Running Head: PROJECT MANAGEMENT Project Management: Bungalow Project Name of the Student Name of the University
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
1PROJECT MANAGEMENT Part B Cost Planning and Budgeting For this project, a bungalow will be constructed and for this specific purpose, suitable cost estimation is performed to determine the overall budget for the project. Now, in order to determine the budget, it is required to consider two types of costs: i.Human Resource Costs– This type of cost corresponds to the wages and salaries of the staff and workers that are deployed in the project. The employees involved in the project generally have standard wage structure that does not deviate in the projects. On the other hand, for the external workers and personnel, the cost need to be determined and fixed during hiring. The general convention for the same in large scale projects is hiring contractor and workers through tender so as to ensure the lowest cost bidder is selected to minimize the costs. ii.MaterialCosts–Thistypeof costcorrespondstothecostsof materials, equipments and other resources that are being utilized in the project. Generally, these resources have fixed costs and the overall cost changes based on the number or units of the materials utilized in the project. However, the material costs may change if there is a significant change in the market. In this project, the human resource costs are determined using bottom up estimation technique as shown in the following table. WBSTask NameDurationPredecessorsResource NamesCost 0Construction of Bungalow60 wks$251,460.00 1Preliminary51 wks$193,950.00
2PROJECT MANAGEMENT 1.1Design Structure2 wksTradesman$3,600.00 1.2Appoint Project Manager48 wks2Tradesman[50%]$43,200.00 1.3Modify Changes1 wk2Tradesman[25%]$450.00 1.4Conduct Soil Test2 wks2$0.00 1.5Receive Client Design Approval1 wk3Tradesman[50%]$900.00 1.6Draw Plans and Schedules2 wks4Tradesman$3,600.00 1.7Attain Engineer Certification2 wks5$0.00 1.8Submit Plans to Local Council6 wks7$0.00 1.9Prepare and Submit Application to QBCC1 wk8Tradesman$1,800.00 1.10Select Insurance Package2 wks14Tradesman$3,600.00 1.11Engage the Project Management Team38 wks7Tradesman[200% ]$136,800.00 2Site49 wks$4,200.00 2.1Erect Temporary Fencing1 wk9$0.00 2.2Install Portaloo to Site48 wks14$0.00 2.3Install Temporary Power Pole1 wk9$0.00 2.4Install Water Point1 wk14$0.00 2.5Power and Water Construction Costs1 wk14Labourers[50%], Tradesman[50%]$1,500.00 2.6Clear Ground1 wk9Tradesman[20%]$360.00 2.7Set Out the Dwelling1 wk16Labourers[50%], Tradesman[50%]$1,500.00 2.8Dig Foundations3 wks17$0.00 2.9Foundation Inspection1 wk18Labourers[20%]$240.00 2.10Install Trench Mesh1 wk19Labourers[20%], Tradesman[20%]$600.00 2.11Pour Footings1 wk20$0.00 3Building (To Lock Up)13.5 wks$33,630.00 3.1Erect Double Brick External Wall System3 wks21Labourers, Tradesman$9,000.00 3.2Door and Window Frames1 wk26Labourers[50%], Tradesman[50%]$1,500.00 3.3Glazing1 wk27$0.00 3.4Install Floor Joists1 wk26Tradesman[50%]$900.00 3.5Erect internal timber frame, floors and walls3 wks29Labourers[50%], Tradesman[50%]$4,500.00 3.6Install roof trusses and battens3 wks30Tradesman[80%]$4,320.00 3.7Install Roof Rail2.5 wks31Labourers[20%], Tradesman[20%]$1,500.00 3.8Ceiling Joists1 wk31Labourers[50%], Tradesman[50%]$1,500.00 3.9Fit T & G Strip Flooring1 wk32Labourers[75%], Tradesman[75%]$2,250.00 3.10Install Guttering1 wk31Tradesman[20%]$360.00
3PROJECT MANAGEMENT 3.11Fit Roof Tiles2 wks33Labourers, Tradesman$6,000.00 3.12Rough in Electrical1 wk33Tradesman[50%]$900.00 3.13Rough in Plumbing1 wk33Tradesman[50%]$900.00 4Building (Handover)10 wks$19,680.00 4.1Install Insulation1 wk37Labourers[50%]$600.00 4.2Plaster Ceiling1 wk37$0.00 4.3Plaster Walls1 wk37$0.00 4.4Crane Lift Shell into Place0.2 wks40$0.00 4.5Install and Connect Swimming Pool Shell / Pump3 wks42$0.00 4.6Conduct Second Fix2 wks42Labourers, Tradesman$6,000.00 4.7Tiles4 wks44Tradesman$7,200.00 4.8Paint Walls and Ceilings2 wks45$0.00 4.9Fit Off Electrical Points and Appliances2 wks46$0.00 4.10Fit Off Plumbing Points2 wks45$0.00 4.11Install Downpipes and Connect to Storm Water2 wks34Tradesman[10%]$360.00 4.12Landscape the Site3 wks40Labourers[50%], Tradesman[50%]$4,500.00 4.13Connection to Sewer1 wk40Tradesman[10%]$180.00 4.14Connection to Water Supply1 wk40Tradesman[10%]$180.00 4.15Connection to Power Supply1 wk47Tradesman[20%]$360.00 4.16Clean Site1 wk50Labourers[25%]$300.00 4.17Client Handover1 wk51$0.00 4.18Mortgage Holder Inspection1 wk52$0.00 On the other hand, for estimation of the material costs required in the project, top down estimation technique is utilized (Harrison & Lock,2017). The cost estimation for the materials required for the project is shown in the following table. Acti vity # Un its UnitPlantMateria l/FC Total Cost Optimistic Cost Pessimistic Cost Most likely CostMean 1 1.12 $ 2,250. 00 --$ 4,500.00 $ 3,600.00 $ 6,750.00 $ 4,500.00 $ 4,950.00 1.248 $ 1,350. 00 -- $ 64,800.0 0 $ 51,840.00 $ 97,200.00 $ 64,800.00 $ 71,280.0 0 1.30.2 5 $ 2,250. 00 --$ 562.50 $ 450.00 $ 843.75 $ 562.50 $ 618.75
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
6PROJECT MANAGEMENT 00 4.11 $ 4,000. 00 $ 4,000. 00 -$ 8,000.00 $ 6,400.00 $ 12,000.00 $ 8,000.00 $ 8,800.00 4.110.1 $ 2,250. 00 -$ 150.00$ 375.00 $ 300.00 $ 562.50 $ 375.00 $ 412.50 4.121 $ 1,875. 00 -$ 1,800.00$ 3,675.00 $ 2,940.00 $ 5,512.50 $ 3,675.00 $ 4,042.50 4.130.1 $ 2,250. 00 -$ 400.00$ 625.00 $ 500.00 $ 937.50 $ 625.00 $ 687.50 4.140.1$ ---$ - $ - $ - $ - $ - 4.150.2 $ 2,250. 00 --$ 450.00 $ 360.00 $ 675.00 $ 450.00 $ 495.00 4.160.2 5 $ 1,500. 00 --$ 375.00 $ 300.00 $ 562.50 $ 375.00 $ 412.50 4.171$ ---$ - $ - $ - $ - $ - 4.181$ ---$ - $ - $ - $ - TOT AL $2,76,51 4.38 $ 2,21,211.50 $ 4,14,771.56 $ 2,76,514.38 $3,04,16 5.81 Considering the total costs of human resources and the most likely outcomes for the material resources, the total projected budget is$555,625. Quality Management Planning Quality management plan is required to ensure the right quality standard is fulfilled for the project. Before developing a quality management plan, it is first required to develop the quality standards that need to be met during the project. Once the standards are developed, it is required to ensure these standards are met and fulfilled during the project. Similarly, for this project, the quality should focus on the bungalow i.e. the bungalow to be constructed should meet certain construction and usage quality standards (Kerzner & Kerzner, 2017). This will require proper standard of materials used and suitable quality of work. Accordingly, a quality assurance manager can be deployed who will supervise the progress of the project and ensure the
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
7PROJECT MANAGEMENT project meets the quality standards of the project. Furthermore, he needs to report the progress to the project manager who can supervise whether the project meets the quality standards in terms of quality of materials and the construction itself.
8PROJECT MANAGEMENT References Fuller, M. A., Valacich, J. S., George, J. F., & Schneider, C. (2017).Information Systems Project Management: A Process and Team Approach, Edition 1.1. Prospect Press. Harrison, F., &Lock,D.(2017).Advancedprojectmanagement:astructuredapproach. Routledge. Kerzner, H., & Kerzner, H. R. (2017).Project management: a systems approach to planning, scheduling, and controlling. John Wiley & Sons. Lock, D. (2018).The essentials of project management. Routledge. Schwalbe, K. (2015).Information technology project management. Cengage Learning. Tonchia,S.(2018).ProjectCostManagementandFinance.InIndustrialProject Management(pp. 153-170). Springer, Berlin, Heidelberg.