1PROJECT SCOPE AND TIME COST MANAGEMENT Reflective Journal Describe The most important thing that I learned in the week 6 is the PERT analysis. This lecture provided me a real life concept regarding the PERT analysis. Apart from the notes I read many journals regarding the PERT analysis (Akpan & Agadaga 2020).I have learned this topic from a guest lecturer. The most important point that I learned in this PERT analysis was the probability concept in PERT. It was a most interestingbecause in PERT, the time duration of a particular activity is a random variable with a huge amount of variances. I have learned three estimates of activity’s duration. It helped me gain a vast knowledge regarding the optimistic duration and pessimistic time of PERT. From this lecture, I came to know regarding the problem with PERT, estimated project duration and Z value (Ba'Its, Puspita & Bay 2020). The lecturer pointed out all the topics of the PERT. No students asked the lecturer for providing a detailed description regarding the PERT analysis. Interpret This lecture helps me to increase the strength of using the PERT analysis (Nouban, Alijl & Tawalbeh 2020). Asking questions and clearing the doubts regarding this topic helps the lecturer to understand whether a student is getting the topic or not. Evaluate Main advantage of this lecture is that the teacher allows us to ask questions regarding the PERT analysis. It helps me clear many doubts regarding the PERT analysis. Previously, I thought that PERT analysis was a very difficult topic (Onifade & Oroye 2020). However, after attending the lectures, I feel that it is not so much difficult.However, we would ask much questions to the teachers that I expected we should.Knowing the importance of
2PROJECT SCOPE AND TIME COST MANAGEMENT questioning to achieve the object of clarificationis important for me to enhance my confidence in the field of project management. Plan I believe that this topic will be very useful for me while conducting a project in near future. It will give me an edge when I shall work in any real life projects in my professional career. I shall use the PERT Chart analysis to check whether the project can be finished within the assigned deadline. It helps me to understand the objective dimensions and any subjective aspects of this topic. In this PERT Chart analysis, I have learned optimistic duration and pessimistic time, which I am able to apply in any future projects. However, I am unsure whether any tool is available for calculating the probability of the PERT chart. I would like to know more about the implementation of the PERT Chart and drawbacks of the PERT Chart. It helps me to understand what the disadvantages of PERT Chart are (Akpan & Agadaga 2020). I find one issue in this PERT Chart that it gives unreliable data for a project for cost or time. In my practice, I shall use questioning methods for clarifying the objectives of using the PERT analysis in project management. In my career, I shall raise questions to my own thoughts regarding the PERT analysis and try to resolve those one.
3PROJECT SCOPE AND TIME COST MANAGEMENT References Akpan, N.P. & Agadaga, G.O., 2020. Modelling Building Renovation Using PERT.Asian Research Journal of Mathematics, pp.25-38. Ba'Its, H.A., Puspita, I.A. & Bay, A.F., 2020. Combination of Program Evaluation and Review Technique (PERT) and Critical Path Method (CPM) for Project Schedule Development.International Journal of Integrated Engineering,12(3), pp.68-75. Nouban, F., Alijl, N. & Tawalbeh, M., 2020. Integrated earned value analysis and their impact on project success.International Journal of Advanced Engineering, Sciences and Applications,1(1), pp.34-39. Onifade, M.K. & Oroye, O.A., 2020. Application of Artificial Neural Networks Technique to Project Management and Control: A Pilot Assessment of Some Firms in Lagos, Nigeria.algorithms,2(1), pp.40-46.