This assignment presents a comprehensive project management plan outlining the project's objectives, resources, timelines, risks, and mitigation strategies. It details roles of various team members like Project Manager, IT Manager, Financial Analyst, etc., with their allocated units and hourly rates. The plan includes a risk assessment with potential threats, their levels, and proposed management strategies. Additionally, it highlights key monitoring and control aspects to ensure project success within scope, time, and budget constraints.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Project Management Plan WIZTrain
Project Name Network design and implementation for expansion of Wiz
Train’s training facility
Date Prepared 17/10/2017
Document Version 1.0
Prepared By Anil Bhattarai
Contact Information contact@anilbhattarai.com.np
Project Start Date Tue 10-10-17 Project Finish Date Fri 05-01-18
Project Manager John Orchard
Contact Information johnorch@indigoineer.com
Project Management Plan Version: 1.0 Page 1 of 10
Project Name Network design and implementation for expansion of Wiz
Train’s training facility
Date Prepared 17/10/2017
Document Version 1.0
Prepared By Anil Bhattarai
Contact Information contact@anilbhattarai.com.np
Project Start Date Tue 10-10-17 Project Finish Date Fri 05-01-18
Project Manager John Orchard
Contact Information johnorch@indigoineer.com
Project Management Plan Version: 1.0 Page 1 of 10
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Project Management Plan WIZTrain
Contents
Project Objectives......................................................................................................................3
Background and Strategic Context.............................................................................................3
Project Scope..............................................................................................................................4
In-Scope.................................................................................................................................4
Out-of-Scope..........................................................................................................................4
Assumptions...........................................................................................................................4
Constraints..............................................................................................................................4
Project Deliverables...................................................................................................................5
Project Governance....................................................................................................................5
Task Management......................................................................................................................6
Project Schedule.........................................................................................................................7
Project Resources and Costs......................................................................................................9
Project Risk Assessment............................................................................................................9
Project Monitoring and Control...............................................................................................10
Project Plan Approval..............................................................................................................10
Project Management Plan Version: 1.0 Page 2 of 10
Contents
Project Objectives......................................................................................................................3
Background and Strategic Context.............................................................................................3
Project Scope..............................................................................................................................4
In-Scope.................................................................................................................................4
Out-of-Scope..........................................................................................................................4
Assumptions...........................................................................................................................4
Constraints..............................................................................................................................4
Project Deliverables...................................................................................................................5
Project Governance....................................................................................................................5
Task Management......................................................................................................................6
Project Schedule.........................................................................................................................7
Project Resources and Costs......................................................................................................9
Project Risk Assessment............................................................................................................9
Project Monitoring and Control...............................................................................................10
Project Plan Approval..............................................................................................................10
Project Management Plan Version: 1.0 Page 2 of 10
Project Management Plan WIZTrain
Project Objectives
The purpose of this project is to design and implement network for expanding the existing
training facility of Wiz Train. The network will be designed to accommodate additional two
training rooms and one separate staff room for trainers. This project is focused on network
design and implementing it for the expansion of Wiz Train’s training facility. The
objectives being developed for the project are listed as below:
To expand the existing training facility of Wiz Train with two additional training
rooms and one separate staff room for trainers.
To design the network for expansion of the training facility.
To integrate a new IP phone with the existing IP phone network.
Background and Strategic Context
Wiz Train was founded in 2014 with a motive to provide computer training to the corporate
clients. The organization delivers technical training to the corporate clients related to
computer knowledge so that they can excel in their professional field. The company
presently has a small training facility in the city of Perth that has two training rooms,
reception area, one meeting room, one staff room and one executive office. Wiz Train is
growing with expansion in the number of clients and hence there is a need to develop their
operations by expanding the existing training facility. The organization has decided to
expand the facility by addition of two training rooms and one separate staff room for
trainers. This report focuses on the business case of expanding the existing facility so as to
ensure profitability and smooth running of the business processes within the organization.
This project relates to expansion of the existing training facility of Wiz Train so as to meet
the increase in number of clients. The aim of this project is to design a network based on the
existing network infrastructure so that the two additional training rooms and one room for
staffs can be accommodated within the existing facility. The hardware specifications and
operating system that are used on the server are listed as below:
Hardware:
CPU: Intel Core i7 Quad Core 2.0 GHz Processor
RAM: 16 GB.
2x 2 TB Hard Disk
256 GB SSDs
DVD ROM Drive
Super VGA (1024 x 768) or higher-resolution monitor
Gigabit Ethernet adapter
Operating System: Windows Server 2012
Project Management Plan Version: 1.0 Page 3 of 10
Project Objectives
The purpose of this project is to design and implement network for expanding the existing
training facility of Wiz Train. The network will be designed to accommodate additional two
training rooms and one separate staff room for trainers. This project is focused on network
design and implementing it for the expansion of Wiz Train’s training facility. The
objectives being developed for the project are listed as below:
To expand the existing training facility of Wiz Train with two additional training
rooms and one separate staff room for trainers.
To design the network for expansion of the training facility.
To integrate a new IP phone with the existing IP phone network.
Background and Strategic Context
Wiz Train was founded in 2014 with a motive to provide computer training to the corporate
clients. The organization delivers technical training to the corporate clients related to
computer knowledge so that they can excel in their professional field. The company
presently has a small training facility in the city of Perth that has two training rooms,
reception area, one meeting room, one staff room and one executive office. Wiz Train is
growing with expansion in the number of clients and hence there is a need to develop their
operations by expanding the existing training facility. The organization has decided to
expand the facility by addition of two training rooms and one separate staff room for
trainers. This report focuses on the business case of expanding the existing facility so as to
ensure profitability and smooth running of the business processes within the organization.
This project relates to expansion of the existing training facility of Wiz Train so as to meet
the increase in number of clients. The aim of this project is to design a network based on the
existing network infrastructure so that the two additional training rooms and one room for
staffs can be accommodated within the existing facility. The hardware specifications and
operating system that are used on the server are listed as below:
Hardware:
CPU: Intel Core i7 Quad Core 2.0 GHz Processor
RAM: 16 GB.
2x 2 TB Hard Disk
256 GB SSDs
DVD ROM Drive
Super VGA (1024 x 768) or higher-resolution monitor
Gigabit Ethernet adapter
Operating System: Windows Server 2012
Project Management Plan Version: 1.0 Page 3 of 10
Project Management Plan WIZTrain
The devices and equipment that are used in the existing network infrastructure are listed as
below:
6x Cisco Catalyst 2960 switch (or Cisco Catalyst 2960)
1x Cisco 2811 router
3x Linksys WRT300N Wireless Routers
2x 7960 IP Phones
Project Scope
In-Scope:
Design of network for expanding the
training facility.
Implementation of designed network.
Connectivity between the existing
and expanded facilities.
Accessibility of network for the two
additional training rooms and
separate staff room.
Out-of-Scope:
Uninterrupted power supply.
Access of network by guests.
Managed services
Selection of carrier
Assumptions:
24x7 availability of power supply.
Network is designed according to
requirements
Adequate availability of resources.
Risks have been properly identified
and evaluated.
Constraints:
Network design should fit with the
budget of client.
Proper allocation of staffs.
Scheduling of project with
completion of the determining the
requirements
Project Management Plan Version: 1.0 Page 4 of 10
The devices and equipment that are used in the existing network infrastructure are listed as
below:
6x Cisco Catalyst 2960 switch (or Cisco Catalyst 2960)
1x Cisco 2811 router
3x Linksys WRT300N Wireless Routers
2x 7960 IP Phones
Project Scope
In-Scope:
Design of network for expanding the
training facility.
Implementation of designed network.
Connectivity between the existing
and expanded facilities.
Accessibility of network for the two
additional training rooms and
separate staff room.
Out-of-Scope:
Uninterrupted power supply.
Access of network by guests.
Managed services
Selection of carrier
Assumptions:
24x7 availability of power supply.
Network is designed according to
requirements
Adequate availability of resources.
Risks have been properly identified
and evaluated.
Constraints:
Network design should fit with the
budget of client.
Proper allocation of staffs.
Scheduling of project with
completion of the determining the
requirements
Project Management Plan Version: 1.0 Page 4 of 10
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Project Management Plan WIZTrain
Project Deliverables
Standard questionnaire for interview.
Summary of business requirements.
Summary of the existing network.
Logical design for the network.
Implementation of designed computer network.
Project Governance
1. Stakeholder Management
Name Position Organizatio
n
Address Inter-
relationships
Roles
John
Orchard
Project
Manager
NSW Proj
Mgmt
55 Gregory Way
SILVER SANDS
WA 6210
Directly
related to
CEO.
Management,
planning and
controlling of
project
Tim
Smith
IT Manager Wiz Train 50 Creek Street
COOYAR QLD
4402
Directly
related to
CEO.
Managing the
technical
aspects
Anil
Bhattara
i
IT
Consultant
Wiz Train 84 Faunce Crescent
WARGAMBEGAL
NSW 2672
Appointed by
IT Manager
Determining
the technical
requirements
David
Halley
Financial
Analyst
Wiz Train 57 Seiferts Rd
TANBY QLD 4703
Directly
related to
CEO.
Managing and
controlling
financial
aspects
Matt
Hardy
Procurement
Manager
Wiz Train 20 Blyth Street
WULAGI NT 0812
Directly
related to
CEO.
Procuring the
equipment and
software.
Sandy
Richard
Chief
Executive
Officer
Wiz Train 68 Bayview Close
GLENLEE QLD
4711
Under the
guidance of
Director
Managing
operations and
business
processes.
2. Project Organisational chart
Project Management Plan Version: 1.0 Page 5 of 10
Project Deliverables
Standard questionnaire for interview.
Summary of business requirements.
Summary of the existing network.
Logical design for the network.
Implementation of designed computer network.
Project Governance
1. Stakeholder Management
Name Position Organizatio
n
Address Inter-
relationships
Roles
John
Orchard
Project
Manager
NSW Proj
Mgmt
55 Gregory Way
SILVER SANDS
WA 6210
Directly
related to
CEO.
Management,
planning and
controlling of
project
Tim
Smith
IT Manager Wiz Train 50 Creek Street
COOYAR QLD
4402
Directly
related to
CEO.
Managing the
technical
aspects
Anil
Bhattara
i
IT
Consultant
Wiz Train 84 Faunce Crescent
WARGAMBEGAL
NSW 2672
Appointed by
IT Manager
Determining
the technical
requirements
David
Halley
Financial
Analyst
Wiz Train 57 Seiferts Rd
TANBY QLD 4703
Directly
related to
CEO.
Managing and
controlling
financial
aspects
Matt
Hardy
Procurement
Manager
Wiz Train 20 Blyth Street
WULAGI NT 0812
Directly
related to
CEO.
Procuring the
equipment and
software.
Sandy
Richard
Chief
Executive
Officer
Wiz Train 68 Bayview Close
GLENLEE QLD
4711
Under the
guidance of
Director
Managing
operations and
business
processes.
2. Project Organisational chart
Project Management Plan Version: 1.0 Page 5 of 10
Project Management Plan WIZTrain
Task Management
i. Work Breakdown Structure (WBS)
ii. WBS Dictionary
WBS Task Name Description
0 Wiz Train training facility network design This represents the title for this project.
1 Startup of project This task reflects the initiation of project.
2 Developing change plan schedule It represents the plan schedule that have to
be developed.
3 Procurement of new equipment This task is the purchasing of required
materials for the network design.
Project Management Plan Version: 1.0 Page 6 of 10
Project Client Project Sponsor
Manager of the
Project Manager
Project Manager
Project Team
Members
Task Management
i. Work Breakdown Structure (WBS)
ii. WBS Dictionary
WBS Task Name Description
0 Wiz Train training facility network design This represents the title for this project.
1 Startup of project This task reflects the initiation of project.
2 Developing change plan schedule It represents the plan schedule that have to
be developed.
3 Procurement of new equipment This task is the purchasing of required
materials for the network design.
Project Management Plan Version: 1.0 Page 6 of 10
Project Client Project Sponsor
Manager of the
Project Manager
Project Manager
Project Team
Members
Project Management Plan WIZTrain
4 Backup of current data In this task, the backup of data have to be
taken.
5 Installation and Configuration This activity refers to installing and
configuring the network equipment’s.
6 Training In this activity, the training will be
provided to staffs of the organization.
Project Schedule
Milestones in the project:
Milestones Start Date Finish Date
M1. Completion of
initiation phase
Tue 10-10-17 Wed 18-10-17
M2. Completion of changes
in plan schedule
Thu 19-10-17 Thu 26-10-17
M3. Completion of
procurement of materials
Fri 27-10-17 Fri 10-11-17
M4. Backup of current data Mon 13-11-17 Tue 21-11-17
M5. Completion of
installation and
configuration
Wed 22-11-17 Wed 27-12-17
M6. Completion of training Thu 28-12-17 Fri 05-01-18
Timeline for the project:
Project Management Plan Version: 1.0 Page 7 of 10
4 Backup of current data In this task, the backup of data have to be
taken.
5 Installation and Configuration This activity refers to installing and
configuring the network equipment’s.
6 Training In this activity, the training will be
provided to staffs of the organization.
Project Schedule
Milestones in the project:
Milestones Start Date Finish Date
M1. Completion of
initiation phase
Tue 10-10-17 Wed 18-10-17
M2. Completion of changes
in plan schedule
Thu 19-10-17 Thu 26-10-17
M3. Completion of
procurement of materials
Fri 27-10-17 Fri 10-11-17
M4. Backup of current data Mon 13-11-17 Tue 21-11-17
M5. Completion of
installation and
configuration
Wed 22-11-17 Wed 27-12-17
M6. Completion of training Thu 28-12-17 Fri 05-01-18
Timeline for the project:
Project Management Plan Version: 1.0 Page 7 of 10
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Project Management Plan WIZTrain
Project Management Plan Version: 1.0 Page 8 of 10
Project Management Plan Version: 1.0 Page 8 of 10
Project Management Plan WIZTrain
Project Resources and Costs
Required resources for the project:
Human Resources Materials
Project Manager
IT Manager
IT Consultant
Financial Analyst
Procurement Manager
Technical Writer
Cabling Technician
20x Computers for trainees
02x Computers for trainers
02x Cisco 2811 router
02x Cisco Catalyst 2960 switch
01x 7960 IP Phone
Software license
Cables
Costs for each resource:
Resource Name Type Initials Max. Units Std. Rate
Project Manager Work P 100% $15.00/hr
IT Manager Work I 100% $22.00/hr
IT Consultant Work I 100% $15.00/hr
Financial Analyst Work F 100% $20.00/hr
Procurement Manager Work P 100% $15.00/hr
Technical Writer Work T 100% $10.00/hr
Cabling Technician Work C 100% $10.00/hr
Hardware equipment Material H $43,000.00
Software and Software
license Material S $10,000.00
Cables Material C $500.00
Project Risk Assessment
Risk Level of Risk Risk Management Strategy
Lack of resources Medium Additional resources shall be ready for
allocation into activity.
Lack of technical expertise High Proper evaluation on the technical skills
and abilities of the professional have to
be done.
Possible conflict between
team members
Medium Team meetings will be held at regular
intervals to determine if there is any
possible conflict then it will be resolved
immediately.
Improper determination of
budget
High The budget for the project have to be
assessed at a regular time interval along
with progress.
Project Management Plan Version: 1.0 Page 9 of 10
Project Resources and Costs
Required resources for the project:
Human Resources Materials
Project Manager
IT Manager
IT Consultant
Financial Analyst
Procurement Manager
Technical Writer
Cabling Technician
20x Computers for trainees
02x Computers for trainers
02x Cisco 2811 router
02x Cisco Catalyst 2960 switch
01x 7960 IP Phone
Software license
Cables
Costs for each resource:
Resource Name Type Initials Max. Units Std. Rate
Project Manager Work P 100% $15.00/hr
IT Manager Work I 100% $22.00/hr
IT Consultant Work I 100% $15.00/hr
Financial Analyst Work F 100% $20.00/hr
Procurement Manager Work P 100% $15.00/hr
Technical Writer Work T 100% $10.00/hr
Cabling Technician Work C 100% $10.00/hr
Hardware equipment Material H $43,000.00
Software and Software
license Material S $10,000.00
Cables Material C $500.00
Project Risk Assessment
Risk Level of Risk Risk Management Strategy
Lack of resources Medium Additional resources shall be ready for
allocation into activity.
Lack of technical expertise High Proper evaluation on the technical skills
and abilities of the professional have to
be done.
Possible conflict between
team members
Medium Team meetings will be held at regular
intervals to determine if there is any
possible conflict then it will be resolved
immediately.
Improper determination of
budget
High The budget for the project have to be
assessed at a regular time interval along
with progress.
Project Management Plan Version: 1.0 Page 9 of 10
Project Management Plan WIZTrain
Project Monitoring and Control
The project manager in context to this particular project must be aware of the fact that
scope, time and cost are fully inter-related. The project constraints will be monitored and
controlled as below:
The project manager will convey the information on progress of project and any
other related issues to the project stakeholders to minimize the impact on project.
The project manager will be also responsible for approval of the requested changes
in the project.
The requested changes should be approved prior to implementation in the project.
The fluctuations in the key attributes such as scope, time and cost have to be
monitored regularly so that there is likelihood of project success.
Project Plan Approval
Full Name Position Title Signature
John Orchard Project Manager John Orchard
Tim Smith IT Manager Tim Smith
Anil Bhattarai IT Consultant Anil Bhattarai
David Halley Financial Analyst David Halley
Project Management Plan Version: 1.0 Page 10 of 10
Project Monitoring and Control
The project manager in context to this particular project must be aware of the fact that
scope, time and cost are fully inter-related. The project constraints will be monitored and
controlled as below:
The project manager will convey the information on progress of project and any
other related issues to the project stakeholders to minimize the impact on project.
The project manager will be also responsible for approval of the requested changes
in the project.
The requested changes should be approved prior to implementation in the project.
The fluctuations in the key attributes such as scope, time and cost have to be
monitored regularly so that there is likelihood of project success.
Project Plan Approval
Full Name Position Title Signature
John Orchard Project Manager John Orchard
Tim Smith IT Manager Tim Smith
Anil Bhattarai IT Consultant Anil Bhattarai
David Halley Financial Analyst David Halley
Project Management Plan Version: 1.0 Page 10 of 10
1 out of 10
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.