Running head: PROJECT PLANNING AND BUDGETING
PROJECT PLANNING AND BUDGETING
Name of the Student:
Name of the University:
Author’s Note:-

PROJECT PLANNING AND BUDGETING
1
Table of Contents
Scope management planning:-...................................................................................................2
Scope and Background:-........................................................................................................2
Project goals:-.........................................................................................................................2
Deliverables:-.........................................................................................................................3
Assumptions:-........................................................................................................................3
Constraint:-.............................................................................................................................5
Project scheduling:-....................................................................................................................6
Gantt chart:-...........................................................................................................................6
CPM and critical Path............................................................................................................6
WBS:-.....................................................................................................................................7
References:-................................................................................................................................8

PROJECT PLANNING AND BUDGETING
2
Scope management planning:-
Scope and Background:-
The project of vehicle maintenance services is a theoretical commercial vehicle
preservation facility and is planned to comprise characteristics that are usual in small‐scale
profitmaking buildings. The agreement itself is expected to be a static‐price, stable‐scope
arrangement between the contractor and owner. Entire zoning approvals and code have been
achieved, and construction can initiate instantly upon delivery of the announcement to
proceed.
The vehicle repairing space is constructing for controlling pickup light vans and
trucks. The repairing area covers oil and lube, vehicle lifts, air conditioning, and coolant
service apparatus, as well as pneumatic and electrical power channels. Warming of this space
is completed with postponed gas‐fired boiler units. The dense wind is delivered by an air
compressor positioned in an adjacent room.
The cooling and heating of the office capacities are completed applying two systems,
every containing of external condenser unit and air controlling units in an entire room, and
ductwork fixed above the deferred ceiling. The standard lighting and power, the building, has
contemporary data and voice systems, as well as an online fire alarm structure.
Project goals:-
Determining the project goal is very much essential for any project. The vehicle
maintenance operators are critical associates of a vehicle management group accountable for
sustaining vehicles in protected, productive working conditions. By carrying out systematic
repairing and preservation in line with constructors’ references, the vehicle authority can
decrease vehicle interruption, raise driver fulfillment, and control maintenance budgets.

PROJECT PLANNING AND BUDGETING
3
The fundamental goal of this project is to reduce and control vehicle functioning
costs. By decreasing the threat of interruption, the user can evade the charges of vehicle
repossession, emergency maintenances, or unnecessary parts replacements. Systematic
repairing and preservation also back to vehicles’ fuel effectiveness, assisting to decrease
vehicle fuel charges. The authority can use vehicle supervision software to investigate vehicle
performance information, like as fuel budget and strategy maintenance, to evade extreme fuel
depletion.
Many organizations use vehicles to supply goods to clients or deliver vital transport
for essential employees, like as sales agents or facility engineers. To certify that vehicles are
accessible to fulfill these necessities, the authority must be fixed an objective of reducing
vehicle interruption. By carrying out vital repairing, they can reduce the threat of a collapse
that would create the vehicle unreachable while the vehicle was being improved and
renovated.
Deliverables:-
Task Name Duration Start Finish
Project Management 10 days Thu 26-03-20 Wed 08-04-20
Initial Site Work 18 days Thu 09-04-20 Mon 04-05-20
Foundation 35 days Tue 21-04-20 Tue 09-06-20
Structure and Envelope 44 days Thu 11-06-20 Wed 12-08-20
Interiors – Office Area 66 days Tue 28-07-20 Wed 28-10-20
Service Bays 25 days Wed 12-08-20 Wed 16-09-20
Final Site Work 35 days Tue 04-08-20 Tue 22-09-20
Project Closeout 17 days Mon 26-10-20 Wed 18-11-20
Assumptions:-
Assumption plays an essential role in any project management plan. When
constructing the commercial case for a project, expectations must be involved. Expectations
play an essential role in serving project teams, and shareholders set outlooks and recognize
risk mitigation plans, thus growing the probabilities of fulfilling objectives (Lorenzen,

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
PROJECT PLANNING AND BUDGETING
|10
|5697
|18

Assignment Project Management
|16
|3080
|22

Project Management Isn't Just For Project
|10
|1445
|19

Essendon & Buckley Street Level Crossing Removal Project Scope Statement
|11
|1455
|267

Security in Major International Sporting Competition | Report | Doc
|4
|709
|42

Project Management: Risk Assessment, Cost Estimation, and Schedule
|17
|3177
|439