1.6 Developing risk
management strategies 5 days Wed 3/28/18 Tue 4/3/18 6
2 Project planning and
designing 62 days Wed 4/4/18 Thu 6/28/18
2.1 Designing project
documentation 11 days Wed 4/4/18 Wed 4/18/18 7
2.2 Developing project
schedule 10 days Thu 4/19/18 Wed 5/2/18 9
2.3 Legal constraints
development 10 days Thu 5/3/18 Wed 5/16/18 10,5
2.4 Project quality and
planning development 10 days Thu 5/17/18 Wed 5/30/18 11
2.5 Developing project
change control log 21 days Thu 5/31/18 Thu 6/28/18 12
3 Project development,
integration and testing 131 days Fri 6/29/18 Fri 12/28/18
3.1
Documentation of
functional and non
functional specification
18 days Fri 6/29/18 Tue 7/24/18 13,2
3.2 Documenting
technical specification 23 days Wed 7/25/18 Fri 8/24/18 15
3.3 Prototype
development 20 days Mon 8/27/18 Fri 9/21/18 16
3.4 Prototype testing 19 days Mon 9/24/18 Thu 10/18/18 17
15PROJECT MANAGEMENT
3.5 Project
implementation 8 days Fri 10/19/18 Tue 10/30/18
3.5.1 unit testing 3 days Fri 10/19/18 Tue 10/23/18 18
3.5.2 integrated testing 5 days Wed 10/24/18 Tue 10/30/18 17,20
3.6 Project monitoring 43 days Wed 10/31/18 Fri 12/28/18
3.6.1 Checking project
objectives in details 5 days Wed 10/31/18 Tue 11/6/18 21
3.6.2 developing holidays 5 days Wed 11/7/18 Tue 11/13/18 23
3.6.3 risk assessment 5 days Wed 11/14/18 Tue 11/20/18 24
3.6.4 Final design 5 days Wed 11/21/18 Tue 11/27/18 25
3.6.5 Final Prototype
testing 23 days Wed 11/28/18 Fri 12/28/18 17,26
4 Project closure 10 days Mon 12/31/18 Fri 1/11/19
4.1 Post project review 3 days Mon 12/31/18 Wed 1/2/19 27,18
4.2
Establishing secured
relationship between the
project manager and
project team members
3 days Thu 1/3/19 Mon 1/7/19 29
4.3 Final project
implementation 4 days Tue 1/8/19 Fri 1/11/19 30
3.5 Project
implementation 8 days Fri 10/19/18 Tue 10/30/18
3.5.1 unit testing 3 days Fri 10/19/18 Tue 10/23/18 18
3.5.2 integrated testing 5 days Wed 10/24/18 Tue 10/30/18 17,20
3.6 Project monitoring 43 days Wed 10/31/18 Fri 12/28/18
3.6.1 Checking project
objectives in details 5 days Wed 10/31/18 Tue 11/6/18 21
3.6.2 developing holidays 5 days Wed 11/7/18 Tue 11/13/18 23
3.6.3 risk assessment 5 days Wed 11/14/18 Tue 11/20/18 24
3.6.4 Final design 5 days Wed 11/21/18 Tue 11/27/18 25
3.6.5 Final Prototype
testing 23 days Wed 11/28/18 Fri 12/28/18 17,26
4 Project closure 10 days Mon 12/31/18 Fri 1/11/19
4.1 Post project review 3 days Mon 12/31/18 Wed 1/2/19 27,18
4.2
Establishing secured
relationship between the
project manager and
project team members
3 days Thu 1/3/19 Mon 1/7/19 29
4.3 Final project
implementation 4 days Tue 1/8/19 Fri 1/11/19 30
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
16PROJECT MANAGEMENT
Figure 1: Gantt chart for the project
(Source: Created by author)
Figure 1: Gantt chart for the project
(Source: Created by author)
1 out of 17
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.