logo

Report on ICT Project Management

8 Pages1349 Words56 Views
   

Added on  2020-04-15

Report on ICT Project Management

   Added on 2020-04-15

ShareRelated Documents
Running head: ICT PROJECT MANAGEMENTICT Project Management Name of the Student Name of the University Authors Note:
Report on ICT Project Management_1
ICT PROJECT MANAGEMENT IntroductionIntroduction1Table of ContentsIntroduction..........................................................................................................................3Project methodology is and its role in project management............................................3Prince 2 vs PMBOK........................................................................................................3Prince 2 in relational to PLC (Project Life Cycle)..........................................................3Conclusion...........................................................................................................................3References............................................................................................................................3
Report on ICT Project Management_2
ICT PROJECT MANAGEMENT IntroductionIntroduction2Introduction Project methodology is nothing but a method or technique which is used by projectmanager for achievement of goals and result within a given time and budget. In the comingpages of the report role and importance of project manager has been discussed in details (Ferverset al., 2013). After that a comparison has been provided regarding the two methodology ofproject management that is Prince2 and PMBOK. In the last phase of this report relation ofPrince2 to PLC that is project life cycle has been discussed in details.Project methodology and its role in project managementFor achieving goals and proper results within in a given time and budget a managermakes use of project (Pitman et al., 2014). Irrespective of its field project methodology its aimsin helping manager at every step which starts from initiation phase to closure phase. Amethodology is nothing but a model which is used by project manager for carrying out functionslike designing, planning, implementation or use and lastly achieving its goals. NASA make use of specific or particular methodology for building space station on thecontrary NAVY makes use of some other methodology or technique for building submarines(Siegelaub, 2014). So there is various project management methodology to satisfy the needs ofvarious project which works in various domains of business. Prince 2 vs PMBOK PMBOK stands for project management Body of Knowledge while Prince2 stands forProject management in Controlled Environment. Prince2 is structured PM methodology whilePMBOK is standard and Guide (Yeong, 2017). Prince2 is practical in nature and mainly focuseson some of the important and critical areas on the contrary PMBOK is comprehensive in nature.
Report on ICT Project Management_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Project Methodology and its Role in Project Management
|6
|1113
|40

ICT Project Management Solved Assignment
|9
|1384
|64

ICT Project Management Assignment Sample
|9
|1571
|167

Project Management: PMBOK Vs PRINCE2 and PRINCE2 in Project Life Cycle
|8
|1556
|206

ICT Project Management: Methodology, PMBOK and PRINCE2
|7
|1148
|439

Waterfall vs Pmbok Methodology
|7
|1316
|62