logo

Project Methodology and its Role in Project Management

6 Pages1113 Words40 Views
   

Added on  2020-04-13

Project Methodology and its Role in Project Management

   Added on 2020-04-13

ShareRelated Documents
Running head: PROJECT MANAGEMENT Project Management Name of the Student Name of the University Authors Note:
Project Methodology and its Role in Project Management_1
PROJECT MANAGEMENT ReferencesReferences1Table of ContentsIntroduction..........................................................................................................................2Project methodology and its role in project management...............................................2Prince 2 vs PMBOK........................................................................................................2Prince 2 in relational to PLC (Project Life Cycle)..........................................................4Conclusion...........................................................................................................................4References............................................................................................................................6
Project Methodology and its Role in Project Management_2
PROJECT MANAGEMENT ReferencesReferences2Introduction Project management is nothing but certain discipline which is generally used forestablishment of principles, methods and policies for proper management of projects. Projectmanagement mainly analyzes the planning, organization and implementation of project(Elkington & Smallman, 2012). In the coming pages of the report following areas like themethodology of project management Body of knowledge (PMBOK) and Prince2 withsimilarities and difference will be discussed in the coming pages of the report. In the comingpages of the report proper relation has been established for project life cycle for the chosenmethodology that is Prince2.Project methodology and its role in project managementThe project manager makes use of certain goals and objective for proper completion ofproject in given time and budget. Irrespective of field, project manager makes use of certainmethodology which helps them at every stage that is from initiation phase to closing phase(Fervers et al., 2013). A methodology can be defined as a method or technique which can beeasily be used by various project manager for having range of function that is from designing toachievement of goals. These stages are design, proper planning, use or implementation and lastlyfollowed by achievement of goals. Prince 2 vs PMBOK Prince2 stands for Project Management in Controlled Environment while PMBOK standsfor Project management Body of Knowledge. PMBOK model can be defined as standard andguide methodology on the contrary Prince2 methodology is considered to be structured ProjectManagement (PM) methodology (Parker et al., 2013). Prince2 is the considered to be practical
Project Methodology and its Role in Project Management_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Report on ICT Project Management
|8
|1349
|56

ICT Project Management Assignment Sample
|9
|1571
|167

Project Management: PMBOK Vs PRINCE2 and PRINCE2 in Project Life Cycle
|8
|1556
|206

Comparison of PMBOK and PRINCE2 Project Management Methodologies
|6
|1354
|250

Project management Sample Assignment doc
|7
|1378
|78

Project Management Methodologies- Assignment
|7
|1167
|35