Running head: PROJECT MANAGEMENT Bungalow project Name of the Student Name of the University Author’s Note
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
1 PROJECT MANAGEMENT Table of Contents 1. Introduction..................................................................................................................................2 1.1 Background of the case study................................................................................................2 1.2 Project aims and objectives...................................................................................................2 2. Scope management plan..............................................................................................................3 2.1 Scope statement nad project statement document.................................................................3 2.2 WBS.......................................................................................................................................5 2.3 WBS dictionary.....................................................................................................................6 2.4 Scope validation.....................................................................................................................7 2.5 Roles and responsibilities......................................................................................................7 3. Time schedule..............................................................................................................................8 3.1 Network diagram...................................................................................................................8 3.2 Critical path...........................................................................................................................9 Bibliography..................................................................................................................................10
2 PROJECT MANAGEMENT 1. Introduction 1.1 Background of the case study The paper mainly reflects on the construction of strip footings. It is found that the main aim of the project is to create components of project management plan by utilizing proper information. It is found that the construction of the bungalow will generally be supported with the brick piers as well as timber joints whereas the roof is tiled properly. It is found that bungalow that is constructed mainly includes six different rooms in total, kitchen dining, lounge, main bedroom, guest bathroom, second bedroom as well as laundry. It is found that the construction of Bungalow project is quite helpful in providing proper business value to the construction company. 1.2 Project aims and objectives The main aim of the project is to properly construct the bungalow on strip footings that will further include six different rooms in total including main bedroom, second bedroom, kitchen dining, lounge, guest bathroom as well as laundry. The objectives of the project mainly include: ï‚·To construct the bungalow on strip footing ï‚·To include six rooms in the bungalow including bedroom, kitchen, lounge, bathroom as well as laundry. ï‚·To provide proper business value with the construction of the bungalow project
3 PROJECT MANAGEMENT 2. Scope management plan 2.1 Scope statement nad project statement document Project scope description The scope of the project includes: ï‚·Construction of bungalow project ï‚·Floor must be supported on brick piers and timber joists ï‚·Plastering of internal finish ï‚·Weekly payment to the labourers ï‚·Proper schedule and cost management Project deliverables The deliverables of the project are reflected below: ï‚·Project plan ï‚·Project status report ï‚·Site prepration report ï‚·Construction progress report ï‚·Inspection of mortage holder ï‚·Construction of bungalow project Project acceptance criteria The acceptance criteria of the project are elaborated below:
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
4 PROJECT MANAGEMENT Progress of schedule:If the project can get completed 20% faster than the given schedule then it will be considered to be successful which means that the client will accept the project. Budget:If the entire work of the project gets finished within the time that is provided by the project manager then the project will be acceptable for the clients as they do not face any type of financial issues. Project exclusions The exclusions of the project are elaborated below: ï‚·Information regarding the project suppliers are not provided within the project ï‚·Training manuals or guides are not provided to the project manager as help as the project managers who are involved with the bungalow project are highly experienced. Project constraints The constraints of the project are mainly listed below: Budget:If the entire project does not gets completed within the assumed budget then the chnaces of occurring financial issues are quite high that can further obstruct the progress of the project. Time:If the project duration that is needed to be completed is generally increased by 50% then it can obstruct the progress of the project. Project assumptions The assumptions that are made within the project are listed below:
5 PROJECT MANAGEMENT ï‚·It is assumed that the work week of the project will be mainly based on 50 hr week ï‚·It is assumed by the finacial manager that the budget that is needed for the project will be finanaced with the help of bank loan.
6 PROJECT MANAGEMENT 2.2 WBS 0Bungalow project 1Design 1.1 Design structure, meeting client requirements 1.2Appoint project manager 1.3Modify till acceptance has been achieved 1.4Conduct soil test 1.5Receiving design approval from client 1.6Drawing plans and schedules 1.7Attain enginerring certificate 1.8Submit plans to local council 1.9Prepare and submit application to QBCC 1.10Select Insurance package 1.11Engage project management team 2Site preparation 2.1Erecting temporary safety fencing 2.2Installing portable WC facilities 2.3Installing temporary power hole 2.4installing water point 2.5Fund site power and water costs 2.6Clearing the site 2.7Setting out the dwelling 2.8Dig foundations 2.9Foundation inspection 2.10Installing trench mesh 2.11Pour footings 3Building (to Lock up) 3.1Erecting double brick external wall system 3.2Install windows and doors 3.3install glazing 3.4Install floor joists 3.5Exrect internal timber frame, floor and walls 3.6Erecting the roof trusses and battens 3.7Install roof railing 3.8Fit ceiling joists 3.9Fit T & G strip flooring 3.10Install guttering 3.11Fit roof tiles 3.12Rough in electrical 3.13Rough in plumbing 4Building (Hand Over) 4.1Install insulation 4.2Fit plasterboard to ceilings 4.3Fit plasterboard to walls 4.4Crane lift pool shell into place 4.5 Install & connect swimming pool shell pump 4.6Conduct second fix 4.7Tiles 4.8Paint walls and ceilings 4.9Fit off electrical points and appliances 4.10Fit off plumbing & heating points 4.11Installing downpipes and connect to storm water 4.12Landscapping 4.13Connection to server 4.14Connection to water supply 4.15Connection to power supply 4.16Clean up site 4.17Client handover 4.18Mortage holder inspection Figure 1: Work breakdown structure (Source: Created by Author)
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
7 PROJECT MANAGEMENT 2.3 WBS dictionary Figure 2: WBS dictionary (Source: Created by Author)
8 PROJECT MANAGEMENT 2.4 Scope validation Scope validation is mainly defined as one of the procedure that is helpful in formalizing the acceptance of the completed deliverables of the project. The main benefit of the entire process is that it generally helps in bringing objectivity for the acceptance process that further helps in increasing the chances of the final service or result acceptance by proper validation of each of the project deliverable. 2.5 Roles and responsibilities The roles and responsibilities of the stakeholder who are involved in the project are reflected in the table below: Project rolesResponsibilities Project managerTheprojectmanagerisresponsibleof managingtheactivitiesstartingfromthe initiationphaseforconstructingthe bungalow. Construction managerTheconstructionmanagerismainly responsible of managing the constriction work including the construction of 6 rooms, tiled roof, external gutters and more. LabourersThelabourersaremainlyresponsibleof completingtheconstructionworkinthe projectsothatthebungalowcanbe effectively constructed. SuppliersA supplier is the person or the person who
9 PROJECT MANAGEMENT helpsinprovidingbusinessproductor service. They generally provide high quality ofmaterialsforthepurposeofbungalow construction. ContractorThecontractorismainlyresponsibleof providing all the materials, labour as well as equipment for the construction of bungalow. 3. Time schedule 3.1 Network diagram Figure 3: Network Diagram (Source: Created by Author)
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
10 PROJECT MANAGEMENT 3.2 Critical path Figure 4: Critical path (Source: Created by Author)
11 PROJECT MANAGEMENT Bibliography Badewi, A., 2016. The impact of project management (PM) and benefits management (BM) practicesonprojectsuccess:Towardsdevelopingaprojectbenefitsgovernance framework.International Journal of Project Management,34(4), pp.761-778. Hornstein, H.A., 2015. The integration of project management and organizational change management is now a necessity.International Journal of Project Management,33(2), pp.291- 298. Kerzner, H. and Kerzner, H.R., 2017.Project management: a systems approach to planning, scheduling, and controlling. John Wiley & Sons. Papke-Shields, K.E. and Boyer-Wright, K.M., 2017. Strategic planning characteristics applied to project management.International Journal of Project Management,35(2), pp.169-179. Serra, C.E.M. and Kunc, M., 2015. Benefits realisation management and its influence on project successandontheexecutionofbusinessstrategies.InternationalJournalofProject Management,33(1), pp.53-66. Svejvig, P. and Andersen, P., 2015. Rethinking project management: A structured literature reviewwithacriticallookatthebravenewworld.InternationalJournalofProject Management,33(2), pp.278-290. Todorović, M.L., Petrović, D.Č., Mihić, M.M., Obradović, V.L. and Bushuyev, S.D., 2015. Projectsuccessanalysisframework:Aknowledge-basedapproachinproject management.International Journal of Project Management,33(4), pp.772-783.