Project Management and Information Technology
VerifiedAdded on 2023/01/11
|12
|2457
|76
AI Summary
This report provides insights into project management and information technology. It discusses the project charter, planning methodology, risk register, and more. Learn about the scope, objectives, constraints, and assumptions of the project. Discover the deliverables and budget required. Read now on Desklib.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Project management and information
technology
1
technology
1
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Executive summary
In this report it has been described about a development of IT centre in city of Sydney. Also, the
project charter of this is discussed in which scope, aim and objectives, constraints, assumptions,
etc which can occur within project has been explained. Moreover, waterfall methodology is been
used in this. Along with it, scope statement and risk register of project bas been discussed that
contains certain risks which can occur. At last budget required is described as well.
2
In this report it has been described about a development of IT centre in city of Sydney. Also, the
project charter of this is discussed in which scope, aim and objectives, constraints, assumptions,
etc which can occur within project has been explained. Moreover, waterfall methodology is been
used in this. Along with it, scope statement and risk register of project bas been discussed that
contains certain risks which can occur. At last budget required is described as well.
2
3
Table of Contents
INTRODUCTION...........................................................................................................................3
MAIN BODY...................................................................................................................................3
CONCLUSION ...............................................................................................................................3
REFERENCES................................................................................................................................4
4
INTRODUCTION...........................................................................................................................3
MAIN BODY...................................................................................................................................3
CONCLUSION ...............................................................................................................................3
REFERENCES................................................................................................................................4
4
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
INTRODUCTION
For every project it is required to do proper planning and execution so that it is completed on
time. Basically, there are 4 stages in project execution plan of project that are developing project
charter, WBS, planning and execution. It enables manager to organize activity and task in
effective way. It is important to select methodology so that accordingly task are assigned.
Furthermore, the goals and objectives must be formed as per scope of project. However, on basis
of objectives other things are evaluated (Pimchangthong,. and Boonjing, 2017)
In this report it will be described about project charter of IT project and its various elements such
as scope, assumption, constraints, etc along with it, the planning methodology to be used in
project will be explained. Moreover, risk register and deliverables of IT project will be
mentioned.
Stage 1- Project charter
In present project it is the first stage which is executed. In this main purpose is to form goals and
objectives of project, mention its scope, etc Also, entire description of project is done in it so that
it gives brief description about what project is all about. Moreover, the assumption as well as
constraints are identified which can impact of achieving goals of project. Thus, on basis of it
manager do further planning. Likewise, for IT project its project charter is as below
Identify scope of project
The scope of project refer to planning and determining project goals, deliverables, features,
deadline, etc Moreover, it helps in giving insight about what needs to be done and how to deliver
project. In this it is also identified that how to communicate with stakeholders to determine their
needs. Here, scope of IT centre is stakeholders such as government, IT companies, investor, etc
will be communicated. In in various activities will be performed by manager, member, investor
etc the features of centre is it includes high tech IT tool to provide support services for 5 years.
The budget is $40 million with an additional of $25 million for IT tool. The deliverable is large
advance IT centre equipped with advance tools and equipment. Also, time to complete project is
1 year (Jiang, Klein, and Fernandez, 2018).
Aims and objectives
It is most important element in project charter as it includes forming of goals and objectives. The
entire success or failure of project depends on it. If goals are not formed properly then it can
result in failure of project. Therefore, in IT centre development its objectives are defined below
5
For every project it is required to do proper planning and execution so that it is completed on
time. Basically, there are 4 stages in project execution plan of project that are developing project
charter, WBS, planning and execution. It enables manager to organize activity and task in
effective way. It is important to select methodology so that accordingly task are assigned.
Furthermore, the goals and objectives must be formed as per scope of project. However, on basis
of objectives other things are evaluated (Pimchangthong,. and Boonjing, 2017)
In this report it will be described about project charter of IT project and its various elements such
as scope, assumption, constraints, etc along with it, the planning methodology to be used in
project will be explained. Moreover, risk register and deliverables of IT project will be
mentioned.
Stage 1- Project charter
In present project it is the first stage which is executed. In this main purpose is to form goals and
objectives of project, mention its scope, etc Also, entire description of project is done in it so that
it gives brief description about what project is all about. Moreover, the assumption as well as
constraints are identified which can impact of achieving goals of project. Thus, on basis of it
manager do further planning. Likewise, for IT project its project charter is as below
Identify scope of project
The scope of project refer to planning and determining project goals, deliverables, features,
deadline, etc Moreover, it helps in giving insight about what needs to be done and how to deliver
project. In this it is also identified that how to communicate with stakeholders to determine their
needs. Here, scope of IT centre is stakeholders such as government, IT companies, investor, etc
will be communicated. In in various activities will be performed by manager, member, investor
etc the features of centre is it includes high tech IT tool to provide support services for 5 years.
The budget is $40 million with an additional of $25 million for IT tool. The deliverable is large
advance IT centre equipped with advance tools and equipment. Also, time to complete project is
1 year (Jiang, Klein, and Fernandez, 2018).
Aims and objectives
It is most important element in project charter as it includes forming of goals and objectives. The
entire success or failure of project depends on it. If goals are not formed properly then it can
result in failure of project. Therefore, in IT centre development its objectives are defined below
5
Aim- to build a new information technology centre in London.
Objectives
To construct a high tech information technology centre in Sydney
To complete the project within budget of $40 million
To install latest and high tech IT software and application worth $25 million
Project description
Here, entire description of project is defined that makes it easy for manager to do planning. It
describe what project is all about, why it has been undertaken, who are the stakeholders involved
in it and many other things (Whyte, Stasis, and Lindkvist, 2016). In this each and every detail is
described in brief. Similarly, a project is undertaken to develop and construct a new IT centre in
Sydney. It has to be constructed on land that is owned by client. The total budget including value
of land is $40 million. Along with it, in project the latest and high tech IT software and
application will be installed. For that, client is having budget of $25 million. So, IT centre will be
completing advance infrastructure. Thus, the main purpose of developing centre is to provide
support to IT services with help of more advanced tools and equipment. Besides that, the centre
is developed to fulfill IT need for next 5 years.
Project objectives
To construct a high tech information technology centre in Sydney
To complete the project within budget of $40 million
To install latest and high tech IT software and application worth $25 million
Requirements
In order to construct and develop a new and advanced IT centre in Sydney there are many
requirements which is needed for this. First of all, a land is required on which the centre is to be
constructed. Then, it requires raw material for construction such as cement, bricks, etc The
machine and trucks are required for bringing raw materials to site. Furthermore, another essential
requirement is labor who will perform activities of construction (Kasemsap, 2018)
Constraints
For every project there are certain constraints which are barrier or restrictions. It can highly
impact on project completion or its quality. Thus, it is necessary of manager to identify those
constraints so that its impact can be minimize. Usually, time, cost and scope are 3 basic
constraints in it. Likewise, in IT centre project these all are constraints. Here, project has to be
6
Objectives
To construct a high tech information technology centre in Sydney
To complete the project within budget of $40 million
To install latest and high tech IT software and application worth $25 million
Project description
Here, entire description of project is defined that makes it easy for manager to do planning. It
describe what project is all about, why it has been undertaken, who are the stakeholders involved
in it and many other things (Whyte, Stasis, and Lindkvist, 2016). In this each and every detail is
described in brief. Similarly, a project is undertaken to develop and construct a new IT centre in
Sydney. It has to be constructed on land that is owned by client. The total budget including value
of land is $40 million. Along with it, in project the latest and high tech IT software and
application will be installed. For that, client is having budget of $25 million. So, IT centre will be
completing advance infrastructure. Thus, the main purpose of developing centre is to provide
support to IT services with help of more advanced tools and equipment. Besides that, the centre
is developed to fulfill IT need for next 5 years.
Project objectives
To construct a high tech information technology centre in Sydney
To complete the project within budget of $40 million
To install latest and high tech IT software and application worth $25 million
Requirements
In order to construct and develop a new and advanced IT centre in Sydney there are many
requirements which is needed for this. First of all, a land is required on which the centre is to be
constructed. Then, it requires raw material for construction such as cement, bricks, etc The
machine and trucks are required for bringing raw materials to site. Furthermore, another essential
requirement is labor who will perform activities of construction (Kasemsap, 2018)
Constraints
For every project there are certain constraints which are barrier or restrictions. It can highly
impact on project completion or its quality. Thus, it is necessary of manager to identify those
constraints so that its impact can be minimize. Usually, time, cost and scope are 3 basic
constraints in it. Likewise, in IT centre project these all are constraints. Here, project has to be
6
completed within allocated budget of $40 million otherwise any rise in cost will affect on its
completion. In addition to it, IT centre should be constructed within specified deadline. Any
delay in its completion will led to rise in budget. Also, scope is constraint in it. The quality of IT
centre and tools and equipment installed in it should not be affected. They must be high tech and
advance (Eftekhari,. and Valmohammadi, 2017).
Assumption
In project management, assumption are anticipated event which can occur during project. If
occurred it can highly impact of project. Generally, they are used by manager in preparing risk
management. In similar way, in development of IT centre there are several assumption which can
occur. They are as follows
The labor will be easily available during summer season.
The raw material are not delivered on time and its quality is poor as well.
For installation of IT tool and equipment within centre they do not possess high and advance
skills and knowledge.
The resources required in it are not available on time.
Construction of IT centre is completed within budget allocation.
Team members of undertaking this project possess required skills.
There is strong relations with all stakeholders and their needs are identified properly.
Planning methodology
It is necessary to select specific methodology in project. It enables in systematic completion of
project. The methodology is framework of process or practice of tasks. There are various
methods available but its selection depends on project nature and type. So, they are mentioned as
Waterfall- this method will be used in current project as it will help in proper planning in this
project will be broken down into small stages. Thus, each stage must be completed before
proceeding to next one. It will prevent in over lapping of stage. Besides, there are many steps in
it that is requirement analysis, design, implementation etc this method can be used in installing
of IT devices within centre as well (Marchewka, 2016)
Scope statement
Project scope
The stakeholders that will be communicated to identify need of project are government,
IT companies, investor, etc the features of centre is it includes high tech IT tool to provide
7
completion. In addition to it, IT centre should be constructed within specified deadline. Any
delay in its completion will led to rise in budget. Also, scope is constraint in it. The quality of IT
centre and tools and equipment installed in it should not be affected. They must be high tech and
advance (Eftekhari,. and Valmohammadi, 2017).
Assumption
In project management, assumption are anticipated event which can occur during project. If
occurred it can highly impact of project. Generally, they are used by manager in preparing risk
management. In similar way, in development of IT centre there are several assumption which can
occur. They are as follows
The labor will be easily available during summer season.
The raw material are not delivered on time and its quality is poor as well.
For installation of IT tool and equipment within centre they do not possess high and advance
skills and knowledge.
The resources required in it are not available on time.
Construction of IT centre is completed within budget allocation.
Team members of undertaking this project possess required skills.
There is strong relations with all stakeholders and their needs are identified properly.
Planning methodology
It is necessary to select specific methodology in project. It enables in systematic completion of
project. The methodology is framework of process or practice of tasks. There are various
methods available but its selection depends on project nature and type. So, they are mentioned as
Waterfall- this method will be used in current project as it will help in proper planning in this
project will be broken down into small stages. Thus, each stage must be completed before
proceeding to next one. It will prevent in over lapping of stage. Besides, there are many steps in
it that is requirement analysis, design, implementation etc this method can be used in installing
of IT devices within centre as well (Marchewka, 2016)
Scope statement
Project scope
The stakeholders that will be communicated to identify need of project are government,
IT companies, investor, etc the features of centre is it includes high tech IT tool to provide
7
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
support services for 5 years. The budget is $40 million with an additional of $25 million
for IT tool. The deliverable is large advance IT centre equipped with advance tools and
equipment. Also, time to complete project is 1 year.
Project deliverables
A complete new IT centre in Sydney
The centre consists of highly advanced and high tech IT tool and equipment
New IT technology for giving support and fulfill need of IT services.
Justification of project
This project is taken as it will help in providing better and effective support to IT services
in Sydney. Also, by completing it in effective time a new benchmark can be set.
Moreover, in future there is a lot of growth in IT sector. Thus, more project can be
undertaken. It will help in earning huge revenue from it (Varajão, Magalhães, and
Ramos,., 2018).
Constraints
Here, project has to be completed within allocated budget of $40 million otherwise any
rise in cost will affect on its completion. In addition to it, IT centre should be constructed
within specified deadline. Any delay in its completion will led to rise in budget. Also,
scope is constraint in it. The quality of IT centre and tools and equipment installed in it
should not be affected. They must be high tech and advance.
Assumption
The raw material are not delivered on time and its quality is poor as well.
For installation of IT tool and equipment within centre they do not possess high and
advance skills and knowledge.
The resources required in it are not available on time.
Construction of IT centre is completed within budget allocation.
8
for IT tool. The deliverable is large advance IT centre equipped with advance tools and
equipment. Also, time to complete project is 1 year.
Project deliverables
A complete new IT centre in Sydney
The centre consists of highly advanced and high tech IT tool and equipment
New IT technology for giving support and fulfill need of IT services.
Justification of project
This project is taken as it will help in providing better and effective support to IT services
in Sydney. Also, by completing it in effective time a new benchmark can be set.
Moreover, in future there is a lot of growth in IT sector. Thus, more project can be
undertaken. It will help in earning huge revenue from it (Varajão, Magalhães, and
Ramos,., 2018).
Constraints
Here, project has to be completed within allocated budget of $40 million otherwise any
rise in cost will affect on its completion. In addition to it, IT centre should be constructed
within specified deadline. Any delay in its completion will led to rise in budget. Also,
scope is constraint in it. The quality of IT centre and tools and equipment installed in it
should not be affected. They must be high tech and advance.
Assumption
The raw material are not delivered on time and its quality is poor as well.
For installation of IT tool and equipment within centre they do not possess high and
advance skills and knowledge.
The resources required in it are not available on time.
Construction of IT centre is completed within budget allocation.
8
Risk register
In a project there may occur various types of risk which can highly impact on its completion. The
type of risk depends in project nature and its type. So, it is necessary for project manager to
identify those risk and take appropriate measures to mitigate its impact. Thus, risk register is tool
to determine risk in project. It consists of level of risk, mitigation measure, etc. With the help of
risk register it becomes easy for project manager to identify types and level of risk and
accordingly take measures in it. So, in development of IT Centre the risk register is as
(Kasemsap,., 2018).
Risk Likelihood Impact Mitigation
measures
Risk factor
1= low
5 = high
Rise in cost 3 4 Here, it a back up
or additional cost
will be estimated.
4
Insufficient
resources
3 4 Here, resources
will be allocated
as per need of
tasks and its
monitoring will
be done.
4
Delay in project
completion
4 5 A schedule will
be prepared and
prioritize
3
9
In a project there may occur various types of risk which can highly impact on its completion. The
type of risk depends in project nature and its type. So, it is necessary for project manager to
identify those risk and take appropriate measures to mitigate its impact. Thus, risk register is tool
to determine risk in project. It consists of level of risk, mitigation measure, etc. With the help of
risk register it becomes easy for project manager to identify types and level of risk and
accordingly take measures in it. So, in development of IT Centre the risk register is as
(Kasemsap,., 2018).
Risk Likelihood Impact Mitigation
measures
Risk factor
1= low
5 = high
Rise in cost 3 4 Here, it a back up
or additional cost
will be estimated.
4
Insufficient
resources
3 4 Here, resources
will be allocated
as per need of
tasks and its
monitoring will
be done.
4
Delay in project
completion
4 5 A schedule will
be prepared and
prioritize
3
9
activities will be
mentioned .
Lack of labor 3 4 In this immediate
hiring will be
done
3
Poor quality of
raw material of
3 4 There will be
standard set for
measuring quality
of raw material
and it will be
ensured that its
quality is checked
3
Delay in supply
of raw material
4 5 From new
supplier raw
material will be
purchased
2
Deliverables
In this it refers to tangible or intangible goods or services which is result of project and delivered
to customers. Therefore, in current project the deliverables will be
A complete new IT centre in Sydney
The centre consists of highly advanced and high tech IT tool and equipment
New IT technology for giving support and fulfill need of IT services.
Summary of milestone and standards
Here, milestone of project is
Milestone Start date End date
Planning of project 1-5-2020 10-5-2020
Construction phase 2 7-6-2020 20-6-2020
10
mentioned .
Lack of labor 3 4 In this immediate
hiring will be
done
3
Poor quality of
raw material of
3 4 There will be
standard set for
measuring quality
of raw material
and it will be
ensured that its
quality is checked
3
Delay in supply
of raw material
4 5 From new
supplier raw
material will be
purchased
2
Deliverables
In this it refers to tangible or intangible goods or services which is result of project and delivered
to customers. Therefore, in current project the deliverables will be
A complete new IT centre in Sydney
The centre consists of highly advanced and high tech IT tool and equipment
New IT technology for giving support and fulfill need of IT services.
Summary of milestone and standards
Here, milestone of project is
Milestone Start date End date
Planning of project 1-5-2020 10-5-2020
Construction phase 2 7-6-2020 20-6-2020
10
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Flooring 17-7-2020 27-7-2020
Summary of budget
Activity
Planned
(%) Actual (%) Planned Cost (£) Actual Cost (£)
Variation
(£)
1 1 1 0.29 0.29 0.29
2 1 1 2.91 2.91 2.91
3 1 1 1.72 1.72 1.72
4 1 1 1.53 1.53 1.53
5 1 0.8 4.08 0.38 4.08
6 1 1 5.97 5.97 5.97
7 1 0.35 1.32 0.46 1.32
8 1 0.35 2.76 0.96 2.76
9 1 0.5 2.75 1.375 2.75
Total 23.33
From above it can be analyzed that budget required for IT centre is average 24.
11
Summary of budget
Activity
Planned
(%) Actual (%) Planned Cost (£) Actual Cost (£)
Variation
(£)
1 1 1 0.29 0.29 0.29
2 1 1 2.91 2.91 2.91
3 1 1 1.72 1.72 1.72
4 1 1 1.53 1.53 1.53
5 1 0.8 4.08 0.38 4.08
6 1 1 5.97 5.97 5.97
7 1 0.35 1.32 0.46 1.32
8 1 0.35 2.76 0.96 2.76
9 1 0.5 2.75 1.375 2.75
Total 23.33
From above it can be analyzed that budget required for IT centre is average 24.
11
REFERENCES
Books and journals
Marchewka, J.T., 2016. Information technology project management: Providing measurable
organizational value. John Wiley & Sons.
Varajão, J., Magalhães, L. and Ramos, J., 2018. Implementing Success Management in an IT
project. Procedia computer science, 138, pp.891-898.
Eftekhari, H. and Valmohammadi, C., 2017. Application of IT in project management using
structural equation modelling. International Journal of Business Information
Systems, 24(4), pp.529-545.
Kasemsap, K., 2018. The roles of information technology and knowledge management in project
management metrics. In Global Business Expansion: Concepts, Methodologies, Tools, and
Applications (pp. 1191-1221). IGI Global.
Whyte, J., Stasis, A. and Lindkvist, C., 2016. Managing change in the delivery of complex
projects: Configuration management, asset information and ‘big data’. International
Journal of Project Management, 34(2), pp.339-351.
Jiang, J.J., Klein, G. and Fernandez, W.D., 2018. From project management to program
management: an invitation to investigate programs where IT plays a significant
role. Journal of the Association for Information Systems, 19(1), p.1.
Pimchangthong, D. and Boonjing, V., 2017. Effects of risk management practice on the success
of IT project. Procedia Engineering, 182, pp.579-586.
12
Books and journals
Marchewka, J.T., 2016. Information technology project management: Providing measurable
organizational value. John Wiley & Sons.
Varajão, J., Magalhães, L. and Ramos, J., 2018. Implementing Success Management in an IT
project. Procedia computer science, 138, pp.891-898.
Eftekhari, H. and Valmohammadi, C., 2017. Application of IT in project management using
structural equation modelling. International Journal of Business Information
Systems, 24(4), pp.529-545.
Kasemsap, K., 2018. The roles of information technology and knowledge management in project
management metrics. In Global Business Expansion: Concepts, Methodologies, Tools, and
Applications (pp. 1191-1221). IGI Global.
Whyte, J., Stasis, A. and Lindkvist, C., 2016. Managing change in the delivery of complex
projects: Configuration management, asset information and ‘big data’. International
Journal of Project Management, 34(2), pp.339-351.
Jiang, J.J., Klein, G. and Fernandez, W.D., 2018. From project management to program
management: an invitation to investigate programs where IT plays a significant
role. Journal of the Association for Information Systems, 19(1), p.1.
Pimchangthong, D. and Boonjing, V., 2017. Effects of risk management practice on the success
of IT project. Procedia Engineering, 182, pp.579-586.
12
1 out of 12
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.