Running head: CRITIQUE OF PROJECT MANAGEMENT PLANNING TOOLS Critique of project management planning tools Name of the student Name of the university Author Note:
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
2 CRITIQUE OF PROJECT MANAGEMENT PLANNING TOOLS Table of Contents Introduction......................................................................................................................................3 Project Management Planning Tools...............................................................................................3 Figure 1: Work Breakdown Structure..........................................................................................4 Figure 2: Gantt chart....................................................................................................................5 Analysis and Critique......................................................................................................................6 Strengths......................................................................................................................................7 Limitations...................................................................................................................................8 Comparison of the Two Tools.........................................................................................................9 Conclusion.......................................................................................................................................9 References......................................................................................................................................11
3 CRITIQUE OF PROJECT MANAGEMENT PLANNING TOOLS Introduction Project Management is the application of different processes, methods, knowledge, skills and experience to achieve the different kinds of goals and pre determined of objectives. Each and every project completed by the organization is sure to encompass different kinds of risks. The management of the business organization thus conducts a proper risk management and schedules each and every task according to a proper time. This helps the management to avoid any kind of risks that may occur while the execution of the project.The following report studies the tools that are used to manage the projects of the organization. Project Management tools are aids that assists an individual or a team to effectively organize work and manage different kinds of projects and tasks of the organization. The tools used in the management of a particular project can be easily used by different employees and not just the members of the organization. Though there is significant number of such tools present still the managers of the projects face different kinds of difficulties to complete the project. The absence of proper testing ground of these tools has proved the tools to be inefficient. However some recent studies have shown that the use of Project Management tools has a positive impact on the organization. It helps the organization to improve the accuracy and efficiency of a particular project. Project Management Planning Tools As mentioned in the introductory section of the following project, two different types of elements of Project management has been selected in this particular project. This includes the likes of WBS or Work Breakdown Structure while the other one is another crucial element, which is Gantt chart(Remington and Pollack 2016). The purpose of Work Breakdown Structure is to help the formulators of the project to plan an effective project by breaking down key tasks
4 CRITIQUE OF PROJECT MANAGEMENT PLANNING TOOLS or activities into more manageable and smaller units of work. WBS generally produces a detailed list of tasks that are performed for a particular project and helps in the proper scheduling, delivering better costing and also planning the resource for the project(Lock 2017). Figure 1: Work Breakdown Structure Source: (As created by the Author) On the other hand Gantt chart is a horizontal chart that is used for the scheduling of the project. The different activities are listed one after the other and sub tasks are also presented in the following chart(Carvalho and Rabechini Junior 2015). The creation of large tasks and their subtasks helps the formulator of the project to ease the pressure of the work and plan the project in a proper, effective and scientific manner. Gantt charts can be used in a number of different manners which includes the likes of;
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
5 CRITIQUE OF PROJECT MANAGEMENT PLANNING TOOLS Used for planning time scale for a research or project Can also be used to estimate the different kinds of resources required Graphical illustration of schedule of the different types of tasks Planning, coordination and tracking different kinds of specific tasks for the project It is also good for simple projects that helps to maintain the smoothness ofbusiness operations. Figure 2: Gantt chart Source: (As created by the Author)
6 CRITIQUE OF PROJECT MANAGEMENT PLANNING TOOLS Analysis and Critique The following section deals with the analysis of the project management tools and some critique of the tools. Work Breakdown Structure is one of the key project deliverables that helps inorganizationoftheteam’sworkintodifferentkindofmanageablesections(Golini Kalchschmidt and Landoni 2015). The Project Management Body of Knowledge defines the Work Breakdown structure as a proper deliverable oriented Hierarchical decomposition of the work to be executed by the project team(Kendrick 2015). The WBS visually defines the scope into manageable chunks that a project team can understand as each of the different levels of the work breakdown structure provides further definition and details. An easy and proper way to think about a work breakdown structure begins with the project at the top level deliverable and is further decomposed into different sub-deliverables which is shown inFigure 1of the project. The Work Breakdown Structure follows a number of guidelines which are as follows; The top level generally represents the final deliverable or project All the aspects of Work Breakdown Structure doesn’t need to be defined and determined at the same level The work packages are unique in nature and must not be copied across the work breakdown structure The work packages must be flexible in nature On the other hand Gantt chart requires the project plans to be structured normally requiring tasks that are to be performed in a specific order(Schwalbe 2015). On the other hand, Carvalho and Rabechini Junior (2015)example a particular publication must be written in a proper way. The software that is used in the creation of the Gantt chart is already capable of
7 CRITIQUE OF PROJECT MANAGEMENT PLANNING TOOLS linking all the different tasks from the beginning to the end of the task. The following application helps the formulator of the projects to create the tasks and allocate resources to each of them in an efficient and effective manner. Strengths The following sub section describes the strengths of both the Project management tools that have been referred to in the following project. The benefits of the use of Work Breakdown Structure are as follows; 1.It helps to prevent the works from slipping through different kinds of cracks. The WBS provides the project team with the actual picture of the situation and helps in the delivery of what is to be done in the project accordingly. 2.The other benefits of using WBS in the Project Management is that it provides the team members of the project with a perfect understanding of where the different pieces fit into the overall project management plan. It also provides all with an implication of what is to be done actually. 3.WBS Project Management also helps to prevent different kinds of changes which are inevitable for the completion of the project. The use of proper and effective actions is important for the success of the project and thus it is one of the main benefits of the said Project management Tool. The benefits of using Gantt chart in Project Management are as follows;
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
8 CRITIQUE OF PROJECT MANAGEMENT PLANNING TOOLS 1.Clarity-One of the most important benefits of Gantt chart is the capability to carry out multiple tasks at a single time and in a single document. The stakeholders throughout the organization can easily understand where the teams stand in a process to complete the project. 2.Motivation-The chart helps to increase the motivation of the employees as because it is one of the elements of Project Management which brings in the capability to focus on the front of a task timeline. 3.Communication-The teams can use Gantt chart to replace different kinds of meetings and enhance the status updates of the organization. It will be easier for the management of the organizations to clarify and maintain each and every task in a proper manner by using Gantt chart as a means of communication tool. Limitations The main limitations of the Work Breakdown Structure are as follows; 1.Step by Step Approach always provides pain-The thing with WBS is that the step by step approach of the application is quite a problem as because it stems the self belief of the managers as it involves a thorough revision and intense calculation. 2.The problem of Requirements-The time when the formulator of WBS keeps a particular deliverable in the WBS, one can end up breaking down these activities into different requirements which is again a big problem for the organization(Kendrick 2015). 3.No buying in the needs of processes-The project team of the organization generally uses all the expertise and experience to achieve all the different deliverables into a natural manner as possible(Kerzner and Kerzner 2017). The following will again involve the use of large time and is thus one of the biggest disadvantages.
9 CRITIQUE OF PROJECT MANAGEMENT PLANNING TOOLS The disadvantages of Gantt chart are as follows; 1.Too much dependency on the Work Breakdown Structure is one of the largest disadvantages. 2.It only works with smaller and sometimes projects with limited scope. 3.The fact that Gantt charts does not perform enough with project time constraints. Comparison of the Two Tools Work-Breakdown StructureGantt chartWBSbreaksprojectintosmall subgroups GanttChartbreakstheproject into small tasks WBS are things not actions Gantt are actions not things Non Visual view of the project Visual view of the project Conclusion WBS and Gantt chart are seen to be important rather one of the most key tools for the proper completion of the project. Both the tools are necessary for the preparations of the project management charter. The WBS fixes the schedule of the project whereas the Gantt chart is an ideal tool for the conduction and determination of the different scheduling dates and also to estimate the time limit that a project would take to complete. Work is generally undertaken by
10 CRITIQUE OF PROJECT MANAGEMENT PLANNING TOOLS the management of the business organization based on such estimates and thus it helps in the success of the project.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
11 CRITIQUE OF PROJECT MANAGEMENT PLANNING TOOLS References Carvalho, M.M.D. and Rabechini Junior, R., 2015. Impact of risk management on project performance: the importance of soft skills.International Journal of Production Research,53(2), pp.321-340. Golini, R., Kalchschmidt, M. and Landoni, P., 2015. Adoption of project management practices: Theimpactoninternationaldevelopmentprojectsofnon-governmental organizations.International Journal of Project Management,33(3), pp.650-663. Kendrick, T., 2015.Identifying and managing project risk: essential tools for failure-proofing your project. Amacom. Kerzner, H. and Kerzner, H.R., 2017.Project management: a systems approach to planning, scheduling, and controlling. John Wiley & Sons. Lock, D., 2017.The essentials of project management. Routledge. Remington, K. and Pollack, J., 2016.Tools for complex projects. Routledge. Schwalbe, K., 2015.Information technology project management. Cengage Learning.