Project Management Critical Path Analysis
VerifiedAdded on  2021/04/21
|15
|2485
|277
AI Summary
The provided case study is a project management scenario that involves the construction of a gas storage tank. The scenario includes various tasks, such as repairing risk completion, analysis of completed work, and closure of issues, which are assigned to different personnel members including a contractor, supervisor, site planner, and project manager. The critical path method is used to identify the minimum duration required for the project's completion, with a total duration of 24 days. The assignment requires the application of critical path analysis to determine the minimum duration required for the project's completion.