2 PROJECT MANAGEMENT Answer 1 It is essential to identify and schedule the he project resources at an early stage because it helps in adding a safety margin to estimate that is set up for completing the work on time. Finding the right resource and managing their outputs is essential for keeping the project on schedule (Kerzner, 2013). Answer 2 The over allocation of resources can be managed by extending the work hour or the usage of the resource. Furthermore, delaying the start of a particular task main further help in eliminating the problem of over allocation. Answer 3 For ensuringbestperformance oftheproject,ensuring aproperprojectplanning according to the available resources is essential. The precise estimation of the activity duration is further essential in ensuring an optimal performance of the resources. Answer 4 Analysis of the critical resources is an essential aspect of project planning. The critical resources cannot be compromised as the critical path activities are generally the longest duration path of a network and therefore, the task lie on the critical path cannot be delayed. If the task of the critical path is delayed, it may result in delaying of the entire project schedule. Therefore, giving priority to the critical path activities is essential to analyze (Böhme et al., 2012). Answer 5
3 PROJECT MANAGEMENT The different ways of maximizing the performance of resources include setting a clear goal of the project and taking the full advantage of technology. Technology can help in making the task easier and completing the tasks in considerably less time. Furthermore, proper decision making is essential for ensuring success of a project and therefore, it is a good idea to involve all the team members in critical decision-making. The introduction of a reward system may further help in increasing the efficiency of the work done. Discussion Question 2 Answer 1 Cost control system is an important part of an organization or a project and therefore successful management of the cost control system is essential for ensuring the success of a project. Controlling the baseline costis a primary step of maintaining and effective control system.The second step is identifying and understanding thelong term application costs related to a project.Leveraging the current systeminvestments is another step for effective cost control system. Furthermore, implementation ofshort term cost cutting measuresare essential for controlling the cost of the system. Answer 2 The inaccuracy in the cost estimates is one of the major reason of cost overrun apart from improper planning and scope management of the project (Subramani, Sruthi & Kavitha, 2014). The cost overruns can be addressed by properly identifying the unexpected delays in the project. It is an essential part of the risk response plan. In order to prevent the scope creep,
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
4 PROJECT MANAGEMENT proper comparison of the scope baseline with the work performed is essential. A clear scope definition along with the elimination of the project ambiguity is required for addressing the cost overrun in a project (Bucciol, Chillemi & Palazzi, 2013)
5 PROJECT MANAGEMENT References Böhme, D., Wolf, F., de Supinski, B. R., Schulz, M., & Geimer, M. (2012, May). Scalable critical-pathbasedperformanceanalysis.InParallel&DistributedProcessing Symposium (IPDPS), 2012 IEEE 26th International(pp. 1330-1340). IEEE. Bucciol, A., Chillemi, O., & Palazzi, G. (2013). Cost overrun and auction format in small size public works.European Journal of Political Economy,30, 35-42. Kerzner, H. (2013).Project management: a systems approach to planning, scheduling, and controlling. John Wiley & Sons. Subramani,T.,Sruthi,P.S.,&Kavitha,M.(2014).CausesofCostOverrunIn Construction.IOSR Journal of Engineering,4(6), 1-7.