Report
AI Summary
The CEO of Company ABC has requested a review of the current manufacturing processes, proposing changes and equipment upgrades to meet future demands. The project aims to increase production from 250 to 400 widgets per day over a five-year timeline, with a goal to reduce defect rates by half within two years. The project will require procurement process improvements, warehouse and delivery logistics adjustments, and contingency planning to account for unforeseen events.

Contribute Materials

Your contribution can guide someone’s learning journey. Share your documents today.
Document Page
Running Head: PROJECT MANAGEMENT THEORY AND PRACTICE April 26, 2018
PROJECT MANAGEMENT THEORY
AND PRACTICE
ASSIGNMENT INFORMATION
Full/ Part Assignment Full
Date Assignment Issued
Date Assignment Due
Assignment IV by Col. Anil Ahluwalia
TO BE FILLED BY THE FACULTY
Faculty Name Dr.Vivek Mohan
Contact No. +971562192560
Email ID vivek@ebsedu.org
TO BE FILLED BY THE SUTDENT
Student Name
Student ID
Email ID
Turinitin ID 17771942
Turnitin Enrollment key GM714
Course
Date Submitted
1 | P a g e

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Running Head: PROJECT MANAGEMENT THEORY AND PRACTICE April 26, 2018
TABLE OF CONTENTS
Task 1................................................................................................................................................3
Answer A.......................................................................................................................................3
Answer B.......................................................................................................................................5
Answer C.......................................................................................................................................8
Task 2................................................................................................................................................8
Answer A.......................................................................................................................................8
Answer B.......................................................................................................................................9
Task 3..............................................................................................................................................11
Answer A.....................................................................................................................................11
Answer B.....................................................................................................................................12
Task 4..............................................................................................................................................13
Answer A.....................................................................................................................................13
Answer B.....................................................................................................................................13
Reference List..................................................................................................................................15
2 | P a g e
Document Page
Running Head: PROJECT MANAGEMENT THEORY AND PRACTICE April 26, 2018
TASK 1
ANSWER A
As per the project management Institute (PMI), the “Project” is called as the temporary endeavor
which has been undertaken for creating some unique product for the service or the result. Also a
project is considered as temporary as it belongs a definite commencing and ending time. The
project is also defined within a specific scope.
At present day the project plan is considered as the very broad level of plan that is prepared
initially while there is the main focus on the scheduling. Contrary, the project management plan is
considered as the detailed document which has dealt with how the part of the project.
Under scenario as stated in the Dubai Project, the formal document has to be prepared with the
purpose as well as objectives by creating the project charter for carrying out the project. It has
provided with the preliminary delineation for the role along with the responsibilities and also the
project goals (Larson & Gray, 2013)
3 | P a g e
Document Page
Running Head: PROJECT MANAGEMENT THEORY AND PRACTICE April 26, 2018
Figure: template of project charter
Source (Burke, 2013)
This project charter also identifies the stakeholder and also sets the project milestones in another
broad way. Also the project charter serves the reference for the authority with the future for the
project itself.
Through the baseline consideration
It is the baseline management plan through which the documentation can be done pertaining with
the variances at a given baselines to review along with management across the project.
The project documents also should be reviewed by all kind of key stakeholders so that there is the
important of assessing all the people for needed the improvement with different parts within the
project plan.
4 | P a g e

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Running Head: PROJECT MANAGEMENT THEORY AND PRACTICE April 26, 2018
Through the Kick –off meeting
This meeting has considered as the effective means in case to bring the key stakeholders together
with the discussion under the project. There is the kick-off meeting which has been initiated for
the planning process (Fleming & Koppelman, 2016). The topic has the following agendas to
consideration:
1. Team building
2. Project vision or the sponsor
3. The size of the groups with the sub groups
4. Ground rules
5. Delegation for the role along with the responsibilities
6. Decision making processes.
ANSWER B
For advisory level, the project scope of the music award program is evaluated as follows:
1. Time: The estimation of the cost or the expenditure is the ultimate requirement for any
project. The amount of time which is required for producing the deliverables can be
directly related with the amount for the requirements that has the other part for the end
result or the scope.
2. Cost: the estimation for the amount of the money is needed to be required for completion
of the project. The cost itself has been encompasses the various techniques, like resources,
labor rates as well as the contractors for the risk estimation and also the bills for the
materials.
3. Scope: As per the functional product there is the make-up of the deliverables under the
project. Also the scope of the project has identified up to the given project with the best
chance for the success. Also the scope has the potential for changing the life cycle, or the
concept of the scope for creep.
4. Performance: To measure the performance of the project there are some criteria which is
needed to be fulfilled by the project (Binder, 2016).
5 | P a g e
Document Page
Running Head: PROJECT MANAGEMENT THEORY AND PRACTICE April 26, 2018
Like the project is expected to have the specific objectives and also the may costs so much
which would be completed within the certain time frame.
The experience which has shown under the project performance can be measured as the
terms called esoteric for the valuation of the project with the company president as per the
quantitative as the earned value systems for using with large government along with the
utility projects.
The performance can be judged by considering the following points for the project (Kiu, et
al., 2017):
1. Measurable indicators
2. Clear objectives
3. Responsibility definition
4. Management organization
5. Authentication of the data
6. Management organization
Planning or scheduling of the project
Project scheduling is considered as the tool for communicating the works that is needed to
perform within the timeframes. Thus the project scheduling will reflect all kind of work
which is associated with the delivery of the project on time. Without any full or the
complete schedule that are the project managers who are unable for communicating the
complete effort in the ways of costing and also resources as per the necessity of the project
as stated here.
Milestone of the project
Event Program Management- Dubai Best Music
Award Program, 2018
Milestone
Project start 5th March, 2018
Permission from Local Governments 7th March, 2018
Event site finalization 12th March , 2018
Invitation to all guest 23rd March, 2018
Confirmation of Hotel and other residential
requirement
25th March, 2018
Rehearsal start from the program 26th March, 2018
Technical Arrangements 1st April, 2018
Final Event Occurred 6th April, 2018
6 | P a g e
Document Page
Running Head: PROJECT MANAGEMENT THEORY AND PRACTICE April 26, 2018
Scope statement
Project Description
DUBAI has recently been chosen as a venue for hosting "BEST MUSIC
AWARD 2018" scheduled for 06 May 2018 during evening at Atlantis
Hotel arena from 2000 hrs to 2230 hours. This shall see celebrities and
other dignitaries from all over the world visiting the UAE with an
approximation of 500 persons expected to be in attendance for this event.
The opening ceremony shall be inaugurated by famous music artist
"Shakira" and the best music award shall be presented by his Highness
Sheikh Al Makhtoum. Total budget for this event is AED 250000
maximum including all arrangements which is to be mobilized from potential
sponsors and AED 100000 grant from Ministry of Social Affairs.
Project Deliverables Best Award in Music For the year 2017-2018
Out-of Scope Items Other international hazards from goverments
Project Objectives To facilitate Award to the Popular and best Musicians, Music Directors,
Music composers, Singers etc.
Cost Objectives AED 25000
Schedule Objectives To check the final event would be made within the predefined schedule
Acceptance Criteria Accepeted by the Local Government of Dubai, Music Board of Dubai
Constraints Safety Risk and other hazards with fans, invitation to wrong persons etc.
Assumptions It is a Best Music Program in the world. So there would be a full gathering
from outside countries who loves music
Project Name: Event Program Management- Dubai Best Music Award Program, 2018
Prepared By:
Date: 6th April, 2018
7 | P a g e

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Running Head: PROJECT MANAGEMENT THEORY AND PRACTICE April 26, 2018
ANSWER C
As per the project priorities concerned in the Dubai Best Music Award Project, 2018 there should
be detailed scheduling for all kind of members are necessary. So the for this project scheduling is
very important to take care the whole implementation. Through the help of project scheduling
project can be divided into number of small projects and thus those can be followed up through the
implementation of the various programs. In this kind of projects the event management is very
much necessary to take care.
The priorities works are as follows:
1. Set up of Event Hall
2. Set up of Event stage
3. Set up of Technical arrangements
4. Set up of final stage
5. Final cost estimation
6. Event Performance (Eventus Training & Events Ltd, 2018).
TASK 2
ANSWER A
WBS and WBS dictionary:
8 | P a g e
Document Page
Running Head: PROJECT MANAGEMENT THEORY AND PRACTICE April 26, 2018
WBS
Element Description Duration (days) Predecessor(s) Cost estimation
L1 L2 L3 L4 In AED
1.0 Event Program Management- Dubai Best Music Award Program, 2018 250000
1.1 Project Start Approval of project start from Local government 1 N/A
1.2 Weekly Status Reports
Weekly status report for the duration of the project showing cost and schedule
status along with status of previous weeks work, projection of next weeks
work, and any issues requiring resolution 1
1.1
1.3 Certificates and Inspections
1.3.1 Permits
1.3.1.1 Event Permit County permit required prior to any site work. 5 1.1 5000
1.3.1.2 Electrical Permit County permit required prior to any electrical work being conducted on site 5 1.1 3000
1.3.1.3 Visa Permit County permit required prior to invite other international guest 5 1.1 10000
1.3.2. Inspections
1.3.2.1. Foundation Inspection
County inspection required after foundation is complete. Required before any
framing work can proceed and required prior to occupancy inspection. Must be
scheduled minimum of 5 days prior to requested inpection date 1
1.3.1.1, 4.2
5000
1.3.2.2. Electrical Inspection
County inspection required after all electrical work compelete (minus
fixtures). Required before drywall work can proceed and required prior to
occupancy inspection. Must be scheduled minimum of 5 days prior to
requested inspection date 1
1.3.1.2, 8.1
5000
1.3.2.3. Hotel and other residential Inspection
County inspection required for providing rooms in hotels and other resting
places which is needed to be scheduled minimum of 5 days prior to requested
inspection date. 1
1.3.1.3, 7.1
10000
1.3.3. Final settlement
1.3.3.1. Occupancy Certificate
Final county inspection prior to an habitation of the structure. All previous
deficiences must be corrected and all final inspections must be complete.
Must be scheduled minimum of 10 days prior to requested inspection date 1
9.3, 10.3, 10.4, 10.5
1.4 Project finalization Project is finalized, all necessary inspections are complete and approved.
Event is ready to perform. 1 1.2.3.1 40000
2.0 Invitation
2.1. Invitation to international award winning participants Invitation should done online as well as offline mode 30 1.1, 3.1.3 2000
2.2. Confirmation from the right guest to be invited The invited guest is confirmed using confirmation call 1 2.1
3.0 Event hall preparation
3.1. Site Visiting
3.1.1. Offer Location, viewing, and offer with acceptable project requirments 2 1.1
3.1.2. Consideration Negotiations with current owner. Can be conducted in parallel with other Hall
managers and event producers 2 3.1.1
3.1.3. Acceptance Closing and taking the charge of the place for the contract time period 1 3.1.2 20000
3.2. Event Preparation
3.2.1. performing rehearsal Rehearsal is taking place for the time period of the performance well before
the event date 5 2.1, 3.1.3 50000
3.2.2. Grading prefinal stage perfomance should be graded by other external judges 5 3.2.1 10000
3.2.3. Technical set up Stage and other requisite is needed to set up by the technical memebers
within very short and defined timeline 10 3.2.2 20000
4.0 Event Performing
4.1. Programmes performance One by one event performed at stage by other members 1 3.2.3 48000
4.2. Final award distribution Award regarding the music and other related event has been distributed
among the winners 1 4.1 22000
5.0 Project Closure
Close of event At the end of the event all the guests and winners are checked out and they go
back safely at their own places 3 4.2
Title
ANSWER B
To control and mitigate the below identified risk:
i. Venue Management staff failing to show up at designated time for arranging the
stage as Municipality/Event location owners have given specific time to work:
For the effective event management along with the risk mitigating factor, the location of the event
is needed to preoccupy for specific time as the music award program is international one and it
will be broadcast throughout the globe within that specific time.
First of all there must be an approval from the government of the country for taking permission for
this kind of international standard event. Together with this there is needed have the approval from
local area councilor to conducting the program. The local government is found to be respond
9 | P a g e
Document Page
Running Head: PROJECT MANAGEMENT THEORY AND PRACTICE April 26, 2018
along with the advice with specific information so that the team or project members should not be
getting any problem from other localities or any offensive problems would not be happened.
At first time the local government will concerned with at the stage for how the event will be
affected for the neighboring community. At this stage it is needed to check that the project would
not be affected by the neighboring community (Larson & Gray, 2013).
ii. Fighting between Stage workers and local security staff
The risk of fighting may be occurred while the stage workers and the local security staff would get
into a conflict. In this situation, the project producer needs to be alert so that there would not be
any political party or the local staff cannot get over any issue for any kind. For this the
Government security and permission should be very helpful to mitigate the risk.
iii. Pivotal error committed by Invitation distribution team by sending invitations to
wrong addresses and no confirmation received from key invitees.
There can be risk of sending invitation to the wrong invitation address as there is more risk to face
as this would be a gathering of many special guests from all over the world. For the risk
management plan is needed to design for eliminating the impact of the wrong invitation. The
invitation thus is needed to be confirmed thrice with the recipients for making it zero percentage
(Open Book Publishing, 2018). Another contingency plan is needed to maintain for this kind of
risk
iv. Abusive behavior along sidelines by uninvited spectators
In this case the abusive behaviour with the sidelines for uninvited spectators is not always
expected rather it can be taken into consideration and the unwanted guests can be rechecked with
other professional identification data.
v. Inadequate parking.
Parking is another serious risk of the project management and also the program management. The
parking spaces is not inconvenience with the nearby residence and thus it is needed to book
another parking slot nearby the program events or it can be better to let know the project managers
for evaluating the inadequacy of places in case of parking
vi. Serious injury for one of the team members during stage supervision
The risk of having serious injury from one of the team members during the stage supervision can
be mitigated when the company is needed to take the responsibility to supply appropriate safety
10 | P a g e

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Running Head: PROJECT MANAGEMENT THEORY AND PRACTICE April 26, 2018
equipment and also the employees and other stage performers have to wear the personal protective
equipment along with appropriate time or place (Project Management Institute, 1997).
TASK 3
ANSWER A
Team effectiveness:
For the project of international music award team building is most important as they follow the
interdisciplinary along with multidisciplinary for the interchangeable which is exactly in same
meaning. In case of the multidisciplinary team project there are team members from other
disciplines which may work within the same project.
The effectiveness is much essential for the success of this kind of multidisciplinary project which
is on the other hand any unrealistic expectations which is ambiguity about the shared goals which
will hinder under the project. For this project it is also important for the common ground which is
being arisen when the team is being composed with other teams.
The effectiveness also increased when there is a perfect co-ordination required between the team
members. As per the project schedule, there are both easy or hard segments within this project and
thus it are required to encourage the other team associates to collaborate within other disciplines.
The interdisciplinary program within this project must be equally divisible within the disciplines
for which the assignments will based on the particular discipline of the music session.
Another significant point for the team communication has been recommended for scheduling the
collaborating the classes when there is the order for increasing the opportunities in communicating
between the collaborating classes as they have the joint presentations or performance.
Team support is needed for the collaboration within the department and the other instructors. It is
definitely enhancing the team effectiveness (Eventus Training & Events Ltd, 2018).
11 | P a g e
Document Page
Running Head: PROJECT MANAGEMENT THEORY AND PRACTICE April 26, 2018
ANSWER B
Leadership skills for managing the challenges which is facing by the Project Manager in case
of music award event:
Project leadership is always an increasing popular field along with an interesting along with
increasing popular field for any investigation. It is also growing as per relevance and importance
on behalf of the projects which is needed to be delivered with more complex and also uncertainty
of the environment where it can be required more number of leadership which should be like an
effective project managers with the skills and his competencies. The characteristics for the project
are required to identify the importance characteristics of the project so that it would not affect any
time lap or the skills and the competencies as per the work pf the project manager (Golini, et al.,
2015).
In the case of the Music Award Program, the project manager has to maintain the relationship
there are people from different cultures and languages with which he is needed to set the project o
that very day which would become live throughout the world. It is thus very necessary to have
effective management ability within project manager. This is necessarily being reflected with the
bodies of knowledge as per the static set within the projects. The project association with the
characteristics for consistently examined with the consideration for such a factor with the business
environment for regulate various type of program under short and predefined direction.
The project leadership will be effective as per the concepts which are included under the key
project manager of the skills and the competencies which are important for the project success and
thus the change for different projects (Green & Peloza, 2014).
The following ten characteristics are needed for managing this kind of project:
1. Conflict management or resolution.
2. Listening
3. Critical thinking and the also the problem solving
4. The verbal communication
5. Leadership
6. People skills
7. Integrity along with the ethical behaviour and also the consistency.
8. Strong in case to build up the teams
9. Verbal communication
12 | P a g e
Document Page
Running Head: PROJECT MANAGEMENT THEORY AND PRACTICE April 26, 2018
10. Understanding with balancing the priorities.
In case to change the order of importance of the project management skills along with
consistency that is provided by the general leadership and the literature and that is suggested
for the environmental characteristics with uncertainty as well as the volatility when the project
is combined of many types of short programs like the music award project (Project
Management Institute, 1997).
TASK 4
ANSWER A
The company ABC is found to be aware with their production for the widgets which would not
continue for satisfying the demands of the clients. It has been noted that in each year there is an
increment of 10% with widgets over the last 5 years with no end of the sight for the increase under
demand. Also the internal team has been asked by CEO for reviewing the current manufacturing
processes along with the propose changes for the processes along with the upgrading of equipment
for meet up the demands in the future. In case of the proposal of the team as submitted to the
CEO, there is the recommendation for the upgradation with the manufacturing equipment as per
the redesign for the production line under no solid metrics that is related with the number for the
anticipated for increases. Also there is some missing or the critical related to the outcome, has
progressed with the analysis. It has been noted from this that has been happened with
procurement, warehousing and also the delivery stage. With the changes that is made under the
manufacturing process and also the experiences under such projects for another company. The
CEO has been chosen for engage the project management for consulting the company ABC, their
Z projects for outlining the project plan as the initial stage. The Z project of the company ABC has
seen to be undergone with the overall process of the improvement initiatives. Also the CEO can
know that the efforts have been more likely is implemented successfully while it has been working
as the well-managed project (Office Administration and Automation, 2006).
ANSWER B
13 | P a g e

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Running Head: PROJECT MANAGEMENT THEORY AND PRACTICE April 26, 2018
For the purpose of having efficient process improvement life cycles the production of the
company ABC per day as 250 widgets. At the time while undertaking the process improvement
initiative the client demand is needed to adjust to reach it by 250 and also the demand which is
increased by 10% annually over the last five years will disappear from the last five years and will
again appear while the increment will continue for the purpose of foreseeable future.
For the purpose of the improvement of the manufacturing processes through the changes as
directed as well as the upgradation of the equipment while the goal to production is increased up
to 400 widgets per day. Depending on the present projections, this company has to experience for
five year timeline before it have to undertake other for increasing the production for satisfying the
growing client demand. In this aspect, while the demand of the client is continued for increasing,
there would be better position for investing another manufacturing site in case they can meet the
demands after the mark of five years.
In addition with this the present production line, there was a 3.6 % defect rate in case of widgets
produced. With respect to this project there is the specific directive that has to attempt for reducing
the defect rate by half in next two years.
Also, for the following project, it has been discovered during the project as below:
1. Capacity of procurement that has been limited due to cash flow along with the budgetary
issues along with the storage. For the new process it is needed to have the consideration
once the production will increase and that would allow the smooth flow within the
procurement as well as the manufacturing.
2. Also, once the widgets of the manufactured have been increased, the demand for the
warehousing and also the delivery would increase accordingly ( HEFLO BPM, 2017).
The project has to run slightly over the projected timeline and thus it would remain within the
budget. From the other underestimated timeline, the space thus required has to store as
manufactured the widgets prior with the delivery. Thus it is needed to occur with the great extent
as there is lowering of the defect rate by 0.6 % approximately, and this will increase the goal by
1.8% significantly. Also the increase in the number of widget unites is needed to store. As there
was not any anticipated contingency plan, it would not unhappy their executives.
14 | P a g e
Document Page
Running Head: PROJECT MANAGEMENT THEORY AND PRACTICE April 26, 2018
REFERENCE LIST
HEFLO BPM, 2017. Process mapping steps: 11 easy to follow steps. [Online]
Available at: https://www.heflo.com/blog/process-mapping/process-mapping-steps/
[Accessed 2018].
Binder, J., 2016. Global project management: communication, collaboration and management
across borders.. Abingdon, London: Routledge..
Burke, R., 2013. Project management: planning and control techniques. New Jersey,USA:
Pearson.
Eventus Training & Events Ltd, 2018. Indoor Team Building. [Online]
Available at: http://www.eventus.co.uk/effective-vs-ineffective-teams/
[Accessed 26 04 2018].
Fleming, Q. & Koppelman, J., 2016. Earned value project management.. New York: Project
Management Institute.
Golini, R., Kalchschmidt, M. & Landoni, P., 2015. Adoption of project management practices:
The impact on international development projects of non-governmental organizations..
International Journal of Project Management, p. 33.
Green, T. & Peloza, J., 2014. Finding the right shade of green: The effect of advertising appeal
type on environmentally friendly consumption. Journal of advertising, 43(2), pp. 128-141.
Kiu, M. et al., 2017. The roles, challenges & improvement of project manager in project financial
management in building development in Penang, Malaysia. International Journal of Supply Chain
Management (IJSCM), , pp. 238-245..
Larson, E. & Gray, C., 2013. Project management: The managerial process with MS project..
New York: McGraw-Hill.
Office Administration and Automation, 2006. Project management: a systems approach to
planning, scheduling, and controlling, second edition. Office Administration and Automation, pp.
45-59.
Open Book Publishing, 2018. 11.2 RISK MANAGEMENT PROCESS. [Online]
Available at: https://pm4id.org/chapter/11-2-risk-management-process/
[Accessed 26 04 2018].
15 | P a g e
Document Page
Running Head: PROJECT MANAGEMENT THEORY AND PRACTICE April 26, 2018
Project Management Institute, 1997. A PROJECT MANAGEMENT AND CONTROL SYSTEM
FOR CAPITAL PROJECTS. Project Management Journal , pp. 277-286.
16 | P a g e
1 out of 16
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]